• Title/Summary/Keyword: New engineering contracts

Search Result 37, Processing Time 0.02 seconds

A Selection Model of Suitable Tendering System for Public Construction Projects (공공건설공사의 최적 입찰방식 선정모델)

  • Yu, Il-Han;Kim, Kyung-Rai
    • Korean Journal of Construction Engineering and Management
    • /
    • v.9 no.3
    • /
    • pp.164-174
    • /
    • 2008
  • It is crucial In decision making to select a project delivery system (PDS) adjusted accordingly to the project characteristics. Furthermore, selecting a tendering system is the kernel in the process of selecting PDS. In October 2007, the Ministry of Finance and the Economy of Korea launched two new project delivery systems, "Best Value Contract (Design-Bid-Build)" and "Bridging Contracts (Design-Build)" by revising enforcement ordinances of "Act on Contracts to Which the State is a Party" to provoke the tendering systems. In order to support the proposed purpose, this research developed a selection model for suitable tendering system, which helps a public owner select a tendering system appropriate to the project characteristics. First, the framework of the model was set throughout analyzing previous researches and interviewing relevant experts. Additionally, by analyzing the survey result from 265 experts engaged in architectural and civil engineering business, the relative weights of the selection factors and the effectiveness values of the alternatives were suggested as the quantitative evaluation references. Finally, the practical guideline was suggested to apply this model to three public projects scheduled to be delivered. The result of applying the model to three case projects showed that further researches were needed to make the selection process logical and to suggest the standard weights and effectiveness values according to project type.

The Improvement Plan of Project Delivery Systems in the Public Construction Projects (공공건설사업의 발주방식 개선방안)

  • Choi, Eun-A;Kim, Hyun;Park, Sung-Yong;Cho, Hyeong-Jin;Lee, Sang-Beom
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.509-512
    • /
    • 2008
  • Clients demands have been changed by construction circumstances such as high-technology, mega-projects, and the complexity of construction. Advanced foreign countries have already introduced and applied new project delivery systems(i.e, CM, DB, etc.) to deal with the change of such that. Recently, Korea also launched two new project delivery systems, "Best Value Contracts to which the State is a Party" to provoke the project delivery system, which helps a public owner select a project delivery system appropriate to the project characteristics. Even though government has made his efforts as stated above, some clients have still used those to public construction projects uniformly. That is because there are not a selection criteria of project delivery system for clients. Therefore, this paper proposes the selection criteria of project delivery system based on project types in the public large construction projects.

  • PDF

A Study on Characteristics of Neo-Avant-Garde in Furniture Design -Focusing on the Thought before and after the 1960s- (가구디자인에 있어서의 네오-아방가르드적 특성 연구 -1960년대 전후 사조를 중심으로-)

  • Choi, Lee-Seoung;Kim, Hyung-Woo
    • Journal of the Korea Furniture Society
    • /
    • v.19 no.3
    • /
    • pp.180-192
    • /
    • 2008
  • The historian called Peter Burger divided it into historical avant-garde before and after the first World War (Dadaism, Futurist, Geometric Abstract, etc.) and Neo- avant-garde during the period of forming social foundation that would be ready to accept new forms of art in the USA, the center of capitalism, after the 2nd World War such as pop art and conceptual art including the then emerging avant-garde minimal art. Meanwhile, he interpreted that Neo- avant-garde succeeded the spirit of historical avant-garde. For modem furniture, the avant-garde terminologies are discussed from the aspect of epistemology or symbolism. On the other hand, they would be exclusively used for advertising slogans, however, it is considered as difficult due to vague terms or their characteristics. This study relates the points of historians such as Peter Burger for theoretical proposal and Richard Kostelanetz's point for formal issues, and contracts and arranges the avant-garde terminologies and its characteristics to the meaning of "getting out of the present decadent trend - aiming for future", "transcending the present aesthetic custom - renovation" and "violating the rules already established in the process of entering new areas - freshness of unfairness". The study was meaningful in providing fundamental clues based on the historical discussion and artists for Neo- avant-garde in the 1960s, that is, the mainstream of design at the end of the 20th century in the period when an avant-garde oriented alternative in the 21st century design has been sincerely required overflowed with the fin de siecle phenomenon.

  • PDF

Analysis of Competency Assessment Using IPA for Construction Project Managers (IPA 기법을 활용한 현장소장 역량 요인 도출 및 분석)

  • Kim, Hwa-Rang;Lee, Na-Kyung;Jang, Hyoun-Seung
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.1
    • /
    • pp.115-123
    • /
    • 2013
  • Changes have occurred in the professional capabilities of the construction project managers after the global financial crisis. As representatives of construction companies and projects, construction project managers have full responsibility over a construction project. Throughout its life cycle, from design through construction to completion, the business capabilities of such managers are regarded as critical elements in the changes in the country's construction economy. Therefore, this study aimed to determine the main capabilities of current construction project managers, and to analysis of its competitiveness using Important-Performance Analysis(IPA). The results of IPA were as follows; (1)capability to win new contracts and capability to collect information of new project are needed for external relation competitiveness, (2)gerentocratic management mind-set and active breakthrough are needed for internal project management competitiveness, and (3)capability to predict issues and self-improvement are needed for self discipline competitiveness. However, this work is still considered to provide the basic data that can help Korean construction companies who plan to educate the project manager's strengthen their medium and long-term capabilities.

Project Delivery Systems and Project Performance;An Evaluation Model for Public Construction Projects (공공건설사업의 발주방식 선정 및 성과평가 모델)

  • Yu, Il-Han;Kim, Kyung-Rai
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.41-47
    • /
    • 2007
  • The selection of the reasonable project delivery system (PDS) is crucial for a successful performance of a project, which means to achieve project objectives. Furthermore, the project performance has been tightly related to the selection of PDS appropriate to pertinent project characteristics. In this context, the ministry of finance and economy of Korea launched two new project delivery systems called "Best Value Contract (Design-Bid-Build)" and "Bridging Contract (Design-Build)" in October of 2007 by revising enforcement ordinances of "Act on Contracts to Which the State is a Party". For efficient operation of the new project delivery systems, this paper suggested a PDS selection model which supports decision making of the reasonable PDS for a pertinent project by assessing characteristics of the public construction projects, both quantitatively and qualitatively. In addition, a PDS performance evaluation model was proposed in order to get feedback on the result of the PDS selection and the operation for the succeeding project. The standard models suggested in this paper might be used as a tool to support the decision making of the public organizations.

  • PDF

An Analysis on the Operation Model of Islamic Insurance (이슬람보험 운영모델 분석)

  • CHOI, Mi-Soo
    • THE INTERNATIONAL COMMERCE & LAW REVIEW
    • /
    • v.69
    • /
    • pp.453-472
    • /
    • 2016
  • As globalization is widely expanded in Islamic world as well as huge capital like oil-money is looking for new investment areas, our government should keep eyes on the current situation of Muslim market. This study will focus on the research of operation model of Islamic insurance. It will analysis on the institutional aspects of Islamic insurance(Takaful) system, which is a step further on the basis of these previous researches about Islamic finance. Takaful is conducted with various machanism such as Wakala, Mudarabah, Waqf. The mechanism can also be intermingled with one another to form other diverse contracts. However most of them are focused on basic conceptual elements of Islamic insurance system. As public interests in Islamic insurance are increasing these days, many Islam related literatures are issued accordingly. But most of them were focused on basic aspect of Islamic financial system or on the study of business management structure. The conceptual approach to evaluate the Islamic insurance market shall become the foundation of operation in conventional business law and regulation penetrate to the Islamic business environment. Therefore, the research of the operation model in Islamic insurance system as well as the search of trade engineering basis.

  • PDF

A Study on a Strategy to Enhance the Transparency of the Bidding and Contract System for Public Construction Projects (공공건설사업 입찰 및 계약제도측면의 투명성 확보 전략에 관한 연구)

  • Cho, Young-Jun;Kim, Jong-Ouk
    • Journal of the Korea Institute of Building Construction
    • /
    • v.10 no.6
    • /
    • pp.109-116
    • /
    • 2010
  • A construction project consists of many types of contracts. In the process of selecting the successful contractor after bidding, there will inevitably be fierce competition, which may lead to corruption or bribery. Even after signing the contract, during the period of settling the amount of the contract, bribery could occur. Such corruption could harm the development of the construction industry. It is, therefore, necessary to establish a strategy to prevent corruption by strengthening the transparency of the bidding process. In this study, to prevent corruption in the construction industry, a new service is proposed in which the successful bidder is selected by a professional third party, and the introduction of diverse delivery systems for construction projects and the invigoration of alternative methods of settling disputes are also proposed in this study.

BUSINESS PROCESS ENGINEERING IN THE CONSTRUCTION INDUSTRY

  • Brenda L. P. Yip;Ping Yung
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.622-627
    • /
    • 2009
  • Business process engineering (BPE) is a top-down management approach for increasing efficiency and productivity through radical and fundamental changes to the business processes of the organization. BPE requires firms to initially develop a model of the existing business processes of the firm to distinguish functional tasks from processes used for coordinating inputs, activities and outputs. The model is used for understanding the business processes in the organization and to simulate the effect of changes to the processes. The model can also be used to justify business processes, which involves assessing whether the business process provides value to the customer in its current configuration. Justification requires a careful examination of the key business processes used by the firm to identify systemic shortcomings in the process and to create a new business process to produce greater efficiency. BPE also considers automating as many business processes as possible to increase operational efficiency and the integration of business process tasks. The construction industry has been slow to adopt BPE because of its project approach in which a major firm contracts with various functional service providers and regards each project as unique. The industry focuses on functional task efficiency rather than business process efficiency. There is no formal methodology or criteria for determining whether a business process is effective for a construction firm in its current configuration. The use of performance measures such as costs, task duration times or other metrics can be useful in evaluating the effectiveness of an existing business process and for modeling the possible outcome of a fundamental and radical change to the process.

  • PDF

Development of Construction R&D Strategy through the International Construction Market Analysis (해외건설 시장 분석을 통한 건설기술개발 전략 수립)

  • Park, Hwanpyo;Kim, Seok
    • Korean Journal of Construction Engineering and Management
    • /
    • v.17 no.2
    • /
    • pp.49-57
    • /
    • 2016
  • R&D projects for land, infrastructure, and transportation is to identify challenges through academic-industrial demand survey, and to promote R&D projects through detailed planning projects. These R&D projects have been promoted to be applied to most domestic project-oriented. Despite continuous R&D investment, the investment has been promoted to the world top technology rather than to international construction projects. This study analyzed the international construction market trends and international construction contracts in order to promote technology development for enhancing international construction competitiveness. This study suggests three R&D technology development directions and ten research projects for expanding international construction projects.

Development of an Operation Model for Technical Proposal-Based Tender of Public Construction Projects (공공건설공사의 기술제안형 입찰 운영모델 개발)

  • Yu, Il-Han;Kim, Kyung-Rai
    • Korean Journal of Construction Engineering and Management
    • /
    • v.9 no.2
    • /
    • pp.136-145
    • /
    • 2008
  • Recently the Ministry of Finance and Economy of Korea launched two new project delivery systems called "Best Value Contract (Design-Bid-Build)" and "Bridging Contract (Design-Build)" in October of 2007 by revising enforcement ordinances of "Act on Contracts to Which the State is a Party". These project delivery systems require the bidders to submit technical proposal adjusted to the project characteristics and objectives for selecting the contractor by evaluating technical proposals. This research aimed to suggest guideline to effectively operate the project delivery systems described above. To reach the goal of the research, the framework of the operation model was developed, which includes the four categories: the standard bidding process, the technical proposal requirements, the technical proposal evaluation criteria, and the award methods. The contents of the four categories above were fulfilled throughout conferring with the advisory experts. In particular, the award methods, which are the important decision-making factor in the perspective of the owner, consist of four types: Low Bid-Fully Qualified, Weighted Criteria, Adjusted Bid, and Adjusted Score. The quantitative features and application criteria of these four types of award methods were suggested throughout the simulation using the virtual case.