OPTIMIZING QUALITY AND COST OF METAL CURTAIN WALL USING MULTI-OBJECTIVE GENETIC ALGORITHM AND QUALITY FUNCTION DEPLOYMENT

  • Tae-Kyung Lim;Chang-Baek Son;Jae-Jin Son;Dong-Eun Lee
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.409-416
    • /
    • 2009
  • This paper presents a tool called Quality-Cost optimization system (QCOS), which integrates Multi-Objective Genetic Algorithm (MOGA) and Quality Function Deployment (QFD), for tradeoff between quality and cost of the unitized metal curtain-wall unit. A construction owner as the external customer pursues to maximize the quality of the curtain-wall unit. However, the contractor as the internal customer pursues to minimize the cost involved in designing, manufacturing and installing the curtain-wall unit. It is crucial for project manager to find the tradeoff point which satisfies the conflicting interests pursued by the both parties. The system would be beneficial to establish a quality plan satisfying the both parties. Survey questionnaires were administered to the construction owner who has an experience of curtain-wall project, the architects who are the independent assessor, and the contractors who were involved in curtain-wall design and installation. The Customer Requirements (CRs) and their importance weights, the relationship between CRs and Technical Attributes (TAs) consisting of a curtain-wall unit, and the cost ratios of each components consisting curtain-wall unit are obtained from the three groups mentioned previously. The data obtained from the surveys were used as the QFD input to compute the Owner Satisfaction (OS) and Contractor Satisfaction (CS). MOGA is applied to optimize resource allocation under limited budget when multi-objectives, OS and CS, are pursued at the same time. The deterministic multi-objective optimization method using MOGA and QFD is extended to stochastic model to better deal with the uncertainties of QFD input and the variability of QFD output. A case study demonstrates the system and verifies the system conformance.

  • PDF

Present and Future of Risk Management of Construction Practice in Asia

  • Watanabe, Tsunemi
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.4-5
    • /
    • 2015
  • Owning to rapid infrastructure development, Asia is experiencing dramatic economic growth. There are not a few cases in which, however, economic growth is achieved by increasing the external diseconomy. Pursuit of sustainable development is one of the most important issues for mankind. Under the post-industrial capitalism society, however, there seems a big risk of increase in the external diseconomy worldwide. The objectives of this manuscript are to discuss importance of risk management of construction practice in present and future. Regarding the latter, a particular attempt is made to discuss how project risk communication should be done to reduce the external diseconomy. Presently, one of the important issues in implementation of infrastructure projects is practice of risk management to properly manage time, cost, quality, and safety: mainly maximization of internal economy. Multi-party risk and uncertainty management process (MRUMP) is one of tolls to assist it. The idea on MRUMP can be used to reduce the external diseconomy through identifying, sharing, and tuning people's rhythms.

  • PDF

Selection of scheduling heuristics using neural network and MCDM (신경망과 다속성 의사결정 기법을 이용한 일정관리 휴리스틱의 선택)

  • 황인수;한재민
    • Korean Management Science Review
    • /
    • v.13 no.3
    • /
    • pp.173-186
    • /
    • 1996
  • This paper presents an approach for classifying scheduling problems and selecting a heuristic rule to yield best solution in terms of certain performance measure(s). Classification parameters are employed from previous studies on job shop scheduling and project scheduling. Neural network is used for learning and estimating the performance of heuristic rules. In addition, multi-criteria decision making techniques are employed to combine the preferences for each performance measure and heuristic rule for the problems with multi-objectives.

  • PDF

Development of Opportunity Extraction System for Generating New Research Themes by Using Multi-dimensional Space (다차원공간을 이용한 연구테마 기회발굴시스템의 개발)

  • Kim, Jeom-Bok;Gwon, Cheol-Sin
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 2005.10a
    • /
    • pp.103-111
    • /
    • 2005
  • In this paper, we have designed a deployment process system that extract and integrate information related to technology and market opportunities through searching for external environment and internal condition on multi-dimensional space in order to generate new research themes. It is expected that this theme extraction model could be contributed to the maximization of R&D productivity by systemization of the opportunity extraction process for generating research themes in R&D center or laboratory.

  • PDF

A STUDY ON DEVELOPING THE CALCULATION SYSTEM OF DISBURSEMENT FOR GOVERNMENT ON THE BTL PROJRCTS

  • Chun-Kyong Lee;Tae-Keun Park
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.649-657
    • /
    • 2009
  • BTL projects, which has been 3 years since it was carried out in 2008, trigged the controversy on the adequacy in the calculation of disbursement for Government due to such problems as low earning rate and the burden of service level compared with the project suggestion. Thus, the purpose of this study is to offer a suggestion on the calculation system for the purpose of the standardized - expense appropriation by item and database including the antecedent study on the finance model and the feasibility in BTL projects. The system is composed of 4 steps - project management, basic database, an analysis on expense by item and the result, and an analysis on sensitivity, and it is possible to carry out a comparative analysis on single and multi alternatives by variable change along with the ground on expense calculation.

  • PDF

OFF-SITE MANUFACTURE OF APARTMENT BUILDINGS

  • Neville Boyd
    • International conference on construction engineering and project management
    • /
    • 2011.02a
    • /
    • pp.304-310
    • /
    • 2011
  • The populations of major cities in Australia are increasing rapidly and facing an acute housing shortage. Traditional apartment procurement techniques involve lengthy lead-times and factory-based, or offsite manufactured (OSM) multi-storey apartment buildings may offer the opportunity to help fulfill the need by significantly reducing build times. Other advantages of OSM may include superior quality, low weight ratios, economies of scale achieved through repetition of prefabricated units, use on infill sites, sustainable design standards and better occupational health and safety. There are also positive labour and training implications, which may help to alleviate an industry-wide shortage of skills through use of semi-skilled labour. Previous uncertainties about the adoption of offsite due to the high capital costs and perception issues were generally based on pre-cast concrete structures, which are quite a different building type in terms of flexibility, construction, delivery and finishes. Identification of drivers and constraints assists in the determination of current industry status, allows for a benchmark to be established and future opportunities and directions for OSM to be determined.

  • PDF

Constructionarium: Turning Theory Into Practice

  • Stevens, Julia
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.1220-1220
    • /
    • 2022
  • Constructionarium Ltd is a not-for-profit organisation which delivers a residential, experiential, immersive learning opportunity to university students from across the built environment education sector. Since 2002, the Constructionarium education model has been available to students in engineering, construction management and architecture at a purpose built, 19-acre multi-disciplinary training facility in Bircham Newton, England simulating real site life and reflecting site processes, practices and health and safety requirements. The unique approach of Constructionarium puts experiential learning and sustainability at the heart of everything. In a week, students develop a practical understanding of the construction process, develop transferable skills, build a team and are exposed to the latest in sustainable technologies. Experiential learning is what differentiates a Constructionarium project from regular field trips or site visits. At Constructionarium the focus is on learning by participation rather than learning through theory or watching a demonstration. The projects cannot be replicated in a classroom or on campus. Using the hands-on construction of scaled down versions of iconic structures from around the world, students learn that it requires the involvement of the whole construction team to successfully complete their project. Skills such as communication, planning, budgeting, time management and decision making are woven into a week-long interrelationship with industry professionals, academic mentors and trades workers. Working together to enhance transferable skills brings the educational environment into the reality of completing an actual construction project handled by the students. Constructionarium has used this transformational learning model to educate thousands of students from all over the United Kingdom, Europe and Asia. Texas A&M University in the United States has sent multiple teams of students from its Department of Construction Science every operational year since 2016.

  • PDF

A Case Study on the Quality Management of Construction Site through PDCA Cycle (PDCA Cycle적용을 통한 건설현장 품질관리에 관한 사례연구)

  • Baik, In-Whee
    • Journal of the Korea Institute of Building Construction
    • /
    • v.8 no.1
    • /
    • pp.49-56
    • /
    • 2008
  • According to the recent trends which are the diversity of customer requests and the multi-function of buildings, A construction company's business has converted from the producer-oriented approach to the consumer-oriented approach. Therefore, each construction company is continuously trying to improve the quality level as a way of corresponding to customer needs in these changing situations. The quality is one of the main management targets which judge the success of a project along with the schedule, the cost and the safety. As construction companies execute the quality management which they aimed at, it should be completed within the optimum schedule and the limit of the budget. Accordingly, the importance of the construction site management to complete a project is continuously increasing. The construction site management is the systematic method to perform the project goals such as the quality improvement, the cost saving and the safety management, which organically operate one another, by procuring the manpower, the material and the machine in the right time. Specially, as the construction industry has based on the construction site, the establish of systematic construction site management, which can effectively correspond sudden changes of the construction business environment, is essential to maximize the construction productivity. On top of that, the necessity of the quality management method is increasing to accommodate customer needs more spontaneously in the construction site. These endeavors could guarantee their competitive power.

Critical Chain Project Management as a New Paradigm for Reducing the Project Delivery Time (프로젝트 일정 단축을 위한 새로운 경영 패러다임 Critical Chain Project Management(CCPM))

  • Jang, Seong-Yong
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.68-74
    • /
    • 2007
  • Critical Chain Project Management(CCPM) is a new project management system paradigm which maintains the advantages of PERT/CPM and improves the shortcomings of it. In CCPM the task durations are determined as 50% time estimates, ie average time discarding the their contingency. CCPM determines the critical chain the constraint of a projects considering the logical precedence relationship and resource conflict resolution. Project buffer is located at the end of critical chain to absorb the variations of critical chain. The size of project buffer is usually calculated as the half of the sum of critical chain length. Also feeding buffer is inserted after each non-critical chain which feeding into the critical chain to prevent the time delay of critical chain from uncertainties of non-critical chains. Resource buffer can be utilized to improve the availability of resources of critical chain. Buffer management is a project execution and control mechanism. Buffers are classified into 3 zones. They are OK zone, Watch and Plan zone and Expediting zone. If the project status is within Watch and Plan zone, contingency plan is established. And if it changes into Expediting zone, the preplanned contingency plan are executed to recover the time delay. In CCPM the workers are asked to work with relay runner work mechanism that they work fast if possible and report their completion to project manager for the succeeding task to start as soon as possible. The task durations are not considered as the promised time schedule. The multi-tasking is prohibited.

  • PDF

A study on the influence of supply chain management efficiency on the training supporting project in small and medium-sized enterprises (중소기업 인적자원개발 지원사업에 대한 공급망경영 유효성에 관한 연구)

  • Seo, Yohan;Kim, Kwang Yong;Sung, Jong Su
    • Journal of Korean Society for Quality Management
    • /
    • v.42 no.3
    • /
    • pp.407-424
    • /
    • 2014
  • Purpose: The purpose of this study was to propose supply chain management efficiency by analyzing moderating effect on the training support project in small and midium-sized enterprise. Methods: The collected data through the survey were analyzed using multi?regression analysis. The measurement tools used for this study were divided into three dimensions such as personal characteristics, supportive environment and training effect. Results: The results of this study are as follows; first, it was found that the effects of personal characteristics and supportive environment were significant on training effect. Second, significant differences were found between supply chain management active group and inactive group. Third, moderating effect of supply chain manage efficiency was found between variables. Conclusion: SME supporting project in training program needs supply chain management efficiency for training effect. Supply chain management needs to be promoted in SMEs not only for performance but also for their workplace learning and learning culture.