• Title/Summary/Keyword: National Public Procurement

Search Result 63, Processing Time 0.019 seconds

Analysis of Confusion of Azalea Cultivars and Its Actual State of Use in Landscaping Businesses (조경업체에서의 철쭉재배품종의 혼선 및 이용실태 분석)

  • Choi, Jae-Jin;Park, Seok-Gon
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.42 no.2
    • /
    • pp.86-90
    • /
    • 2014
  • This study was conducted to examine the state of confusion about those azalea cultivars(hereinafter, Azalea Cultivars) that are used among practicians in landscaping businesses(designers, constructors, and producers). Which Azalea Cultivars would be delivered when they were ordered to producers using the names of Azalea Cultivars notified by the Public Procurement Service. In addition, the situations of azalea cultivar planting designs in the planting design drawings of three apartments completed recently and whether the Azalea Cultivars on the design drawings were the same as those Azalea Cultivars that were actually planted were examined. When Azalea Cultivars were ordered using the notified names, three Azalea Cultivars; Beni, Three, and Daewang were delivered for the name Yeongsanhong and two Azalea Cultivars; Zasanhong and Hancheol were delivered for the name Zasanhong. Yeongsanhong was perceived as a common name of Beni, Three, and Daewang by producers. Therefore, this caused confusion between producers and purchasers. In the case of Zasanhong, as the traits of Zasanhong are similar to those of the cultivar Hancheol, the producers or purchasers might have been unable to clearly distinguish between the cultivars and thus two cultivars might have been delivered without being distinguished from each other. The names of Azalea Cultivars used in planting design drawings were the names notified by the notifying agencies or comprehensive and unclear names such as azalea and Yeongsanhong. Completely different Azalea Cultivars from those written in planting design drawings were planted in actual construction sites in many cases. These situations should have occurred because designers did not write accurate cultivar names in planting design drawings and constructors could not accurately perceive the classification characteristics of individual Azalea Cultivars but planted those Azalea Cultivars with similar flowers colors or those that could be easily bought to fit the conditions of construction sites.

A Basic Study on Effective Adjustment Method for Construction Escalation/De-Escalation Price (건설공사 중 물가변동에 따른 효율적인 계약금액 조정에 관한 기초 연구)

  • Sung, Ju-yong;Kim, Dong-jin;Lee, Min-jae
    • Korean Journal of Construction Engineering and Management
    • /
    • v.20 no.3
    • /
    • pp.3-11
    • /
    • 2019
  • The construction of a facility is an act whereby infrastructure such as roads and railways and other facilities such as housing and office spaces are constructed, and due to the characteristics of the relevant industry where such construction is carried out in a custom order method, it requires a long period of time mostly. While the construction is carried out over a long period of time, fluctuations in the price of raw materials required for the construction occur. Therefore, the cost of the construction also fluctuates inevitably. The fluctuation of the construction cost meshes closely with the profit of a constructor and the efficiency of government spending. Therefore, it is necessary to maintain the construction cost at a reasonable level by adjusting the construction cost rationally in order to secure the required construction quality and spend the budget efficiently. The buffer system for solving such problem is the contract amount adjustment system by fluctuations in prices (Escalation/De-Escalation). In this study, the method combining the escalation method based on the item adjustment method was suggested for an efficient contract amount adjustment method. In addition, it is proposed that there be an investigation and codification of matters not applied to government acts and regulations on contracts related to the adjustment of fluctuations in prices legally.

A Study of the Supply of Large Korean Pine Timber (국산 육송 특대재 수급 현황 분석 및 문화재 수리의 활용에 관한 연구)

  • Jung, Younghun;Yun, Hyundo
    • Korean Journal of Heritage: History & Science
    • /
    • v.53 no.4
    • /
    • pp.136-149
    • /
    • 2020
  • It is generally believed that Douglas Fir timber imported from North America is used in repair work for Korean wooden heritage sites due to an insufficient supply of extra-large sized Korean pine timber. Based on this understanding in the cultural heritage repair field, Cultural Heritage Repair Business Entities ("CHRBE") prefer North American Douglas Fir timber which is more easily acquired on the market than large Korean pine timber. However, if CHRBE use large quantities of foreign-origin wood in the heritage repair field, this presents the threat of negative domestic impacts on cultural heritage such as breaching the preservation principal and ultimately weakening material authenticity. Therefore, this study aims to investigate the current supply status of large Korean pine timber through examination of existing research, interviews with experts engaged in CHRBE, and timber mills. With this information, the authors seek to identify whether the market supply of large Korean pine timber is indeed insufficient or not. In addition to this, this paper identifies the reasons why large Korean pine timber is not widely used if such timber supply is actually sufficient. In order to propose suggestions regarding the issues above, the authors study the distribution channel for large Korean pine timber and the price spectrum of this timber through examination of price information from the public agencies under the Korea Forest Service, research papers from the Cultural Heritage Administration, and estimation documents from timber mills. This paper also identifies two main opinions about why Korean timber has not been commonly used in the Korean heritage repair field. The first opinion is that the supply of large Korean pine timber really is insufficient in Korea. However, the second opinion is that it is hardly used due to inappropriateness of the government's procurement and estimation system, despite the fact that the supply of the timbers on the market is actually sufficient. Through the aforementioned research, this paper comes to the conclusion that the second opinion has strong grounds in many aspects. In terms of suggestions, alternative routes are proposed to stimulate the use of large Korean pine timber via supply by the 'Korea Foundation for Traditional Architecture and Technology' and surveys of the price spectrum of the timber, etc.