Incentive/Disincentive (I/D) contract is designed for minimizing any disruption of traffic flow in road construction projects. I/D contracting projects have been evaluated with regard to time and cost performance in various states, more than 35 states. However, construction project managers and planners have little understanding of the project factors that affect the project time and cost performance of highway construction projects using I/D regulations. Therefore, the purpose of this research is to find factors that affect I/D project success or failure to improve the decision-making process for the implementation of I/D projects. In order to achieve the objectives of this research, the researchers collected I/D road construction project data from FDOT and performed evaluation for each collected project. Then, project data analysis to identify key factors that affect I/D project performance was performed. In conclusion, five significant factors for project time performance and six significant factors for project cost perfornace were identified and summarized.
A one-dimensional kinematic wave model was used to calculate temporal and spatial changes of the highway runoff. Infiltration into pavement was considered using Darcy's law, as a function of flow depth and pavement hydraulic conductivity ($K_p$). The model equation was calculated using the method of characteristics (MOC), which provided stable solutions for the model equation. 22 storm events monitored in a highway runoff monitoring site in west Los Angeles in the U.S. were used for the model calculation and evaluation. Using three different values of $K_p$ ($5{\times}10^{-6}$, $10^{-5}$, and $2{\times}10^{-5}cm/sec$), total runoff volume and peak flow rate were calculated and then compared with the measured data for each storm event. According to the calculation results, $10^{-5}cm/sec$ was considered a site representative value of $K_p$. The study suggested a one-dimensional method to predict hydrodynamic behavior of highway runoff, which is required for the water quality prediction.
Journal of Construction Engineering and Project Management
/
v.8
no.1
/
pp.1-9
/
2018
US transportation agencies are dealing with shrinking budgets, limited work forces, and deteriorating infrastructure. In order to cope with funding uncertainty, state highway agencies are now looking into their own organizations and identifying programs, practices, and processes that have potential for cost saving. A quality assurance (QA) program is an integral part of highway construction and ensures a project's contracted level of quality. The cost of quality (conforming and nonconforming) can constitute a sizable part of total construction cost. As the quality assurance programs evolved, various practices and processes were developed over time and later adopted by state highway agencies. These practices and processes include different QA standards and specifications, varying testing methods, central testing lab vs. on site testing, performance based vs. prescribed quality assurance practices, implementation of innovative quality assurance practices, etc. Therefore, there is an opportunity to assess different QA strategies and recommend those practices that are effective and cost efficient. A national survey was conducted by the authors, which provided a detailed mapping of various QA practices and processes used as part of QA programs and identified areas where agencies can focus on for cost savings. The survey found that QA sampling and testing plans, optimization of sampling plans, optimization of QA standards and specifications, and implementation of innovative test methods and processes are the main areas the agencies should focus to lean the current QA programs.
PURPOSES : This study is to develop a automate road mapping system using ARASEO(Automated Road Analysis and Safety Evaluation TOol) for road management. METHODS : The road survey van named ARASEO(Automated Road Analysis and Safety Evaluation TOol) was used to generate highway drawings for Korea National Road number 37 automatically. In order to generate the highway drawings for purpose of road management, it is required to acquired the information for highway alignment, road width and road facilities such as safety barrier and road sign. Therefore the survey van acquired and analyzed the road width, median and guardrail data using rear side laser sensor of ARASEO and recognized the traffic control sign and chevron sign using foreside camera images. Also the highway alignment which is the basic information for highway drawing can be analyzed by acquisition the every 1m positional and attitude data using GPU and IMU sensor and developed algorithm. Finally, in this research the CAD based drawing software was developed to draw highway drawing using the analysis result from ARASEO. RESULTS : This study showed the comparison result of the surveyed road width and drawing data. To make the drawing of the road, we made the Autocad ARX program witch run in CAD menu interface. CONCLUSIONS : Using this program we can create the road center line, every 500m horizontal and vertical ground plan drawing automatically.
Vegetation surveys were performed at 45 plots along 10 highways cut slopes in South Korea. Total floral inventory, species richness and exotic plant percentage were obtained within each plot. Life history and life form of each species appeared were analyzed. Community types were classified using hierarchical cluster analysis and detrended correspondence analysis and non-metric multidimensional scaling were conducted from vegetation matrix. 292 species of vascular plants were discovered and the number of natives and exotics were 226 and 66, respectively. There were no significant differences of species richness and exotic plant percentage between cut slopes and rest areas. Hierarchical cluster analysis indicated five clear vegetation associations in cut slopes and rest areas. Detrended correspondence analysis indicated that species composition of total and native plants were similar along the highway cut slopes whereas exotic plants were distributed differentially along the highway cut slopes. in non-metric multidimensional scaling, the studied sites were more separated from each other on the basis of their species composition than the results of detrended correspondence analysis with respect to total, native and exotic plants. The both ordination represented that exotic plants have not been made uniform yet on cut slopes and rest areas by highway corridor in spite of diverse chronosequences after highway construction termination (1 to 22 years). This study showed that the distribution of species composition in exotic plants was different and localized on cut slopes and rest areas of highway in this representative peninsula area of North East Asia and the invasion of exotic plants can retard the process of plant species homogenization.
Journal of the Economic Geographical Society of Korea
/
v.13
no.3
/
pp.312-334
/
2010
This paper examines the process of Gyeongbu Highway construction from the standpoint of political economy, which was pursued by President Park Jeong-Hee in the 1960s, focusing on the politics of mobility and demarcation implied in it. As results of examination, it can be argued that Gyeongbu Highway was seen as a powerful element to promote a socio-spatial integration of population and hence to enforce an authoritative political power of the Park regime through creation of mobility; that it has had an strong impact on changing the physical landscape of national space and the spatio-temporal rhythm of everyday life by extending the 'machine space' as a non-place; that it has provided a physical infrastructure on which the period of capital circulation could be reduced through its effect of space-time compression. But Gyeongbu Highway has led serious problems such as uneven regional development, expansion of non-place or alienated place, ecological destruction and pollution. In conclusion, a sustainable politics is suggested to overcome this kind of 'tragedy of highway' and to develop the highway as a true way of political and spatial balance and integration.
Journal of the Korean Society of Industry Convergence
/
v.25
no.6_3
/
pp.1183-1190
/
2022
Recently, the Ministry of Strategy and Finance announced a plan to reduce the proportion of economic evaluation in non-metropolitan areas and strengthen balanced development evaluation through the reorganization of the preliminary feasibility study system. In addition, the social value of the quality of life, such as job, environment, and safety, which may be affected by the implementation of transportation facility investment projects, was reflected as the main item of policy evaluation. In this study, the ripple effect of the project in terms of social value was reviewed for the Gangil-Chuncheon. The effect of highway opening was investigated by reviewing the feasibility report, post-evaluation report, and statistical indicators. Recently, the Gangil-Chuncheon highway is getting used by around 110,000 people per day. The number of tourists in Chuncheon rapidly has increased from 5 million a year to more than 11 million now. In addition, it was confirmed to produce effects such as population migration, net inflow and land price increase, improvement of living convenience, and expansion of emergency medical care. Although this ripple effect was influenced by various socio-economic factors as well as the opening of the highway, it is clear that it is difficult to occur without the opening of the highway. It is judged that the evaluation of indirect benefits and social values due to the opening of the highway can be quantified through continuous research and data construction. Post-evaluation of construction works, including project efficiency evaluation and ripple effect evaluation, is performed for construction works with a construction cost of more than 50 billion won. In the future, we will continuously improve the evaluation system in order to evaluate the indirect benefits and social values of public investment projects.
KSCE Journal of Civil and Environmental Engineering Research
/
v.29
no.3D
/
pp.347-356
/
2009
This paper is described clustering analysis of traffic characteristics-based highway classification in order to deviate from methodologies of existing highway functional classification. This research focuses on comparing the clustering techniques performance based on the total within-group errors and deriving the optimal number of cluster. This research analyzed statistical clustering method (Hierarchical Ward's minimum-variance method, Nonhierarchical K-means method) and Kohonen self-organizing maps clustering method for highway characteristic classification. The outcomes of cluster techniques compared for the number of samples and traffic characteristics from subsets derived by the optimal number of cluster. As a comprehensive result, the k-means method is superior result to other methods less than 12. For a cluster of more than 20, Kohonen self-organizing maps is the best result in the cluster method. The main contribution of this research is expected to use important the basic road attribution information that produced the highway characteristic classification.
KSCE Journal of Civil and Environmental Engineering Research
/
v.29
no.1D
/
pp.11-16
/
2009
The estimation of total travel time on highway link for a day or year is the most important process for the feasibility analysis of highway or railway. Most of current guidelines for feasibility studies have been based on the time-traffic volume relationship from the BPR, and the traffic volumes have been determined by the application of the design hour factor to the annual average daily traffic volume. Both of the BPR function and the application of the design hour volume may result in the over-estimation of travel time due to the fact that the traffic volume on the large portion of highway links in Korea are close to the capacities. This study proposed a new way which is based on the distribution of hourly volumes for a year. It could be closer to the real situation, and provide more reasonable estimation. This methodology was validated for the national highways, but may be applicable for any type of highway with the AADT.
In this paper, in order to study the relationship between the safety culture of highway management agencies and disaster reduction activities (BCMS), a measurement tool was identified through previous research on safety culture, and the validity of the measurement tool was confirmed through exploratory factor analysis. I want to check. The subjects of the study were workers belonging to disaster reduction activity management system certification organizations among highway management organizations. The highway management agencies are the Korea Expressway Corporation, which manages the functional continuity of national highways nationwide, and 8 of the 21 private road agencies that manage the functional continuity of the highways. The safety culture measurement tool is an indicator that measures safety culture factors, and is reorganized by the researcher based on survey items from previous studies, with management/manager safety values and attitudes, safety communication, safety education and training, and safety regulations/management system as subfactors. A total of 24 questions were comprised of the survey tool. As a result of the study, the result of exploratory factor analysis was that the safety culture scale was extracted into four factors based on theoretical grounds, and the total cumulative variance was 80.360%. When checking the questions for each factor, it was found that all the questions loaded on the factor that was originally intended to be measured. Factor 1 is management, factor 2 is safety, and factor 3 is communication., Factor 4 was named education. Number of questions: 4 management questions, 3 safety questions, communication It consisted of 4 questions and 2 education questions.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.