• Title/Summary/Keyword: National Highway

Search Result 715, Processing Time 0.025 seconds

Factors That Affect Project Time and Cost Performance during Highway Construction Using Incentive/Disincentive Provisions

  • Pyeon, Jae-Ho;Park, Moonseo;Jung, Sangsun;Park, Taeho
    • Land and Housing Review
    • /
    • v.11 no.4
    • /
    • pp.115-124
    • /
    • 2020
  • Incentive/Disincentive (I/D) contract is designed for minimizing any disruption of traffic flow in road construction projects. I/D contracting projects have been evaluated with regard to time and cost performance in various states, more than 35 states. However, construction project managers and planners have little understanding of the project factors that affect the project time and cost performance of highway construction projects using I/D regulations. Therefore, the purpose of this research is to find factors that affect I/D project success or failure to improve the decision-making process for the implementation of I/D projects. In order to achieve the objectives of this research, the researchers collected I/D road construction project data from FDOT and performed evaluation for each collected project. Then, project data analysis to identify key factors that affect I/D project performance was performed. In conclusion, five significant factors for project time performance and six significant factors for project cost perfornace were identified and summarized.

Predicting Dynamic Behaviors of Highway Runoff using A One-dimensional Kinematic Wave Model (일차원 kinematic wave 모형을 이용한 고속도로 강우 유출수의 동적 거동 예측)

  • Kang, Joo-Hyon;Kim, Lee-Hyung
    • Journal of Korean Society on Water Environment
    • /
    • v.23 no.1
    • /
    • pp.38-45
    • /
    • 2007
  • A one-dimensional kinematic wave model was used to calculate temporal and spatial changes of the highway runoff. Infiltration into pavement was considered using Darcy's law, as a function of flow depth and pavement hydraulic conductivity ($K_p$). The model equation was calculated using the method of characteristics (MOC), which provided stable solutions for the model equation. 22 storm events monitored in a highway runoff monitoring site in west Los Angeles in the U.S. were used for the model calculation and evaluation. Using three different values of $K_p$ ($5{\times}10^{-6}$, $10^{-5}$, and $2{\times}10^{-5}cm/sec$), total runoff volume and peak flow rate were calculated and then compared with the measured data for each storm event. According to the calculation results, $10^{-5}cm/sec$ was considered a site representative value of $K_p$. The study suggested a one-dimensional method to predict hydrodynamic behavior of highway runoff, which is required for the water quality prediction.

Sources of Cost Saving Opportunities in Highway Construction Quality Assurance Practices

  • Uddin, Mohammad Moin;Newland, James
    • Journal of Construction Engineering and Project Management
    • /
    • v.8 no.1
    • /
    • pp.1-9
    • /
    • 2018
  • US transportation agencies are dealing with shrinking budgets, limited work forces, and deteriorating infrastructure. In order to cope with funding uncertainty, state highway agencies are now looking into their own organizations and identifying programs, practices, and processes that have potential for cost saving. A quality assurance (QA) program is an integral part of highway construction and ensures a project's contracted level of quality. The cost of quality (conforming and nonconforming) can constitute a sizable part of total construction cost. As the quality assurance programs evolved, various practices and processes were developed over time and later adopted by state highway agencies. These practices and processes include different QA standards and specifications, varying testing methods, central testing lab vs. on site testing, performance based vs. prescribed quality assurance practices, implementation of innovative quality assurance practices, etc. Therefore, there is an opportunity to assess different QA strategies and recommend those practices that are effective and cost efficient. A national survey was conducted by the authors, which provided a detailed mapping of various QA practices and processes used as part of QA programs and identified areas where agencies can focus on for cost savings. The survey found that QA sampling and testing plans, optimization of sampling plans, optimization of QA standards and specifications, and implementation of innovative test methods and processes are the main areas the agencies should focus to lean the current QA programs.

The Study on an Automated Generation Method of Road Drawings using Road Survey Vehicle (도로교통안전점검차량을 이용한 도로의 자동도면화 생성 연구)

  • Lee, Jun Seok;Yun, Duk Geun;Park, Jae Hong
    • International Journal of Highway Engineering
    • /
    • v.16 no.5
    • /
    • pp.91-98
    • /
    • 2014
  • PURPOSES : This study is to develop a automate road mapping system using ARASEO(Automated Road Analysis and Safety Evaluation TOol) for road management. METHODS : The road survey van named ARASEO(Automated Road Analysis and Safety Evaluation TOol) was used to generate highway drawings for Korea National Road number 37 automatically. In order to generate the highway drawings for purpose of road management, it is required to acquired the information for highway alignment, road width and road facilities such as safety barrier and road sign. Therefore the survey van acquired and analyzed the road width, median and guardrail data using rear side laser sensor of ARASEO and recognized the traffic control sign and chevron sign using foreside camera images. Also the highway alignment which is the basic information for highway drawing can be analyzed by acquisition the every 1m positional and attitude data using GPU and IMU sensor and developed algorithm. Finally, in this research the CAD based drawing software was developed to draw highway drawing using the analysis result from ARASEO. RESULTS : This study showed the comparison result of the surveyed road width and drawing data. To make the drawing of the road, we made the Autocad ARX program witch run in CAD menu interface. CONCLUSIONS : Using this program we can create the road center line, every 500m horizontal and vertical ground plan drawing automatically.

Distribution and Characteristics of Native and Exotic Plants on Cut Slopes and Rest Areas along Korean Highway Lines

  • Kim, Kee-Dae
    • Journal of Environmental Science International
    • /
    • v.16 no.5
    • /
    • pp.549-559
    • /
    • 2007
  • Vegetation surveys were performed at 45 plots along 10 highways cut slopes in South Korea. Total floral inventory, species richness and exotic plant percentage were obtained within each plot. Life history and life form of each species appeared were analyzed. Community types were classified using hierarchical cluster analysis and detrended correspondence analysis and non-metric multidimensional scaling were conducted from vegetation matrix. 292 species of vascular plants were discovered and the number of natives and exotics were 226 and 66, respectively. There were no significant differences of species richness and exotic plant percentage between cut slopes and rest areas. Hierarchical cluster analysis indicated five clear vegetation associations in cut slopes and rest areas. Detrended correspondence analysis indicated that species composition of total and native plants were similar along the highway cut slopes whereas exotic plants were distributed differentially along the highway cut slopes. in non-metric multidimensional scaling, the studied sites were more separated from each other on the basis of their species composition than the results of detrended correspondence analysis with respect to total, native and exotic plants. The both ordination represented that exotic plants have not been made uniform yet on cut slopes and rest areas by highway corridor in spite of diverse chronosequences after highway construction termination (1 to 22 years). This study showed that the distribution of species composition in exotic plants was different and localized on cut slopes and rest areas of highway in this representative peninsula area of North East Asia and the invasion of exotic plants can retard the process of plant species homogenization.

Gyeongbu Highway: Political Economic Geography of Mobility and Demarcation (경부고속도로: 이동성과 구획화의 정치경제지리)

  • Choi, Byung-Doo
    • Journal of the Economic Geographical Society of Korea
    • /
    • v.13 no.3
    • /
    • pp.312-334
    • /
    • 2010
  • This paper examines the process of Gyeongbu Highway construction from the standpoint of political economy, which was pursued by President Park Jeong-Hee in the 1960s, focusing on the politics of mobility and demarcation implied in it. As results of examination, it can be argued that Gyeongbu Highway was seen as a powerful element to promote a socio-spatial integration of population and hence to enforce an authoritative political power of the Park regime through creation of mobility; that it has had an strong impact on changing the physical landscape of national space and the spatio-temporal rhythm of everyday life by extending the 'machine space' as a non-place; that it has provided a physical infrastructure on which the period of capital circulation could be reduced through its effect of space-time compression. But Gyeongbu Highway has led serious problems such as uneven regional development, expansion of non-place or alienated place, ecological destruction and pollution. In conclusion, a sustainable politics is suggested to overcome this kind of 'tragedy of highway' and to develop the highway as a true way of political and spatial balance and integration.

  • PDF

Impact of Highway Construction on the Regional Economy: Gangil-Chuncheon Highway (고속도로 건설이 지역경제에 미치는 기여도 분석연구: 강일~춘천 고속도로)

  • Na, Sung-Yong;Lee, Du-Heon;Kim, Hyun-Woo
    • Journal of the Korean Society of Industry Convergence
    • /
    • v.25 no.6_3
    • /
    • pp.1183-1190
    • /
    • 2022
  • Recently, the Ministry of Strategy and Finance announced a plan to reduce the proportion of economic evaluation in non-metropolitan areas and strengthen balanced development evaluation through the reorganization of the preliminary feasibility study system. In addition, the social value of the quality of life, such as job, environment, and safety, which may be affected by the implementation of transportation facility investment projects, was reflected as the main item of policy evaluation. In this study, the ripple effect of the project in terms of social value was reviewed for the Gangil-Chuncheon. The effect of highway opening was investigated by reviewing the feasibility report, post-evaluation report, and statistical indicators. Recently, the Gangil-Chuncheon highway is getting used by around 110,000 people per day. The number of tourists in Chuncheon rapidly has increased from 5 million a year to more than 11 million now. In addition, it was confirmed to produce effects such as population migration, net inflow and land price increase, improvement of living convenience, and expansion of emergency medical care. Although this ripple effect was influenced by various socio-economic factors as well as the opening of the highway, it is clear that it is difficult to occur without the opening of the highway. It is judged that the evaluation of indirect benefits and social values due to the opening of the highway can be quantified through continuous research and data construction. Post-evaluation of construction works, including project efficiency evaluation and ripple effect evaluation, is performed for construction works with a construction cost of more than 50 billion won. In the future, we will continuously improve the evaluation system in order to evaluate the indirect benefits and social values of public investment projects.

A Comparative Study on Statistical Clustering Methods and Kohonen Self-Organizing Maps for Highway Characteristic Classification of National Highway (일반국도 도로특성분류를 위한 통계적 군집분석과 Kohonen Self-Organizing Maps의 비교연구)

  • Cho, Jun Han;Kim, Seong Ho
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.29 no.3D
    • /
    • pp.347-356
    • /
    • 2009
  • This paper is described clustering analysis of traffic characteristics-based highway classification in order to deviate from methodologies of existing highway functional classification. This research focuses on comparing the clustering techniques performance based on the total within-group errors and deriving the optimal number of cluster. This research analyzed statistical clustering method (Hierarchical Ward's minimum-variance method, Nonhierarchical K-means method) and Kohonen self-organizing maps clustering method for highway characteristic classification. The outcomes of cluster techniques compared for the number of samples and traffic characteristics from subsets derived by the optimal number of cluster. As a comprehensive result, the k-means method is superior result to other methods less than 12. For a cluster of more than 20, Kohonen self-organizing maps is the best result in the cluster method. The main contribution of this research is expected to use important the basic road attribution information that produced the highway characteristic classification.

Estimation of Total Travel Time for a Year on National Highway Link with AADT (연평균 일일교통량을 이용한 일반국도구간 연간 총통행시간 추정 방법 개발)

  • Kim, Jeong Hyun;Suh, Sunduck;Kim, Taehee
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.29 no.1D
    • /
    • pp.11-16
    • /
    • 2009
  • The estimation of total travel time on highway link for a day or year is the most important process for the feasibility analysis of highway or railway. Most of current guidelines for feasibility studies have been based on the time-traffic volume relationship from the BPR, and the traffic volumes have been determined by the application of the design hour factor to the annual average daily traffic volume. Both of the BPR function and the application of the design hour volume may result in the over-estimation of travel time due to the fact that the traffic volume on the large portion of highway links in Korea are close to the capacities. This study proposed a new way which is based on the distribution of hourly volumes for a year. It could be closer to the real situation, and provide more reasonable estimation. This methodology was validated for the national highways, but may be applicable for any type of highway with the AADT.

Exploratory Factor Analysis Study on the Safety Culture of Highway Management Agencies (고속도로 관리기관의 안전문화에 대한 탐색적 요인분석 연구)

  • Jeong-Soo Seo;Kyung-Ok Jeong
    • Journal of the Korea Safety Management & Science
    • /
    • v.26 no.1
    • /
    • pp.55-61
    • /
    • 2024
  • In this paper, in order to study the relationship between the safety culture of highway management agencies and disaster reduction activities (BCMS), a measurement tool was identified through previous research on safety culture, and the validity of the measurement tool was confirmed through exploratory factor analysis. I want to check. The subjects of the study were workers belonging to disaster reduction activity management system certification organizations among highway management organizations. The highway management agencies are the Korea Expressway Corporation, which manages the functional continuity of national highways nationwide, and 8 of the 21 private road agencies that manage the functional continuity of the highways. The safety culture measurement tool is an indicator that measures safety culture factors, and is reorganized by the researcher based on survey items from previous studies, with management/manager safety values and attitudes, safety communication, safety education and training, and safety regulations/management system as subfactors. A total of 24 questions were comprised of the survey tool. As a result of the study, the result of exploratory factor analysis was that the safety culture scale was extracted into four factors based on theoretical grounds, and the total cumulative variance was 80.360%. When checking the questions for each factor, it was found that all the questions loaded on the factor that was originally intended to be measured. Factor 1 is management, factor 2 is safety, and factor 3 is communication., Factor 4 was named education. Number of questions: 4 management questions, 3 safety questions, communication It consisted of 4 questions and 2 education questions.