A Study on Monte Carlo Simulation in Resin of New Austria Tunnel Method by admixture for Shrinkage Compensating Concrete (무수축 콘크리트 혼화제를 활용한 New Austria Tunnel Method 수지에서 Monte Carlo 시뮬레이션에 관한 연구)

  • Kim, Ki-Jun;Sung, Wan-Mo;Kim, Joo-Han;Jung, Hyung-Hak
    • Journal of the Korean Applied Science and Technology
    • /
    • v.34 no.1
    • /
    • pp.125-131
    • /
    • 2017
  • The influences of scatterer and absorber in turbid material by light scattering in concrete admixture were interpreted for the scattered intensity and wavelength. The molecular properties have been studied by Monte Carlo simulation in resin of New Austria Tunnel Method. It has been found that the effects of optical properties in scattering media could be investigated by the optical parameters(${\mu}_s$, ${\mu}_a$,${\mu}_t$). Monte Carlo Simulation method for modelling of light transport in the civil engineering and construction field was applied. The results using a phantom were discussed that the admixture for shrinkage compensating concrete in NATM-rasin from source to detector is measured, and scattering intensity is stronger with those obtained through Monte Carlo Simulation. It may also aid in designing the best model for coatings and corrosion for the durability of metal constructions.

Numerical simulation for surface settlement considering face vibration of TBM tunnelling in mixed-face condition (복합지반에서 TBM 굴진 진동을 고려한 지표침하에 대한 수치모델링)

  • Kwak, Chang-Won;Park, Inn-Joon
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.17 no.3
    • /
    • pp.333-339
    • /
    • 2015
  • In this paper, the surface settlement resulted from the shallow TBM tunnelling has been numerically simulated. TBM tunnelling is especially used in urban area to avoid serious vibration and noise caused by explosion in NATM. Surface settlement is one of the most important problems encountered in all tunnelling and critical in urban areas. In this study, face vibration of TBM excavation is considered to estimate surface settlement trend according to TBM extrusion. The dynamic excavation forces are calculated by total torque on the TBM cutterhead in mixed-face of soil and weathered rock condition with shallow depth. A 3-dimensional FDM code is employed to simulate TBM tunnelling and mechanical-dynamic coupling analysis is performed. The 3D numerical analysis results showed that dynamic settlement histories and trend of surface settlement successfully. The maximum settlement occurred at the excavation point located at 2.5D behind the face, and the effect of face vibration on the surface settlement was verified in this study.

Solving Non-deterministic Problem of Ontology Reasoning and Identifying Causes of Inconsistent Ontology using Negated Assumption-based Truth Maintenance System (NATMS를 이용한 온톨로지 추론의 non-deterministic 문제 해결 및 일관성 오류 탐지 기법)

  • Kim, Je-Min;Park, Young-Tack
    • Journal of KIISE:Software and Applications
    • /
    • v.36 no.5
    • /
    • pp.401-410
    • /
    • 2009
  • In order to derive hidden information (concept subsumption, concept satisfiability and realization) of OWL ontology, a number of OWL reasoners have been introduced. The most of these ontology reasoners were implemented using the tableau algorithm. However most reasoners simply report this information without providing a justification for any arbitrary entailment and unsatisfiable concept derived from OWL ontologies. The purpose of this paper is to investigate an optimized method for non-deterministic rule of the tableau algorithm and finding axioms to cause inconsistency in ontology. In this paper, therefore, we propose an optimized method for non-deterministic rule and finding axiom to cause inconsistency using NATMS. In the first place, we introduce Dependency Directed Backtracking to deal non-deterministic rule, a tableau-based decision procedure to find unsatisfiable axiom Furthermore we propose an improved method adapting NATMS.

Effect of Spatial Distribution of Geotechnical Parameters on Tunnel Deformation (지반 물성치의 공간적 분포에 따른 터널 변위 특성 분석)

  • Song, Ki-Il;Cho, Gye-Chun
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.8 no.3
    • /
    • pp.249-257
    • /
    • 2006
  • The spatial distribution of design parameters greatly affects tunnel behavior during and after construction, as well as in the long-term temporal responses. However, the tunnel design parameters commonly used in numerical modeling tend to be representative or average values of global-scale properties. Furthermore, the uncertainty and spatial variation of the design parameters increase as the tunnel scale increases. Consequently, the probability of failure also increases. In order to achieve structural stability in large-section tunnels, the design framework must take into consideration the quantitative effect of design parameter variations on tunnel behavior. Therefore, this paper suggests a statistical approach to numerical modeling to explore the effect of spatially distributed design parameters in a circular tunnel. Also, the effect of spatial variation in the lining strength is studied in this paper. The numerical results suggest that the deformation around the tunnel increases with an increase in the variation of the design parameters.

A manual for the revised TBM tunnel specification (개정 TBM 터널 표준시방서 해설 연구)

  • Sagong, Myung;Jung, Chi Kwang;Moon, Joon Bai;Kim, Jeayoung;Yun, Do Sik;Yu, Myeong Han
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.17 no.4
    • /
    • pp.415-428
    • /
    • 2015
  • With increase of the extension of long tunnels and urban tunnelling, demands on the new tunnelling technologies are raised. Currently, drilling and blasting tunnel construction method is mostly used, however, because of sever blast vibration for some occasions, complaints from local residents and rock damages are inevitable. Accordingly, TBM tunnelling is more efficient and effective for such conditions. Nevertheless, tunnel construction costs of TBM cannot compete that of the drill and blasting method in Korea. To overcome such limitations, various TBM equipments and construction technologies are required. In addition, continuous revision of the design standard and specification are required. In this study, a detailed explanation regarding the revised version of TBM section in the tunnel standard specification at 2015 is shown.

Development of high performance shotcrete for permanent shotcrete tunnel linings (Application of high-early strength cement with alkali-free accelerator in spring water condition) (영구 숏크리트 터널 라이닝 구축을 위한 고성능 숏크리트 개발 (용수부에서의 조강시멘트와 alkali-free급결제 적용 검토))

  • Park, Hae Geun;Lee, Myeong Sub;Kim, Jea Kwon
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.5 no.1
    • /
    • pp.23-31
    • /
    • 2003
  • Since the mid of 1990, permanent shotcrete tunnel linings such as Single-shell and NMT have been constructed in many countries for reducing the construction time and lowing construction costs instead of conventional in-situ concrete linings. Among essential technologies for successful application of permanent shotcrete linings, high performance shotcrete having high strength, high durability and better pumpability has to be developed in advance as an integral component. This paper presents the idea and first experimental attempts to increase early strength and bond strength of wet-mixed Steel Fiber Reinforced Shotcrete (SFRS) in spring water condition. In order to increase early behavior of SFRS, a new approach using high-early strength cement with alkali-free liquid accelerator has been investigated. From the test results, wet-mix SFRS with high-early strength cement and alkali-free accelerator exhibited excellent early compressive strength improvement compared to the ordinary portland cement and good bond strength even under spring water condition.

  • PDF

Analysis of Tunnel Lining Behavior under Tunnel Load (이완하중을 받는 터널라이닝의 거동분석)

  • Park, Jung-Jin;Kim, Do-Hyun;Jeong, Sang-Seom
    • Journal of the Korean Geotechnical Society
    • /
    • v.28 no.8
    • /
    • pp.79-88
    • /
    • 2012
  • In this study, the tunnel loads acting on the concrete lining are analyzed by comparing three methods - Terzaghi table, Terzaghi formula and Ground-Lining Interaction (G.L.I) model. The tunnel loads are analyzed by FLAC 2D. And the G.L.I model is analyzed under various rock mass ratings, tunnel depths (20~80m) and in-situ stress ratios ($K_0$=0.5~2.0). Terzaghi's method can be applied only to weathered rocks and soils, and cannot reflect the effect of various tunnel depths and in-situ stress ratio. The proposed G.L.I model can not only be applied to various ground conditions, but also relieves the tunnel loads by up to 30%.

Suggestion of a Design Method for UAM (강관 다단 그라우팅 공법(UAM)의 설계법 제안)

  • 박이근;임종철
    • Journal of the Korean Geotechnical Society
    • /
    • v.20 no.3
    • /
    • pp.97-106
    • /
    • 2004
  • In case of tunnel construction with a shallow soil cover in cohesionless soils or highly weathered rocks, reinforcement measures are required for a tunnel stability during the tunnel construction. Recent developments show that the use of Umbrella Arch Method(UAM) as tunnel reinforcement and water cut-off in domestic projects has increased. Unfortunately, guidelines for the design and construction of UAM have not been established, only empirical designs and applications in tunnel construction have been performed so far. In this study, behaviour of the steel pipes installed on the tunnel roof was analyzed through the monitoring of bending and axial stresses of the pipes with the advance of the tunnel face. The monitoring results were used in the establishment of the loading mechanism around the pipe. This paper suggests, the guidelines used in the determination of the total length, overlapping length and lateral spacing of the reinforcing pipes obtained from the established loading mechanism.

Non-deformable support system application at tunnel-34 of Ankara-Istanbul high speed railway project

  • Aksoy, C.O.;Uyar, G.G.;Posluk, E.;Ogul, K.;Topal, I.;Kucuk, K.
    • Structural Engineering and Mechanics
    • /
    • v.58 no.5
    • /
    • pp.869-886
    • /
    • 2016
  • Non-Deformable Support System (NDSS) is one of the support system analysis methods. It is likely seen as numerical analysis. Obviously, numerical modeling is the key tool for this system but not unique. Although the name of the system makes you feel that there is no deformation on the support system, it is not true. The system contains some deformation but in certain tolerance determined by the numerical analyses. The important question is what is the deformation tolerance? Zero deformation in the excavation environment is not the case, actually. However, deformation occurred after supporting is important. This deformation amount will determine the performance of the applied support. NDSS is a stronghold analysis method applied in full to make this work. While doing this, NDSS uses the properties of rock mass and material, various rock mass failure criteria, various material models, different excavation geometries, like other methods. The thing that differ NDSS method from the others is that NDSS makes analysis using the time dependent deformation properties of rock mass and engineering judgement. During the evaluation process, NDSS gives the permission of questioning the field observations, measurements and timedependent support performance. These transactions are carried out with 3-dimensional numeric modeling analysis. The goal of NDSS is to design a support system which does not allow greater deformation of the support system than that calculated by numerical modeling. In this paper, NDSS applied to the problems of Tunnel 34 of the same Project (excavated with NATM method, has a length of 2218 meters), which is driven in graphite schist, was illustrated. Results of the system analysis and insitu measurements successfully coincide with each other.

Blasting Standardization works for NATM on the Seoul Subway Construction by Dr, Ginn Huh (서울 지하철공사 발파공법의 표준화)

  • Heo, Jin
    • Journal of the Korean Professional Engineers Association
    • /
    • v.16 no.3
    • /
    • pp.5-23
    • /
    • 1983
  • On the Seoul Metropolitan Subway Construction of No. 3, 4 Line, the total length is 57 Km and it is now undergoing almost 55% progress. The working method is classified into Open Cut of 70% and the rest of 30% tunnelling method in the 48 job site. Above tunnelling method is execute by American Steel Support System and the rest of 10 job site carried out by New Austria Tunnelling Method. This paper describes Blasting Standardizations works on the above Tunnelling ' Open Cut Method under big slogan, first safety, second execution. As a superintendent, I strived standardization of works with Better powder, Better Drills ' Better Pattern. Geological structure of Seoul area is composed by Jurassic Granite and also the above rockgroup are over burden by Alluviums as a Unconformity. First of all, I carried out the standard amount of powder and burden through experimental standard blasting by each powder as following Blasting works in the subway construction is surrounding shop Building, under pass the city river and also under pass highest building basement floor. I made allowable Blasting Vibration Value by West-Germany Vornorm DIN 4150, Teil 3 and should measure each blasting works as fellows all of powder is used basically Low-Gravity and Low Velocity such as Slurry, Ammonium Nitrate ' Finex I, II. for Smooth Blasting Instead of Gelatin Dynamite. Electric Detonation Cap is used basically M/S Delay Cup instead of Electric delay ' Simultaneous cap. I applied following formula V=KW3/4 $D^{-2}$ V=Particle Velocity (Cm/sec) K=Ginh Huh's Value W=Delay Charge (Kg) D=Distance(m) In the Open Cut, within 1m distance from H-pile I made to use the Concrete breaker, as following V=7W/$^{0.5}$V/$^{-1.75}$ On the Concentrate Building area, I advise to use Light class drill ø36m Bit and advance 1.1m per round blasting the three boom jumbo drill over ø45mm used only suburb of city.e Light class drill ø36m Bit and advance 1.1m per round blasting the three boom jumbo drill over ø45mm used only suburb of city.

  • PDF