• Title/Summary/Keyword: Multipurpose dams

Search Result 47, Processing Time 0.023 seconds

Estimation of Available Permit Water for Considering the Evaporation of Multipurpose Dams in Nakdong River Basin (증발량을 고려한 낙동강유역 다목적댐의 가용허가수량 추정)

  • Kim, Sun Joo;Park, Ki Chun;Park, Hee Seong
    • Journal of The Korean Society of Agricultural Engineers
    • /
    • v.55 no.3
    • /
    • pp.1-7
    • /
    • 2013
  • The dam plan quantity of constructive and water supply quantity of present time are showing a difference with change in climate and augmentation of water demand for multipurpose dams in Nakdong river basin. But revaluates a water supply ability the method or the process is official for is not taking a position, so actual condition applies the plan quantity of dam constructive. Considers various situation of actual multipurpose dam from research sees consequently and in K-WEAP is an integrated water resources evaluation plan model applies as water permit availability multipurpose dam, currently water permit availability comparison, analyzed. In this study, the natural daily flow data and apply the dimensions of the reservoir, and for more than 30 years of the long-term water balance analysis conducted by Date Nakdong river basin can supply reservoirs are large quantity of permits available is presented.

A Study on Drainage Capability of Large Capacity Outlet and Spillway of Dams in Korea (한국댐의 대용량 배수시설 및 Spillway 배수능력에 관한 조사연구)

  • 이원환
    • Water for future
    • /
    • v.11 no.2
    • /
    • pp.43-53
    • /
    • 1978
  • Synopsis: This study has systemized the results of construction and classification with 656 large dams in Korea which were defined in ICOLD provision. Especially, checking up the drainage capability of large capacity outlets and its of spillway, this paper suggests the planning of outflow discharge with large capacity outlets and spillway in future. The results of this study are following as; 1. The classification by purposes in Korea shows that irrigation dams are 94% in rate(607 dams), jydropower and multipurpose dams are 2% (14 dams), municipal and industrial water supply dams are 4% (26 dams). 2. In design of proposed outflow discharge, spillways of irrigation dams were selected outflow discharge on 100 years return period, those of municipal and industrial water supply dmas 200 years and those of hydropower and multipurpose dams 500 years or 1000 years. 3. Emergency spillway should be considered in the fields of disaster prevention engineering and the rank of return periods for the emergency proposed out flow discharge was suggested. 4. Some of problems are suggested for this subject in future.

  • PDF

Comparative Analysis on Seasonal Water Quality Factors in Multipurpose Dams and Agricultural Reservoirs (농업용저수지와 다목적댐의 계절별 수질인자의 특성 비교분석)

  • Kim, Eungseok;Sim, Kuybum;Kim, Taeseung;Jeong, Donghwan;Yoon, Johee;Kang, Dookee;Kim, Sangdan
    • Journal of Korean Society on Water Environment
    • /
    • v.28 no.1
    • /
    • pp.102-108
    • /
    • 2012
  • This study has performed comparative analysis on characteristics of reservoirs in their use through correlation analysis on seasonal variation of water quality factors in agricultural reservoirs and multipurpose dams. Agricultural reservoirs show the high relationship between Chl-a and other water quality factors while the correlation among COD, BOD, and SS is strong in multipurpose dams. Agricultural reservoirs have the high relationship between various water quality factors in season such as Chl-a and pH ($R^{2}=0.294$) in Spring, pH and water temperature ($R^{2}=0.246$) in Summer, and Chl-a and BOD ($R^{2}=0.435$) in Fall, and between COD and BOD ($R^{2}=0.370$) in Winter, respectively, for Sapgyo reservoir while Chl-a and T-P ($R^{2}=0.739$) in Spring, T-P and SS ($R^{2}=0.876$) in Summer, and Chl-a and SS ($R^{2}=0.600$) in Fall, and between COD and SS ($R^{2}=0.998$) in Winter, respectively, for Seokmun reservoir. Boryeong dam has the strong relationship between T-P and SS ($R^{2}=0.511$) in Spring while the relation between COD and SS is high in other seasons with the values of $R^{2}$ of 0.362, 0.665, and 0.500 in Summer, Fall, and winter, respectively. The first and second water quality factors in relationship are COD and BOD in Sapgyo and Seokmun reservoirs, which is similar to the characteristics in Winter for multipurpose dams. Chl-a has no relationship with other water quality factors in Boryeong dam in operation for both flood control and low water regulation purposes. The result of this research is expected to provide contributions to the seasonal water quality control and analysis on characteristics for each reservoir by monitoring.

Water Supply Performance Assessment of Multipurpose Dams Using Sustainability Index (지속가능성지수를 이용한 다목적댐의 용수공급 이행도 평가)

  • Lee, Gwang-Man
    • Journal of Korea Water Resources Association
    • /
    • v.47 no.5
    • /
    • pp.411-420
    • /
    • 2014
  • The water resources sustainability is becoming an important issue in consideration of hydrologic uncertainty by global warming and climate change. This study is to assess the water supply performance for the major multipurpose dams using sustainability index. Parameters, mostly utilized in water resources system assessment, are selected in respect of applicability and flexibility, and those parameters are used as a variable of the composite index. In practice, the composite index including reliability, resiliency, vulnerability and maximum deficit are applied to 15 multipurpose dams and 4 major basins. And to conclude, Daechungdam in the Geum river basin and Imhadam, Hapchondam and Namgangdam in the Nakdong river basin show low sustainability comparing with other dams. The Nakdong river basin needs to develop alternatives to improve water supply stability because it indicates the most poor sustainability level.

Application of the cooperative two-person nonzero-sum game for water resources development in the Tumen river basin (두만강 유역의 합리적인 수자원 개발방안 도출을 위한 2인 비영합 협력게임 적용)

  • Park, Wan-Soo;Lee, Sang-Eun;Park, Hee-Kyung
    • Journal of Korean Society of Water and Wastewater
    • /
    • v.24 no.1
    • /
    • pp.63-72
    • /
    • 2010
  • This study aims to make a decision about the rational option for a multipurpose dams development of the Tumen river basin so that the adjoining countries will effectively deal with the chronic problems and fully satisfy the fast growing demand of water and power. It has been thus far investigated that the interests between North Korea and China closely depend on the selected option, and they are not well compatible with each other. These situations are defined in terms of the cooperative two-person nonzero-sum game. The Nash bargaining model is then applied to contemplate the rational option, considering two scenarios of economic growth of the North Korea. After analyzing the model, it was expected that 1) two multipurpose dams must be cooperatively developed, and 2) their benefits should be allocated according to demand of each country. The authors finally suggest that a cooperative organisation be established to effectively manage the dams beyond the border of the countries.

EVALUATION OF THE WATER RESOURCES ASPECT OF THE OPERATING RESULTS OF THE DAECHEONG MULTIPURPOSE DAM

  • Noh, Jaek-young
    • Water Engineering Research
    • /
    • v.5 no.1
    • /
    • pp.17-36
    • /
    • 2004
  • This paper evaluated the water resources aspect of the operating results of the Daecheong Multipurpose Dam for the last 21 years. The elements that were evaluated included the amount of water supply from the dam. volume of outflow from the regulating dam, changes in the runoff volume at the dam site and downstream, and variations in the water supply capacity of the Daecheong Multipurpose Dam and the Geum River Barrage Dam situated in the estuary. The rainfall-runoff model was used to evaluate the changes in the runoff volume, and the water balance analysis system was used to evaluate the variations in the dams'water supply capacities. The volume of domestic and industrial water supply from the Daecheong Multipurpose Dam increased to 6.1 times for the last 21 years from 61${\times}$$10^6$$m^3$ in 1981 to 375${\times}$$10^6$$m^3$in 2001. The rate of outflow to inflow of the Daecheong Dam was analyzed 1.30 times in dry season, 1.12 times in semi-dry season, and 0.90 times in rainy season. The volume of inflow to the Geum River Barrage Dam down- stream after the dam's construction increased to 1.25 times in dry season and 1.02 times in semi-dry season and decreased to 0.94 times in rainy season. The water supply capacity of the estuary barrage dam almost did not change in cases with or without the Daecheong Multipurpose Dam, but storages were largely affected by the outflows of the Daecheong Multipurpose Dam.

  • PDF

Strategy of Flood Control Capacity Enhancement on Existing Multipurpose Dams to the Effect of Climate Change (기후변화에 따른 기존 다목적댐의 홍수대응 능력 향상 방안)

  • Kim, U-Gu;Yu, Tae-Sang
    • Journal of the Korean Professional Engineers Association
    • /
    • v.44 no.2
    • /
    • pp.23-28
    • /
    • 2011
  • The assumption that the spatiotemporal distribution of rainfall has stationarity for a long period is not realistic due to frequent unusual weather phenomena. Based on the understanding of the situation, this paper investigates the effects of it to hydraulic structures especially dams and deals measures for it.

  • PDF

A Hydrological Analysis on the Gate Operation Rule of Dams in Han River Basin (한강유역(漢江流域) 댐군(群)의 수문조작방안(水門操作方案)에 관한 수문(水文) 해석(解析))

  • Lee, Won Hwan;Cho, Won Cheol;Lee, Jae Joon;Heo, Jun Haeng
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.5 no.1
    • /
    • pp.91-100
    • /
    • 1985
  • This study is on the gate operation of dams, which are for the hydropower and multipurpose in Han River Basin, considering the safety under the emergency. The results of the study on the safety of dams in Han River Basin associated with the gate operation of dams against the design flood flow and the combined inflow are as follows; 1) The empirical formula (1) can be used for gate operation with the informations of reservoir's water level and the inflow. 2) The applicability of the multiple regression formula (2) among the gate opening area, inflow, water level, and outflow is assured. 3) From the safety analysis of dams for the emergency by the procedures developed in this study, six dams are safe except Soyanggang, Euiam, and Cheongpyung Dam, but the above three dams can be safe with the lowering of the starting water level of gate opening by the pre-discharges.

  • PDF

A study on the irrigation water pumping system of multipurpose dams by the large water ejector (대형 수이젝터를 이용한 다목적댐 관개용수 펌핑시스템에 관한 연구)

  • 윤석훈;오철;손근홍;김철환
    • Journal of Advanced Marine Engineering and Technology
    • /
    • v.18 no.1
    • /
    • pp.73-80
    • /
    • 1994
  • The water ejector is a low pressure high flow rate volumetric pump. It utilize the energy of a low mass flow, high velocity stream to induce a large mass flow, low velocity stream. In addition, it has a very good resistances to cavitation compared to the other type of pumps, and the maintenance cost is practically nil. There has been enormous energy loss to supply the upper part water of dam which has large potential energy as mere irrigation water in domestic multipurpose dam. The new type of energy saving system which developed through the present study can economizes over 950,000 kWh per year by mixing the upper part water of dam with the waste water by the large water ejector. This paper estimates the economical efficiency of the new type of irrigation water pumping system, and further more, represents the change of performance characteristics of large water ejector, which was adapted to this system, according to the fluctuation of upper water level that seasonally changes.

  • PDF

Water Quality Assessment for pre and post-Impoundment of 6 Multipurpose Dam Reservoirs in Korea (국내 6개 다목적댐 저수지의 담수 전·후 수질 비교평가)

  • Park, Jae-Chung;Shin, Jae-Ki;Song, Young-Il;Jeong, Yong-Moon;Song, Sang-Jin
    • Journal of Environmental Impact Assessment
    • /
    • v.20 no.1
    • /
    • pp.89-96
    • /
    • 2011
  • This study was carried out to assess the variations of water quality caused by the dam construction on the river. Six dams-Yongdam, Miryang, Hoengseong, Boryeong, Jangheung and Buan- constructed recently in Korea were selected for the study. Chemical oxygen demand(COD) was increased in the initial stage of water storage at dams compared to the lotic(river) environment, but after 3 years it was maintained lower and stabilized concentrations. Five dams except for Jangheung Dam were maintained Ia~Ib grade conditions under the water quality criteria of Korea. The concentrations of total nitrogen(T-N) were decreased under the lentic(reservoir) environment compared to the river status. Total phosphorus(T-P) was decreased 13~63% at the reservoir condition. We concluded that increase of COD concentration was due to the debris organic materials of the land, but temporary phenomenon. T-N and T-P concentrations were decreased at the lentic condition compared to the lotic.