In Japan, the population progresses to the extreme aging society and it is entering the phase of the population decrease while the population increase is continuing in the world. The construction market is expected to shrink accordingly, however the situation of labor shortage is expected to continue at a faster rate, because the aging of construction workers is progressing and new younger labor force cannot be secured. In order to supplement the labor shortage, it is required to progress mechanization, automation, labor saving, and efficiency improvement by utilizing the information well in each stage in a series of flow of planning, design, construction, operation, and disassembly in one building. The measures to maintain and expand the construction market by the new efficiency improvement techniques which enhance the utilization degree of building information are required. Currently, the elemental technologies which utilized BIM (Building Information Modeling) are accumulated by advancing digitization in each phase. DX (Digital transformation) in the construction industry can be achieved by the technology maturing and having a series of continuities. It is anticipated that this will evolve to a new method which is unprecedented. Present status of BIM and mechanized constructions in Taisei Construction are introduced, and future prospect is described.
The amount of new apartment construction has been trending upward in 3~4% each year since 11% increase in 2002. Currently, in public apartment construction sites under separate delivery system for construction waste processing, the significant difference between estimated quantity for contract and actual amount frequently causes severe controversy among project participants. Many factors such as poor environmental management, inadequate contractual amount are assumed to influence the above problem, and the requirement to revise existing generation rates, the key criteria applied in estimating the quantities of waste, is increasing. Most of generation rates were established in early 2000's, and have difficulty in reflecting the changes from new materials and technologies accordingly. Therefore, this study aims to clarify the types of construction waste for each trade and the forecast method as preliminary work in order to develop more accurate generation rates for construction waste in new construction. To achieve this purpose, the architectural bills of quantities in ten apartment projects executed during 2010~2013 were collected, and the possible waste types and reasonable material loss ratio for each item from temporary works to owner-supplying material area were defined and compared through the workshops and interviews with the experts and on-site environmental managers. The results of this study will contribute to establishing the categories of construction waste for construction trades and proper generation rates by the indirect estimation method in new apartment construction in the follow-up study.
D. Aparna;D. Sridhar;J. Rajani;B. Sravani;V.S.S. Kumar
International conference on construction engineering and project management
/
2005.10a
/
pp.366-370
/
2005
The construction environment is dynamic in nature and is characterized by various degrees of uncertainties. The uncertainties such as lack of coordination, non availability of resources, condition of temporary structures and varying weather conditions have a significant impact on estimating the duration of activities. These are subjective, vague and imprecisely defined and are expressed in subjective measures rather than mathematical terms. Conventionally, various quantitative techniques such as CPM and PERT have emerged in construction industry. These techniques cannot solve the above problems and rely on human experts which may not always be possible. In such situations Artificial Intelligence tools such as fuzzy sets and neural networks handle such variables and provide global strategies. The present paper evaluates the effect of qualitative factors to identify the activity duration using new intelligent approach. The results are compared with conventional methods for effective project management. A case study is considered to demonstrate the applicability of fuzzy logic for project scheduling.
International conference on construction engineering and project management
/
2015.10a
/
pp.21-22
/
2015
Productivity has been a wide-ranging challenge for the construction industry, both in Australia and globally. Particularly in Western Australia's construction and resources sectors, continuously low productivity will potentially discourage future investments. The emergence of the global marketplace necessitates that the supply chain needs to focus on the concept of the holistic efficiency. The isolated geographical position of Australia only exacerbates this phenomenon. In recent years, Building Information Modelling (BIM) has been suggested as an efficient way to help productivity improve and information management throughout supply chains. This keynote talk will focus on discussing ways of implementing BIM to enhance site productivity focusing on Western Australia's construction projects. It will show new trends of its applications to accomplish an innovative way in construction project management. The talk will also give an insightful summary of integrated methods with state-of-the-art technologies backboned by the BIM cases from construction and oil and gas industry projects.
Proceedings of the Korean Institute of Building Construction Conference
/
2023.11a
/
pp.163-164
/
2023
The active promotion of construction technology application, aimed at cost reduction, construction time shortening, and performance enhancement during the implementation of Value Engineering (VE) in design, is underway. However, in the process of deriving VE ideas, it is common to simply reuse VE ideas from similar past construction projects, and the application of construction technology is often insufficient. Therefore, in this study, we intend to establish a database linking construction technology information with Building Information Modeling (BIM) models to activate the application of construction technology in the process of deriving VE ideas.
Korean Journal of Construction Engineering and Management
/
v.16
no.3
/
pp.78-90
/
2015
Due to a significant decrease in the number of construction projects in the domestic market of Korea, overseas expansion of the Korean construction companies has been accelerated in recent years. However, the practice of bidding at a low price and lacking information about foreign new markets caused many companies to fail in their entries to these markets. As a measure to prevent such failures, this study has developed a framework which first defines the key research items that must be identified beforehand and then classifies them into a structured way so that the construction companies can actually use this framework to be better prepared for their forays into the new markets. The framework was actually applied for a construction project in Morocco, and its usefulness was proven by the user's successful participation into the project, nevertheless the application and result was limited. Although perhaps this framework should be applied to many more construction projects for its validity to be verified and for its structure to be better standardized, the framework still has its value due to the following two reasons: first, it has systemized the research items that had been only conceptually defined but had never been organized, and second it can be utilized as a investigation tool at the marketing stage.
Xiaohan Zhou;Xinrong Liu;Yu Xiao;Ninghui Liang;Yangyang Yang;Yafeng Han;Zhongping Yang
Geomechanics and Engineering
/
v.35
no.4
/
pp.395-409
/
2023
Long-span suspension bridges have tunnel anchor systems to maintain stable cables. More investigations are required to determine how closely tunnel excavation beneath the tunnel anchor impacts the stability of the tunnel anchor. In order to investigate the impact of the adjacent tunnel's excavation on the stability of the tunnel anchor, a large-span suspension bridge tunnel anchor is utilised as an example in a three-dimensional numerical simulation approach. In order to explore the deformation control mechanism, orthogonal tests are employed to pinpoint the major impacting elements. The construction of an advanced pipe shed, strengthening the primary support. Moreover, according to the findings the grouting reinforcement of the surrounding rock, have a significant control effect on the settlement of the tunnel vault and plug body. However, reducing the lag distance of the secondary lining does not have such big influence. The greatest way to control tunnel vault settling is to use the grout reinforcement, which increases the bearing capacity and strength of the surrounding rock. This greatly minimizes the size of the tunnel excavation disturbance area. Advanced pipe shed can not only increase the surrounding rock's bearing capacity at the pipe shed, but can also prevent the tunnel vault from connecting with the disturbance area at the bottom of the anchorage tunnel, reduce the range of shear failure area outside the anchorage tunnel, and have the best impact on the plug body's settlement control.
KSCE Journal of Civil and Environmental Engineering Research
/
v.26
no.6D
/
pp.961-968
/
2006
Curbs and L-type gutters installed at the edge of a road are very important structures to protect pedestrians from traffic accidents and to restraint slip of cars due to rain. However, existing construction method where great parts of the construction progress are done by human power has many problems in workability, quality and cost etc. In this paper, a new construction method for improvement in workability and quality for curbs and L-type gutters is developed. In order to investigate the structural safety and quality of curbs and gutters installed by the new method, tensile and lateral load tests are performed on curbs installed by existing and new methods and uniaxial compression tests are also performed on concrete samples of gutters constructed by existing and new methods. The test results show that the alignment of curbs and the strength of gutter concrete are very much improved by applying the new method. The tensile and lateral load capacities of the curbs installed by the new method are 10.7 and 2.5 times higher than those of curbs by existing method, respectively.
International conference on construction engineering and project management
/
2015.10a
/
pp.396-400
/
2015
The Building and Construction Industry Security of Payment Act 1999 (NSW) (the NSW Act) is a unique form of statutory regulation for the building and construction industry, which gives virtually all industry participants a statutory right to, and a means of recovering, payments for work done under a construction contract. The research aim is to examine current trends in adjudication applications and determinations under the NSW Act. The data used for this study was the collected by the NSW Office of Finance & Services as part of a regular reporting regime for the period from 1 July 2013 and ending on 30 June 2014. With just over 817 adjudication applications having been made over the 2013/14 period, the data indicates that adjudication is being frequently utilized by stakeholders in the NSW building and construction industry as a means of progress payment recovery. Adjudication is proving to be a popular choice for those making claims of less than AU$250,000. Claimants were awarded about 36% of the total of claimed amounts and claimants are generally successful at adjudication in terms of the proportion of the claimed amounts determined in their favour. This is particularly so in relation to claims of less than $100,000, which represents about 70% of the total applications made over the reporting period. The data indicates that adjudication fees are generally modest enough to conclude that adjudication provides claimants across all claim ranges with a relatively inexpensive means of having disputed progress payments determined by an independent adjudicator.
In this paper, we would like to share our ongoing research on global population and demographic shifts and the corresponding need for diverse responses. As population growth varies worldwide, the pressing issue is the current global housing shortage. The USA alone lacks 4 million homes, underlining the urgency for new construction and renewal of existing. Our focus is primarily on new building processes, which must also incorporate elements of renewal for future sustainability. Our research addresses several key questions: How will roles for construction professionals change? What should be the primary goal of the design process? What types of technologies are currently available, and which aspects of the process can be enhanced with AI? A significant part of our study is exploring sustainable building methods that reduce embodied carbon and increase speed of construction. Our goal is to extend the transition from smart homes to cities, analyzing the evolution towards smart communities and cities. A critical aspect of our research is the 'kit of parts concept, involving prefabrication and modular construction. This approach is essential for both rebuilding and new projects, potentially lowering costs in manufacturing and design for long term. Lastly, we present a detailed comparison of the construction industry with manufacturing.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.