A PROACTIVE APPROACH FOR RESOURCE CONSTRAINED SCHEDULING OF MULTIPLE PROJECTS

  • Balasubramanian Kanagasabapathi;Kuppusamy Ananthanarayanan
    • 국제학술발표논문집
    • /
    • The 1th International Conference on Construction Engineering and Project Management
    • /
    • pp.744-747
    • /
    • 2005
  • The AEC (Architecture/Engineering/Construction) industry is facing a competitive world after it entered into the 21st century. Due to improper planning and scheduling, the construction projects face severe delays in completion. Most of the present day construction organisations operate in multiple project environments where more than one projects are to be managed simultaneously. But the advantages of planning and scheduling as multiple projects have not been utilized by these organisations. Change in multi-project planning and scheduling is inevitable and often frequent, therefore the traditional planning and scheduling approaches are no more feasible in scheduling multiple construction projects. The traditional scheduling tools like CPM and PERT do not offer any help in scheduling in a resource-constrained environment. This necessitated a detailed study to model the environment realistically and to make the allocation of limited resources flexible and efficient. This paper delineates about the proactive model which will help the project managers for scheduling the multiple construction projects.

  • PDF

The Methods of Value Management to Support Decision-Making of Urban Regeneration Projects

  • Kang, Hyun-Koo;Yu, Jung-Ho;Kim, Chang-Duk;Son, Bo-Sik
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.1503-1508
    • /
    • 2009
  • The paradigm of urban generation does not lie in physical development/maintenance such as urban redevelopment any more. The paradigm is shifting to balanced activation of administration / management functions including central commerce/business functions, broad culture/tourism functions, international functions and adequate level of residence functions. The urban regeneration project aims to restore functions of cities by physical/environmental, living/cultural and industrial/economical regeneration and is managed differently from existing projects in that it includes multiple sub-projects in it. The overall projects management should be by managing the value sought by the urban regeneration project and multiple other sub-projects. The objective of this study is to present various methods of value management in order to avoid conflicts between various objectives within the said project. It aims to provide the value management methods for decision making by understanding correlatedness between values of various projects and prioritizing them.

  • PDF

A SCHEDULING TECHNIQUE FOR MULTIPLE RESOURCE ALLOCATION TO MULTIPLE PROJECTS IN CONSTRUCTION

  • K Ananthanarayanan;Murali Jagannathan
    • 국제학술발표논문집
    • /
    • The 4th International Conference on Construction Engineering and Project Management Organized by the University of New South Wales
    • /
    • pp.201-208
    • /
    • 2011
  • Today's highly competitive construction scenario forces all the major players in the field to take up multiple projects which have put an undue pressure on the resources available within the organization. Under such a situation, there are many instances where in the resource requirement exceeds its availability due to multiple activities (with same resource requirement) which are scheduled to start simultaneously and thus results in the constrained resource becoming a bottleneck of the project. As a consequence of sharing resources, this paper studies the impact on the completion date of two similar projects under two different conditions, the first one resulting in a postponed end date and the second without any postponement. The resource utilization, the possibility of substitution of a resource and its subsequent impact on the deadline of the project is analyzed under these two circumstances. The study is done on a Critical Chain Project Management (CCPM) platform instead of leaving the schedule with a traditional Critical Path Method (CPM) finish, which gives an added advantage of validating the robustness of the emerging CCPM trend in the field of resource management.

  • PDF

SIMULATED ANNEALING FOR LINEAR SCHEDULING PROJECTS WITH MULTIPLE RESOURCE CONSTRAINTS

  • C.I. Yen
    • 국제학술발표논문집
    • /
    • The 2th International Conference on Construction Engineering and Project Management
    • /
    • pp.530-539
    • /
    • 2007
  • Many construction projects such as highways, pipelines, tunnels, and high-rise buildings typically contain repetitive activities. Research has shown that the Critical Path Method (CPM) is not efficient in scheduling linear construction projects that involve repetitive tasks. Linear Scheduling Method (LSM) is one of the techniques that have been developed since 1960s to handle projects with repetitive characteristics. Although LSM has been regarded as a technique that provides significant advantages over CPM in linear construction projects, it has been mainly viewed as a graphical complement to the CPM. Studies of scheduling linear construction projects with resource consideration are rare, especially with multiple resource constraints. The objective of this proposed research is to explore a resource assignment mechanism, which assigns multiple critical resources to all activities to minimize the project duration while satisfying the activities precedence relationship and resource limitations. Resources assigned to an activity are allowed to vary within a range at different stations, which is a combinatorial optimization problem in nature. A heuristic multiple resource allocation algorithm is explored to obtain a feasible initial solution. The Simulated Annealing search algorithm is then utilized to improve the initial solution for obtaining near-optimum solutions. A housing example is studied to demonstrate the resource assignment mechanism.

  • PDF

A Cost Estimation Model for Highway Projects in Korea

  • Kim, Soo-Yong;Kim, Young-Mok;Luu, Truong-Van
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2008년도 정기학술발표대회 논문집
    • /
    • pp.922-925
    • /
    • 2008
  • Many highway projects are under way in Korea. However, owners frequently find that the project cost exceeds the budget and they are unable to identify the underlining reasons. The main purpose of this research is to develop cost models for transportation projects in Korea using the multiple linear regression (MLR). The data consist of 27 completed transportation projects, built from 1991 to 2001, The technique of multiple regression analysis is used to develop the parametric cost estimating model for total budget cost per highway square meter (TBC/$m^2$). Findings of the study indicated that MLR car be applied to highway projects in Korea. There are twf) major contributions of this research. (1) the identification of transportation parameters as a significant cost driver for transportation costs and (2) the successful development of the parametric cost estimating models for transportation projects in Korea.

  • PDF

COST PERFORMANCE PREDICTION FOR INTERNATIONAL CONSTRUCTION PROJECTS USING MULTIPLE REGRESSION ANALYSIS AND STRUCTURAL EQUATION MODEL: A COMPARATIVE STUDY

  • D.Y. Kim;S.H. Han;H. Kim;H. Park
    • 국제학술발표논문집
    • /
    • The 2th International Conference on Construction Engineering and Project Management
    • /
    • pp.653-661
    • /
    • 2007
  • Overseas construction projects tend to be more complex than domestic projects, being exposed to more external risks, such as politics, economy, society, and culture, as well as more internal risks from the project itself. It is crucial to have an early understanding of the project condition, in order to be well prepared in various phases of the project. This study compares a structural equation model and multiple regression analysis, in their capacity to predict cost performance of international construction projects. The structural equation model shows a more accurate prediction of cost performance than does regression analysis, due to its intrinsic capability of considering various cost factors in a systematic way.

  • PDF

Buffer Management Method for Multiple Projects in the CCPM-MPL Representation

  • Nguyen, Thi Ngoc Truc;Takei, Yoshinori;Goto, Hiroyuki;Takahashi, Hirotaka
    • Industrial Engineering and Management Systems
    • /
    • 제11권4호
    • /
    • pp.397-405
    • /
    • 2012
  • This research proposes a framework of buffer management for multi-project systems in the critical chain project management (CCPM) method, expressed in the form of max-plus linear (MPL) representation. Since time buffers are inserted in the projects for absorbing uncertainties in task durations and protecting the completion times, the proposed method provides a procedure for frequently surveying the rates of consumed buffers and the rate of elapsed times. Their relation expresses the performance of the projects which is plotted on a chart through the completed processes. The chart presents the current performance of the projects and their interaction, which alerts managers to make necessary decisions at the right time for managing each project and the entire multi-project system. The proposed framework can analyze the complex system readily, and it enables managers to make an effective decision on scheduling. The effectiveness of the framework is demonstrated through a numerical example.

복수 개${\cdot}$보수 프로젝트의 자금제약하 프로그램 관리 - 자원제약 마스터-일정계획을 중심으로 - (Organizational Program Management of Multiple Maintenance Projects Under Fund Constraints)

  • 구교진
    • 한국건설관리학회논문집
    • /
    • 제5권2호
    • /
    • pp.211-218
    • /
    • 2004
  • 다수의 시설물을 보유한 기관에서는 유지보수와 리모델링(M/R) 프로젝트들이 동시에 진행되고 있다. 내부기능인력에 의해 프로젝트를 수행하는 자원제약 환경에서 프로젝트 관리자는 각 프로젝트의 완료일과 기관내 가용한 자원에 대한 제한을 고려하며 프로그램을 계획하고 관리하게 된다. 다중 자원제약 M/R 프로그램의 효과적 관리를 위해 이 논문은 장기적인 프로그램 계획축과 단기적인 일정창으로 구성되는 2단계 계층관리모델을 제안한다. 프로그램 플랜을 위한 연동계획기법은 연속되는 프로젝트 요청의 불확실성에 대처하기 위해 제안되었다. 일정창 속에서 마스터-일정계획을 수립하기 위해 개발된 PCR 일정계획 알고리즘은 M/R 프로그램에서의 작업반내 기능인력의 배치계획을 제공한다. 스프레드쉬트 인터페이스를 활용하여 M/R 프로그램의 일정계획 시스템을 개발하였고, 연속된 3개의 일정창으로 설계된 시뮬레이션 실험을 통해 개발된 일정계획 알고리즘과 기존의 자원제약 일정계획 휴리스틱의 성능을 비교하였다.

Development of an Eco-Value Engineering Support System

  • Sun-Im Kang;Jong-Hyeob Kim;Mi-A Jung;Chang-Taek Hyun;Sangwon Han
    • 국제학술발표논문집
    • /
    • The 5th International Conference on Construction Engineering and Project Management
    • /
    • pp.115-121
    • /
    • 2013
  • A number of urban renewal projects are currently being implemented around the world. Current project management tools are limited in effectively dealing with numerous issues regarding management of these projects (e.g., simultaneous execution of multiple projects). As an effort to address this deficiency, an Intelligent Program Management Information System (i-PgMIS) was developed for effective management of urban renewal projects. The i-PgMIS is a web-based system consisting of various modules including cost management, schedule management, risk management, change management, eco-value engineering (EVE) and so on. Based on the recognition of increasing awareness of creating sustainable built environment, this paper focuses on the EVE module that can support eco-value analysis at program-level management. The EVE module is expected to enhance value and sustainability of construction processes throughout the whole 'program' lifecycle and further to support program feasibility study based on life cycle costing.

  • PDF

UTILITY-BASED PERFORMANCE MEASUREMENT SYSTEM (UBPMS) FOR COMPARISON OF CONSTRUCTION PROJECTS

  • Ki-Hyun Kim;Hee-Sung Cha;Ju-Yeoun Han;Il-Han Yu
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.1509-1514
    • /
    • 2009
  • CII BM&M(Benchmarking & Metrics) in USA and DTI(Department of Trade and Industry) in UK have built up systems that enable performance measuring and made the results of performance measurement comparable between projects to utilize them as benchmarking tools. By comparing the results of performance measurement, it is possible to grasp the success level of project management and to establish the direction of management. However, construction projects are much diversified and even those projects with the same work type have different attributes. Therefore, simply comparing the results of project performance measurement without considering the characteristics of projects is not justifiable and affects the reliability of the benchmarking results. Therefore, to solve this problem, this study presents a methodology that makes it possible to compare the individual construction projects considering various characteristics. The benefits and importance of project characteristics to overall project performance will be quantitatively expressed and they will be reflected on the results of performance management. By maximally converting multiple projects with different characteristics into the same projects through a new methodology to convert different projects into the same level utilizing such utility-bases and comparing the performances of those projects, project performance results can be utilized in project management as a tool for more accurate decision making and as a robust benchmarking tool.

  • PDF