• Title/Summary/Keyword: Nakdong watershed

Search Result 207, Processing Time 0.024 seconds

A Study on Estimation of the Delivery Ratio by Flow Duration in a Small-Scale Test Bed for Managing TMDL in Nakdong River (낙동강수계 수질오염총량관리를 위한 시범소유역 유황별 유달율 산정방법 연구)

  • Shon, Tae-Seok;Park, Jae-Bum;Shin, Hyun-Suk
    • Journal of Korean Society on Water Environment
    • /
    • v.25 no.5
    • /
    • pp.792-802
    • /
    • 2009
  • The objective of this study is to construct the watershed management system with link of the non-point sources model and to estimate delivery ratio duration curves for various pollutants. For the total water pollution load management system, non-point source model should be performed with the study of the characteristic about non-point sources and loadings of non-point source and the allotment of pollutant in each area. In this study, daily flow rates and delivered pollutant loads of Nakdong river basin are simulated with modified TANK model and minimum variance unbiased estimator and SWAT model. Based on the simulation results, flow duration curves, load duration curves, and delivery ratio duration curves have been established. Then GIS analysis is performed to obtain several hydrological geomorphic characteristics such as watershed area, stream length, watershed slope and runoff curve number. As a result, the SWAT simulation results show good agreements in terms of discharge, BOD, TN, TP but for more exact simulation should be kept studying about variables and parameters which are needed for simulation. And as a result of the characteristic discharges, pollutants loading with the runoff and delivery ratios, non-point sources effects were higher than point sources effects in the small-scale test bed of Nakdong river basin.

Regional estimation of baseflow index in Korea and analysis of baseflow effects according to urbanization (국내 하천 기저유출지표 산정 및 도시화에 따른 기저유출 영향 분석)

  • Kang, Hyeongsik;Hyun, Yun-Jung;Jun, Sang-Mook
    • Journal of Korea Water Resources Association
    • /
    • v.52 no.2
    • /
    • pp.97-105
    • /
    • 2019
  • In this study, the baseflow indices in Nakdong river watershed and the whole country's river were calculated by using SWAT model and PART method. The annual averaged baseflow in the Nakdong river watershed was estimated at 40% - 44% of the total discharge rate, and it is found to be higher than 90% during the winter months of December and January. An analysis of the baseflow index from 317 gauge stations across the country revealed that the contribution of baseflow to the nation's stream flow rate stood at an annual average of 40%, ranging from less than 20% to over 80% by region. Also, the impact of the decreasing baseflow due to land use changes in 1975 and 2000 was analyzed in Keumhogang river watershed under the same weather conditions. The results revealed that the number of days under the standard instream flow increased by 19-24 days as a result of the increase in the urbanization rate.

Evaluation of Water Quality Characteristics in the Nakdong River using Statistical Analysis (통계분석을 이용한 낙동강유역의 수질변화 특성 조사)

  • Choi, Kil Yong;Im, Toe Hyo;Lee, Jae Woon;Cheon, Se Uk
    • Journal of Korea Water Resources Association
    • /
    • v.45 no.11
    • /
    • pp.1157-1168
    • /
    • 2012
  • In this study, we assess changes in water quality trends over time based on certain control measurements in order to identify and analyze the cause of the trend in water quality. The current water pollution in the Nakdong River was analyzed, as it suggests that the significant changes in water quality have occurred in between 2006 and 2010. Based on monthly average data, we have examined for trends of the Nakdong River watershed in water temperature, Biological Oxygen Demand (BOD), Chemical Oxygen Demand (COD), Total Nitrogen (TN), and Total Phosphorus (TP). Moreover, we have investigated seasonal variation of water quality of sites within the Nakdong River Basin by implementing further analyses such as, Correlation Coefficient, Regression Analysis, Hierarchical Clustering Method, and Time Series Analysis on SPSS. Geology and topography of the watershed, controlled by various conditions such as, climate, vegetation, topography, soil, and rain medium, have been affected by the non-homogeneity. Our study suggests that such variables could possibly cause eutrophication problems in the river. One possible way to overcome this particular problem is to lay up a ship on the river by increasing the nasal flow measurement of the Nakdong River during rainy season. Moreover, the water management requires arranging the measurement of the flow in order to secure the river while the numerous construction projects need to be continuously observed. However, the water is not flowing tributary of the reason for the timing to be flowing in a natural state of river water and industrial water intake because agriculture. Therefore, ongoing research is needed in addition to configuration of all observations.

Flow Rate·Water Quality Characteristics of Tributaries and a Grouping Method for Tributary Management in Nakdong River (낙동강 지류·지천의 유량·수질 특성 및 하천관리를 위한 등급화 방안 연구)

  • Na, Seungmin;Lim, Tae Hyen;Lee, Jae Yun;Kwon, Heongak;Cheon, Se Uk
    • Journal of Wetlands Research
    • /
    • v.17 no.4
    • /
    • pp.380-390
    • /
    • 2015
  • In this study, the major 38 tributaries in Nakdong River were monitored for flow rate and water quality in order to understand the characteristics of the watershed and to find improvement plan. The flow rate and water quality for each target tributary were evaluated based on the monitoring data in 2013~2014 using a statistical package SPSS-22.0. In addition, the tributary grouping method was conducted using a $BOD_5$ concentration/flowrate and TP concentration/flowrate monitoring data. The average values of $BOD_5$, $COD_{Mn}$, TP and TOC concentrations in Gumicheon, Gyeonghocheon, Jincheoncheon, Gisegokcheon, Yonghacheon and Yonghocheon located at Nakdong Waegwan and Nakdong Goryung watershed were high and in the grade of III or IV (5~8 mg/L). The Pearson correlation coefficients of TOC with $BOD_5$, $COD_{Mn}$, and TP were greater (r=0.8, p<0.01) than those of the other water quality parameters (12 species). The tributaries with high values of water quality parameters ($BOD_5$ > 3.0 mg/L, TP > 0.1 mg/L) and flowrate (Q > $0.1m^3/sec$) were selected for improving water quality according to the stream grouping method. Five tributaries (Gumicheon, Gisegokcheon, Yonghacheon, Yeongsancheon, Mijeoncheon and Yonghocheon) were classified as Group I, which require polices and plans for water quality improvement.

Impact of Climate Change on Runoff Analysis in the Geum River Basin (금강 유역에서의 기후변화에 대한 유출 영향 분석)

  • Ahn, Jung-Min;Jung, Kang-Young;Kim, Gyeonghoon;Kwon, Heongak;Yang, Duk-Seok;Shin, Dongseok
    • Journal of Environmental Science International
    • /
    • v.26 no.5
    • /
    • pp.549-561
    • /
    • 2017
  • Recently IPCC (International Panel on Climate Change, 2007) pointed out that global warming is a certain ongoing process on the earth, due to which water resources management is becoming one of the most difficult tasks with the frequent occurrences of extreme floods and droughts. In this study we made runoff predictions for several control points in the Geum River by using the watershed runoff model, SSARR (Streamflow Synthesis and Reservoir Regulation Model), with daily RCP 4.5 and RCP 8.5 scenarios for 100 year from 1st Jan 2006 to 31st Dec 2100 at the resolution of 1 km given by Climate Change Information Center. As a result of, the Geum River Basin is predicted to be a constant flow increases, and it showed a variation in the water circulation system. Thus, it was found that the different seasonality occurred.

Analysis of Microtoxins in the Nakdong River Watershed

  • Park, Jung-Min;Lee, Jae-Jung;Hwang, Dong-Jin;Yang, Sang-Yong
    • Proceedings of the Korean Environmental Sciences Society Conference
    • /
    • 2003.11a
    • /
    • pp.99-102
    • /
    • 2003
  • The different methods such as HPLC, indirect- and direct-ELISA were employed for the analysis of microtoxins and the results of each method were compared in terms of the detection limit and accurary. Three toxins, microcystin-RR, -LR and -YR were clearly separated by HPLC using 0.05 M methanol and phosphate buffer used as a solvent system. The calibration curves for the toxins were linear in the range of 5 ng to 50 ng. The standard curves for the immunoassay of microcystin obtained by direct and indirect ELISA are compared. The linear responses of inhibitions of binding by microcystin in the direct and indirect competitive ELISA were in the range of 10 ng to 1000 ng and 50 pg to 160 pg, respectively. Distribution of microtoxins at 11 sites in the Nakdong river and several lakes in Korea was also studied. The most dominant microcystin variant in the test sites was found to be microcystin-RR.

  • PDF

Integration of Total Pollution Load Management System and Environmental Impact Assessment related System (수계 오염총량관리제와 환경영향평가제도의 통합운영방안)

  • Lee, Jong-Ho
    • Journal of Environmental Impact Assessment
    • /
    • v.12 no.5
    • /
    • pp.359-367
    • /
    • 2003
  • The total pollution load management system of watershed has been implemented upon Special Law pertaining to the Han River Watershed Water Quality Improvement and Residents Support, Special Law pertaining to the Nakdong River Watershed Water Management and Residents Support, Special Law pertaining to the Youngsan River Watershed Water Management and Residents Support, and Special Law pertaining to the Seomjin River Watershed Water Management and Residents Support in Korea since 2002. But many other similar systems with total pollution load management system of watershed are being operated separately or independently, even though its purpose is nearly same with those of the total maximum pollutants load management in Law on Water Quality Environmental Protection, environmental impact assessment(EIA) in Law of Impact Assessment on Environment, Transportation and Disaster and Pre-environmental assessment of Environmental Policy Act. Therefore the contents of total pollution load management system of watershed and many other related systems could be overlapped and at some times have inconsistency among them. This study suggests first the integrated operation of total pollution load management system of watershed, EIA, pre-environmental assessment, urban planning, and sewage planning and secondly EIA system development by integration of EIA and pre-environmental assessment and strategic environmental assessment(SEA).

Impact of Urbanization on Hydrology of Geumho River Watershed: A Model Study (금호강 유역의 수문환경에 대한 도시화의 영향: 모형 연구)

  • Kim, Jae-Chul;Lee, Jiho;Yoo, Chulsang;Kim, Sangdan
    • Journal of Korean Society on Water Environment
    • /
    • v.23 no.4
    • /
    • pp.535-542
    • /
    • 2007
  • The Geumho river watershed located in the middle of the Nakdong river has been threatened by high population growth and urbanization. Of concern specifically is the potential impact of future developments in the watershed on the reduction of base flow and the consequent risk of degradation of ecological habitats in Geumho river. Anticipated increase in imperviousness, on the other hand, is expected to elevate flood risk and the associated environmental damage. A watershed hydrology based modeling study is initiated in this study to assist in planning for sustainable future development in the Geumho river watershed. The Soil and Water Assessment Tool (SWAT) is selected to model the impact of urbanization in the Geumho river watershed on the hydrologic response thereof. The modeling results show that in general the likelihood that the watershed will experience high and low stream flows will increase in view of the urbanization so far achieved.

Development and Performance Assessment of the Nakdong River Real-Time Runoff Analysis System Using Distributed Model and Cloud Service (분포형 모형과 클라우드 서비스를 이용한 낙동강 실시간 유출해석시스템 개발 및 성능평가)

  • KIM, Gil-Ho;CHOI, Yun-Seok;WON, Young-Jin;KIM, Kyung-Tak
    • Journal of the Korean Association of Geographic Information Studies
    • /
    • v.20 no.3
    • /
    • pp.12-26
    • /
    • 2017
  • The objective of this study was to develop a runoff analysis system of the Nakdong River watershed using the GRM (Grid-based Rainfall-runoff Model), a physically-based distributed rainfall-runoff model, and to assess the system run time performance according to Microsoft Azure VM (Virtual Machine) settings. Nakdong River watershed was divided into 20 sub-watersheds, and GRM model was constructed for each subwatershed. Runoff analysis of each watershed was calculated in separated CPU process that maintained the upstream and downstream topology. MoLIT (Ministry of Land, Infrastructure and Transport) real-time radar rainfall and dam discharge data were applied to the analysis. Runoff analysis system was run in Azure environment, and simulation results were displayed through web page. Based on this study, the Nakdong River real-time runoff analysis system, which consisted of a real-time data server, calculation node (Azure), and user PC, could be developed. The system performance was more dependent on the CPU than RAM. Disk I/O and calculation bottlenecks could be resolved by distributing disk I/O and calculation processes, respectively, and simulation runtime could thereby be decreased. The study results could be referenced to construct a large watershed runoff analysis system using a distributed model with high resolution spatial and hydrological data.

The Distribution Characteristics of Grain Size and Organic Matters of Surface Sediments from the Nakdong-Goryeong Mid-watershed (낙동·고령 중권역의 표층 퇴적물 입도 조성 및 유기물질 분포 특성 변화)

  • Kim, Shin;Ahn, Jungmin;Kim, Hyounggeun;Kwon, Heongak;Kim, Gyeonghoon;Shin, Dongseok;Yang, Deukseok
    • Journal of Environmental Science International
    • /
    • v.27 no.6
    • /
    • pp.411-423
    • /
    • 2018
  • To investigate the distribution characteristics of grain size and organic matter of surface sediments from the Nakdong-Goryeong Mid-watershed, surface sediments were collected and analyzed. The samples were collected from six sited at four different times between May 2013 and May 2014. The were analyzed for grain size, water content, ignition loss, chemical oxygen demand, total organic carbon and total nitrogen. The surface sediments were mainly composed of medium sand (mean 44.7%) and coarse sand (mean 32.8%) and became coarser in May 2014. Fine sediments at the site NG-2 were poorly sorted and positively skewed, and occur in a tributary environment that is relatively low-energy compared with the other sites. The water content at the studied sites (15.3 ~ 34.9%) averaged 20.25%, and ignition loss (0.4 ~ 5.8%) and total nitrogen (274 ~ 2493 mg/kg) averaged 1.33% and, 696 mg/kg, respectively. These values indicated that the sediments were not seriously contaminated when compared with the sediment pollution evaluation standard of the National Institute of Environmental Research. The chemical oxygen demand (mean 0.17%) was at the non-polluted level compared with United States Environmental Protection Agency sediment quality standards. The total organic carbon (mean 0.18%) at all sites except site NG-2 (lowest effect level) was the no effect level of the Ontario sediment quality guidelines. The COD/IL (0.02 ~ 0.20) and C/N (0.73 ~ 6.76) were less than 1 and 10, respectively. Organic matter in the study area produced naturally from aquatic organisms. Results of principal component analysis showed that fine sediments (very fine sand and silt) were significantly affected by organic matters (ignition loss, chemical oxygen demand, total organic carbon and total nitrogen). In addition, the highest organic matters content in the study area occurred at the site with the finest sediments (NG-2).