• Title/Summary/Keyword: N.P removal

Search Result 1,008, Processing Time 0.022 seconds

Optimum Conditions for the Removal of External Organic Carbon Sources in a Submerged Denitrification Biofilter (탈질 여과조에서 외부 탄소원 제거를 위한 적정 체류 시간과 외부 탄소원 종류 및 질산염 농도에 대한 외부 탄소원의 적정 비율)

  • 오승용;조재윤;윤길하
    • Journal of Aquaculture
    • /
    • v.12 no.1
    • /
    • pp.47-56
    • /
    • 1999
  • Denitrification by anaerobic bacteria is one of the most common processes of removing nitrate from recirculating aquaculture systems. This process is affected by many factors such as external carbon sources, hydraulic retention time (HRT), and $COD/NO_3-N$ ratio. Although external organic carbon sources are essential for the denitrification process, these also contribute to increase dissolved organic carbon concentration in recirculating aquaculture systems. So these external organic carbons must be removed from the systems. This study was conducted to find out the optimum operating conditions for the removal of external organic carbons in a submerged denitrification biofilter. Combinations of two external carbon sources (glucose and methanol), two HRT (4- and 8-hour), and four different C:N ratios (3, 4, 5, and 6) were used in this experiment. The removal efficiencies of organic carbon sources at 8-hour HRT were always better than those at 4-hour's (P<0.05). Maximum removal efficiencies were achieved when C:N ratio was 5 in both glucose and methanol. The removal efficiencies of methanol were always better than those of glucose. The maximum removal efficiencies of glucose and methanol were 76.5% and 84.0%, respectively and the removal rates were 223.5 $g/m^2/day$ and 247.1$g/m^2/day$. The maximum removal rates of glucose (290.9 $g/m^2/day$) and methanol (355.6 $g/m^2/day$) were achieved at 4-hour HRT and 5 C:N ratio. But the concentrations of SCOD in the effluent of both glucose ($52.5 mg/\ell$) and methanol ($40.9 mg/\ell$) were too high for rearing fish. Therefore, the optimum operating conditions for the removal of external carbon in a submerged denitrification biofilter were 8-hour HRT and 5 C:N ratio. And methanol showed better efficiency as an external carbon sources.

  • PDF

Water Treatment Characteristics by Const ucted Wetland with Different Vegetation - Open Water Arrangements (식생습지와 개방수역의 배열에 따른 인공습지의 수처리 특성)

  • Jang, Jeong-Ryeol;Choi, Sun-Hwa;Kwun, Soon-Kuk
    • Journal of Korean Society on Water Environment
    • /
    • v.23 no.1
    • /
    • pp.122-130
    • /
    • 2007
  • This study was conducted to evaluate water treatment characteristics according to vegetated wetland(V) and open water(O) arrangements in free water surface constructed wetland. Three pilot-scale wetlands, V-V, O-V and V-O, were built and operated. $BOD_5$ was a slightly reduced at all the arrangements because the influent concentration was so low as background concentration of constructed wetlands. While T-N and T-P removal efficiency showed higher than 50% for all cases. The O-V arrangement showed the highest removal efficiency: 20% for $BOD_5$, 56% for SS, 59% for T-N and 72% for T-P. Effluent concentration of the O-V were significantly low compared with those from the V-O. O-V arrangement would be beneficial in the light of pollutant removal efficiency as well as construction cost.

A Study on the Energy Efficiency for NO Removal by Pulsed Corona Discharge (펄스 코로나 방전을 이용한 NO제거 에너지 효율에 대한 연구)

  • Kang, Hun;Song, Bong-Shik;Lee, Seok-Hyun;Doh, Hyun-Ho;Kim, Youn-Teag
    • Proceedings of the KIEE Conference
    • /
    • 1999.07e
    • /
    • pp.2010-2012
    • /
    • 1999
  • The product of electrons by Pulsed Corona Discharge leads to produce radicals which work on NO, and NO is finally removed. Energy efficiency for NO removal was improved with increasing peak voltage rather than with increasing pulse frequency. The rate of energy transfer increased with decreasing value of $C_p$( Pulse - Forming Capacitance 2.15, 1.06, 0.55, 0.36, 0.1[nF]. When the value of $C_p$ reached to 0.36 [nF], the energy efficiency for NO removal was maximized. And good agreement was obtained between chemical kinetic calculations and the experimental results.

  • PDF

Anaerobic-aerobic granular system for high-strength wastewater treatment in lagoons

  • Hamza, Rania A.;Iorhemen, Oliver T.;Tay, Joo H.
    • Advances in environmental research
    • /
    • v.5 no.3
    • /
    • pp.169-178
    • /
    • 2016
  • This study aimed at determining the treatability of high-strength wastewater (chemical oxygen demand, COD>4000 mg/L) using combined anaerobic-aerobic granular sludge in lagoon systems. The lagoon systems were simulated in laboratory-scale aerated and non-aerated batch processes inoculated with dried granular microorganisms at a dose of 0.4 g/L. In the anaerobic batch, a removal efficiency of 25% was not attained until the 12th day. It took 14 days of aerobic operation to achieve sCOD removal efficiency of 94% at COD:N:P of 100:4:1. The best removal efficiency of sCOD (96%) was achieved in the sequential anaerobic-aerobic batch of 12 days and 2 days, respectively at COD:N:P ratio of 200:4:1. Sequential anaerobic-aerobic treatment can achieve efficient and cost effective treatment for high-strength wastewater in lagoon systems.

Effect of Sulfide Removal on Sulfate Reduction at pH 5 in a Hydrogen Fed Gas-Lift Bioreactor

  • Bijmans, Martijn F.M.;Dopson, Mark;Ennin, Frederick;Lens, Piet N.L.;Buisman, Cees J.N.
    • Journal of Microbiology and Biotechnology
    • /
    • v.18 no.11
    • /
    • pp.1809-1818
    • /
    • 2008
  • Biotechnological treatment of sulfate- and metal-ions-containing acidic wastewaters from mining and metallurgical activities utilizes sulfate-reducing bacteria to produce sulfide that can subsequently precipitate metal ions. Reducing sulfate at a low pH has several advantages above neutrophilic sulfate reduction. This study describes the effect of sulfide removal on the reactor performance and microbial community in a high-rate sulfidogenic gas-lift bioreactor fed with hydrogen at a controlled internal pH of 5. Under sulfide removal conditions, 99% of the sulfate was converted at a hydraulic retention time of 24 h, reaching a volumetric activity as high as 51 mmol sulfate/l/d. Under nonsulfide removal conditions, <25% of the sulfate was converted at a hydraulic retention time of 24 h reaching volumetric activities of <13 mmol sulfate/l/d. The absence of sulfide removal at a hydraulic retention time of 24 h resulted in an average $H_2S$ concentration of 18.2 mM (584 mg S/I). The incomplete sulfate removal was probably due to sulfide inhibition. Molecular phylogenetic analysis identified 11 separate 16S rRNA bands under sulfide stripping conditions, whereas under nonsulfide removal conditions only 4 separate 16S rRNA bands were found. This shows that a less diverse population was found in the presence of a high sulfide concentration.

Changes in Pollutant Concentrations by Artificial Floating Island Installed in Reservoir for Irrigation (농업용 저수지에 설치한 인공식물섬에 의한 오염물질 농도의 변화)

  • Yang, Hongmo
    • Journal of the Korean Society of Environmental Restoration Technology
    • /
    • v.9 no.2
    • /
    • pp.23-32
    • /
    • 2006
  • Total suspended solids (TSS), five-day biochemical oxygen demand ($BOD_5$), total nitrogen (T-N), and total phosphorous (T-P) concentrations around and under a floating island were examined from October 2002 to September 2003. The island was installed in July 2002 on the surface of an agricultural irrigation reservoir located in the southern part of the Korean Peninsula. It was composed of six polyethylene panels. Each panel was 2 m (length) ${\times}$ 1 m (width) ${\times}$ 0.02 m (thick) and had about thirty-two holes each with a diameter of eight centimeters, through which plant roots grew down into the water. Coconut fibers of nine-centimeters in height were placed on the panel, which sustained plants rhizomes and roots. Both the fibers and the panel were raped with polyethylene wire mashes. About thirty irises (Iris pseudoacorus) were planted into the fibers of each panel. The concentrations of TSS, $BOD_5$, T-N and T-P below the island during the iris-growing season averaged 9.70, 2.59, 3.61 and 0.14 mg/L, respectively and those around it averaged 9.99, 2.83, 4.07 and 0.16 mg/L, respectively. The average concentrations of TSS, $BOD_5$, T-N and T-P below it during the iris non-growing season were 8.68, 2.37, 3.25 and 0.14 mg/L, respectively and those near it were 8.76, 2.43, 3.34 and 0.15 mg/L, respectively. At a significance level of ${\alpha}$=0.05, $BOD_5$, T-N and T-P concentrations under the island during the iris-growing season were significantly low when compared with those around it except TSS. No differences in TSS, $BOD_5$, T-N and T-P concentrations between around and near it were found at a significance level of ${\alpha}$=0.05 during the iris non-growing season. The removal of $BOD_5$, T-N, and T-P during the growing season were significantly high when compared with those during the non-growing season. TSS abatement of the floating island was very low during both the growing and non-growing seasons. The island's reductions of $BOD_5$, T-N and T-P were good during the growing season, especially T-N and T-P, which have been considered as primary pollutant sources causing the water quality degradation of reservoirs. The removal of T-N and T-P was primarily attributed to the absorption of nitrogen and phosphorous by the irises during the growing season.

A Study on the Application of Pre-Chemical Treatment on the Decentralized Domestic Wastewater Reclamation System (도시의 분산형 생활오수 재생시스템에 화학적 전처리공정도입에 관한 연구)

  • Lee, Sang-Woo;Park, Young-Mi;Seo, Gyu-Tae
    • Journal of Korean Society of Water and Wastewater
    • /
    • v.20 no.1
    • /
    • pp.115-121
    • /
    • 2006
  • The purpose of this study was to investigate applicability of pretreatment on the existing biological treatment for domestic wastewater reclamation. From Jar Tests, it was found that optimum dosage of coagulant was PAC 0.5mg/L and $FeCl_3$ 180mg/L for urban sewage. In this study, PAC 0.5mg/L was selected considering sludge production and the amount of coagulant required. In a continuous experiment performed with combining chemical coagulation and biological treatment, a considerable removal efficency was obtained in term of BOD, SS, T-N, T-P and ABS. When the raw sewage was supplied into the pre-chamical treatment facility, the removal of BOD and SS was 48.3% and 81.1%. However T-N removal was very low which means T-N consists of $NH_3-N$ mostly. T-P was almost completely recluced by the chemical addition. The effluent BOD & SS was 57~76 and 21~43mg/L, which could reduce the size of biological treatment facility. From the cost estimation pre-chemical treatment could save around half of the area required for biological treatment with post ceagulation.

Effect of Temperature on Removals of Organic Matter, Nitrogen and Phosphorus in MLE and M-Dephanox Processes (온도가 MLE 및 M-Dephanox 공정의 유기물, 질소 및 인 제거 효율에 미치는 영향)

  • Ryu, Hong-Duck;Lee, Sang-Ill
    • Journal of Korean Society on Water Environment
    • /
    • v.22 no.1
    • /
    • pp.7-16
    • /
    • 2006
  • The present study evaluated effect of temperature on removals of organic matter (C), nitrogen (N) and phosphorus (P) in Modified-Dephanox (M-Dephanox) process, which is hybrid system, comparing with those of Modified-Ludzack Ettinger (MLE) under the suspended-growth bacteria, as control. M-Dephanox process was more stable than MLE process in the removal of C, N, P, especially in nitrification, as the temperature was decreased from $25^{\circ}C$ to $16^{\circ}C$. As the temperature was decreased from $25^{\circ}C$ to $16^{\circ}C$, the removal efficiency of $NH_4{^+}-N$ of M-Dephanox process was decreased by 3.8%, but that of MLE process decreased by 25.7%. T-N removal efficiency of M-Dephanox was higher than MLE process by 27.1% and 26.9% at $25^{\circ}C$ and $16^{\circ}C$ of temperature, respectively.

Nitrate Removal by $FeCl_3$-Treated Activated Carbon (염화철 처리 활성탄에 의한 질산염 제거)

  • 정경훈;최형일;정오진
    • Journal of Environmental Health Sciences
    • /
    • v.27 no.1
    • /
    • pp.63-68
    • /
    • 2001
  • A laboratory experiment was performed to invstigate the nitrate removal using FeCl$_3$ -treated activated carbon. Iron chloride(III) was coated onto the surface of activated carbon. The removal efficiency of nitrate was increased with increasing of FeCl$_3$ was used for coating material. About 22~26mg of Fe per unit g of activated carbon was adsorbed. The nitrate removal was not affected by the pH under the experiment range of pH, but the pH value in solution decrease to 3.5~4.0 after reaction. The removal efficiency of nitrate was increased with increasing of dosage of adsorbents. Ammonia was not detected and the Fe concentration as low as 0.22mg/$\ell$ was desorbed from the adsorbents. The adsorbents was regenerated using KCl solution, and recovery was 76.6% at 1 M of KCl. The adsorption of nitrate by FeCl$_3$-treated activated carbon followed the Freundlich isotherm equation and the Freundlich constant, 1/n, was 0.346. These results showed that the FeCl$_3$-treated activated carbon could serve as the basis of a useful nitrate removal.

  • PDF

A study on the Simultaneous Removal of Nitrogen and Phosphorus on Reactor Configuration in Intermittently Aerated Activated Sludge System (간헐폭기 활성슬러지 시스템에서 반응조 형태에 따른 질소 및 인의 동시제거 특성에 관한 연구)

  • Lee, Won-Ho;Seo, In-Seok;Kim, Kwang-Yul
    • Journal of Korean Society of Water and Wastewater
    • /
    • v.12 no.2
    • /
    • pp.106-114
    • /
    • 1998
  • In this research, single-, two- and four-stage intermittently aerated activated sludge system were investigated for simultaneous removal of nitrogen and phosphorus with swine wastewater. For the comparison of removal efficiency, conventional activated sludge system was operated. Operational conditions of intermittently aerated activated sludge system were SRT 20day, HRT 24hr and aeration/nonaeration time 1hr/1hr, respectively. Nitrogen and phosphorus removal efficiency in Intermittently aerated activated sludge system was upgraded compare with conventional activated sludge system. In single-stage intermittently aerated activated sludge system, release-uptake of $PO_4^{3-}-P$ was observed very well but, phosphosrus removal in effluent was not effective. In single-stage intermittently aerated activated sludge system, release-uptake of $PO_4^{3-}-P$ in first reactor, was observed very well but, in following reactor, $PO_4^{3-}-P$ concentation showed almost no change. T-N removal efficiency in conventional activated sludge system, single-, two-, and four-stage intermittently aerated activated sludge system were 48, 87, 90.9 and 95.5%, respectively, and phosphorus removal efficiency were 48, 75, 97 and 95%, respectively. Intermittently aerated activated sludge system as a alternative processes of conventional system leads to meet satisfactory effleunt with only on/off aeration regulation and save energy for aeration.

  • PDF