• Title/Summary/Keyword: New Budget Method

Search Result 136, Processing Time 0.021 seconds

IMPROVEMENT OF WASTE ADMINISTRATION BY NEW PUBLIC MANAGEMENT

  • Kotomi Uemoto ;Seigo Nasu ;Shunji Kusayanagi
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.424-428
    • /
    • 2005
  • As the application of NPM in waste administration branch this paper proposes a new waste management method in order to increase the efficiency of resources and reduce the quantity of waste. First the matrix method is suggested which comprehensively consider and integrate the proposals of different government departments. Moreover the inhabitant's attitude toward the new waste management measures was investigated. Based on the investigation the evaluation function was made, which include three elements: necessary budget, the effect of cost decrease and the environmental burden decrease. The optimal method of budget allocation to maximize social welfare is proposed under the condition of limited budget by the evaluation function. By applying this system further local governments will be able to determine their adequate service level and budget size.

  • PDF

Estimation of the Quantity of Ground Water Recharge using the Water Balance (유역물수지 분석에 의한 지하수 함양량 추정)

  • Park, Chan-Je;Kim, Tai-Cheol
    • Proceedings of the Korean Society of Agricultural Engineers Conference
    • /
    • 2002.10a
    • /
    • pp.265-268
    • /
    • 2002
  • The ground water regime analysis method, numerical analysis method, water budget method, and baseflow analysis method have been used for estimating ground water recharged quantity. This study, adapting water budget concept of unsaturated zone, and saturated zone of the DAWAST model, proposed a new method to estimate ground water recharged quantity.

  • PDF

Artillery Error Budget Method Using Optimization Algorithm (최적화 알고리즘을 활용한 곡사포의 사격 오차 예측 기법)

  • An, Seil;Ahn, Sangtae;Choi, Sung-Ho
    • Journal of the Korea Society for Simulation
    • /
    • v.26 no.3
    • /
    • pp.55-63
    • /
    • 2017
  • In R&D of artillery system, error budget method is used to predict artillery firing error without field firing test. The error budget method for artillery has been consistently developed but apply for practical R&D of the weapon system has been avoided because of lacks of error budget source information. The error budget source is composed of every detailed error components which affect total distance and deflection error of artillery, and most of them are difficult to be calculated or measured. Also with the inaccuracy of source information, simulated error result dose not reflect real firing error. To resolve that problem, an optimization algorithm is adopted to figure out error budget sources from existing filed firing test. The method of finding input parameter estimation which is commonly used in aerodynamics was applied. As an optimization algorithm, CMA-ES is used and presented in the paper. The error budget sources which are figured out by the presented method can be applied to compute ROC of new weapon systems and may contribute to an improvement of accuracy in artillery.

Estimating software development cost using machine-learning approach (학습이론을 이용한 소프트웨어 개발비 예측 모형)

  • Park, Chan-Kyoo
    • 한국IT서비스학회:학술대회논문집
    • /
    • 2005.11a
    • /
    • pp.345-355
    • /
    • 2005
  • As the portion of information systems(IS) budget to the total government budget becomes greater, the cost estimation of IS development and maintenance projects is recognized as one of the most important problems to be resolved for quantitative and efficient management of IS budget. The primary concern in the cost estimation of IS projects is to estimate software development cost. In this paper, we propose a new method to estimate software cost using support vector regression(SVR), which has attracted considerable attention because of its good performance and theoretical clearness. The paper is the first study which apply SVR to software cost estimation.

  • PDF

An Empirical Study on the Effect of public Construction Industry by Expansion of New Budget System (계속비 사업 확대로 인한 공공건설사업 파급효과 분석)

  • Kim, Sang-Bum;Lee, Jeong-Dae;Cho, Ji-Hoon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.9 no.3
    • /
    • pp.153-163
    • /
    • 2008
  • Domestic construction industry accounts about 15% of Gross Domestic Product(GDP) and Korean government spends approximately 50 trillion won per year for public infrastructure projects. Effective management of public construction projects would result in cost saving and enhance financial stability of the government. In doing so, the government promoted a new budgeting system, Continual Budget Method(CBM) as a part of public project performance enhancement program published in 1999. This research mainly attempted to investigate and analyze the impact of new budgeting in term of cost and schedule performance. Based on the analysis result of n2 projects. The new budgeting system could save project cost by 9.83y. Due to the saving of indirect costs from reduction. Although limited government budget cannot allow all the projects to be excuted with the new budgeting system, the new budgeting system should be more-widely utilized in the public sector because of its proven benefits from this research.

Regional Application of the OECD Nitrogen Budget Considering Livestock Manure Compost (국내 가축분뇨 자원화 특성을 고려한 OECD 질소수지 산정법의 지역단위 적용 연구)

  • Lim, Do Young;Ryu, Hong-Duck;Chung, Eu Gene;Kim, Yongseok;Lee, Jae Kwan
    • Journal of Korean Society on Water Environment
    • /
    • v.33 no.5
    • /
    • pp.546-555
    • /
    • 2017
  • The Nutrient budget is one of the agricultural-environment indicators of OECD. A nutrient budget measures the surplus as the differential between the inputs and the outputs of within a certain boundary and within a specified period of time (i.e. one year). According to OECD, the annual nitrogen budget for Korea was $245kg\;N\;ha^{-1}$ in 2014, which corresponds to the first position among OECD countries. In Korea in 2014, about 90 % of livestock excreta was composted as solid and liquid manure, which are usually and customarily spread on agricultural land. The objectives of this study are intended to suggest methodology of the regional nitrogen budget as a nitrogen management tool, which considers conversion from raw excreta to composted manures based on the methodology of OECD/Eurostat, and application of the new method in an agricultural region of Korea. As a result, the calculated excess rate of hydrospheric nitrogen surplus was $251kg\;N\;ha^{-1}$ (in the region in 2014), which indicates the presence of potential risks emanating from excessive nitrogen, with regard to both export water and soil environments. The findings also assert that this was shown to be one of the most important elements in the nitrogen budget, which translates to the actual amounts of nitrogen lost during the solid composting process. To better understand the process and the reliability of the method, it is necessary to analyze the sensitivity of the relevant co-efficients used in the method in the near future.

A Study of the Optimal Procurement to Determine the Quantities of Spare Parts Under the Budget Constraint (예산제약하에서 수리부속 최적조달요구량 산정 연구)

  • Lee, Sang-Jin;Kim, Seung-Chul;Hwang, Ji-Hyun
    • Korean Management Science Review
    • /
    • v.27 no.2
    • /
    • pp.31-44
    • /
    • 2010
  • It is very important to forecast demand and determine the optimal procurement quantities of spare parts. The Army has been forecasting demand not with actual usage of spare parts but with request quantities. However, the Army could not purchase all of forecasted demand quantities due to budget limit. Thus, the procurement quantities depend on the item managers' intuition and their meetings. The system currently used contains many problems. This study suggests a new determination procedure; 1) forecasting demand method based on actual usage, 2) determining procurement method through LP model with budge and other constraints. The newly determined quantities of spare parts is verified in the simulation model, that represents the real operational and maintenance situation to measure the operational availability. The result shows that the new forecasting method with actual usage improves the operational availability. Also, the procurement determination with LP improves the operational availability as well.

Simulation Optimization with Statistical Selection Method

  • Kim, Ju-Mi
    • Management Science and Financial Engineering
    • /
    • v.13 no.1
    • /
    • pp.1-24
    • /
    • 2007
  • I propose new combined randomized methods for global optimization problems. These methods are based on the Nested Partitions(NP) method, a useful method for simulation optimization which guarantees global optimal solution but has several shortcomings. To overcome these shortcomings I hired various statistical selection methods and combined with NP method. I first explain the NP method and statistical selection method. And after that I present a detail description of proposed new combined methods and show the results of an application. As well as, I show how these combined methods can be considered in case of computing budget limit problem.

An Impact of Budgetary Goal Characteristics on Performance: The Case of Vietnamese SMEs

  • LE, Thang Ngoc;NGUYEN, Dung Duc
    • The Journal of Asian Finance, Economics and Business
    • /
    • v.7 no.9
    • /
    • pp.363-370
    • /
    • 2020
  • The paper aims to investigate the impact of budgetary goal on profit growth directly and indirectly through managerial performance. Two main characteristics of budgetary goal mentioning in the study are the clarity of budget goal and the difficult of budget goal. Data of the research collected from survey with 197 department managers and supervisors of 80 SMEs in Hanoi and Ho Chi Minh City who have budgeting responsible. Firstly, by using quantitative research method Cronbach's Alpha and Exploratory Factor Analysis, the research show that characteristic of budgetary goal has significant and positive impact on profit growth directly. Secondly, the regression analysis among variables show that budget goal clarity was positively and significantly related to growth of sale revenue, growth of profit and managerial performance. Therefore, the empirical findings show that that managerial performance has mediating role in the relationship between budgetary goal characteristic and financial performance. The findings of this study suggest that that managers need focus on setting clearer and more difficult but attainable budget goals to increase firm performance. This paper also provides a new insight the relationship between managerial performance and financial performance. Budgetary goal characteristics still have positive but insignificant impact on growth of sales revenue.

Endosymbiotic Evolutionary Algorithm for the Combined Location Routing and Inventory Problem with Budget Constrained (초기투자비 제약을 고려한 입지..경로..재고문제의 내공생진화 알고리듬 해법)

  • Song, Seok-Hyun;Lee, Sang-Heon
    • Journal of Korean Institute of Industrial Engineers
    • /
    • v.37 no.1
    • /
    • pp.1-9
    • /
    • 2011
  • This paper presents a new method that can solve the integrated problem of combined location routing and inventory problem (CLRIP) efficiently. The CLRIP is used to establish facilities from several candidate depots, to find the optimal set of vehicle routes, and to determine the inventory policy in order to minimize the total system cost. We propose a mathematical model for the CLRIP with budget constrained. Because this model is a nonpolynomial (NP) problem, we propose a endosymbiotic evolutionary algorithm (EEA) which is a kind of symbiotic evolutionary algorithm (SEA). The heuristic method is used to obtaining the initial solutions for the EEA. The experimental results show that EEA perform very well compared to the existing heuristic methods with considering inventory control decisions.