• Title/Summary/Keyword: Multi Project

Search Result 790, Processing Time 0.028 seconds

Study on Applicability of Multi-Criteria Decision Making Technique for Malfunctioning Reservoir Selection (기능저하 저수지 선정을 위한 다기준 의사결정기법 적용성 연구)

  • Shim, Hyun Chul;Choi, Kyung Sook
    • Journal of The Korean Society of Agricultural Engineers
    • /
    • v.59 no.3
    • /
    • pp.11-19
    • /
    • 2017
  • The decision-making process is the act of finding the best solution among various alternatives through comparison between various criteria based on objectives of the project, evaluation standard, and conditions. However, in practice it is not easy to simply decide the optimum decision, especially for selecting malfunctioning reservoirs because no systematic evaluation criteria or standard assessment process are available. Therefore, this study adopted AHP method, which is a MCDM (multi-criteria decision making technique) to identify the malfunctioning reservoirs for efficient management of reservoirs. Important criteria of the selection of malfunctioning reservoirs and priority weights of each criteria were determined based on results of expert's survey under a stepwise hierarchical approach. The most important factor for the decision of malfunctioning reservoirs was obtained as Reservoir efficiency among the selected criteria including Reservoir efficiency decrease, Disaster Risk, Reservoir efficiency, Available water storage, Future water demand, Resident Needs. The AHP technique was applied on 11 reservoirs in Andong region to verify its applicability. Scoring method was applied for the comparison with the results of AHP method.

Ka band Communication Payload System Technology of COMS (천리안 위성 Ka 대역 통신탑재체시스템 기술)

  • Lee, Seong-Pal;Jo, Jin-Ho;You, Moon-Hee;Choi, Jang-Sup;Ahn, Ki-Burm
    • Journal of Satellite, Information and Communications
    • /
    • v.5 no.2
    • /
    • pp.75-81
    • /
    • 2010
  • COMS (Communication, Ocean and Meteorological Satellite) is the multi-purposed Korean geostationary satellite funded by four Korean government ministries, and is to supply communication services, ocean and weather observation for 7 years. As part of COMS, development of Ka band communication payload composed of microwave switching transponder and multi-horn antenna is sponsored by KCC (Korea Communications Commission) and developed by ETRI (Electronics and Telecommunications Research Institute). The purpose of Ka Payload development is to acquire space proven technology of Ka payload and to exploit advanced multimedia communication services. This paper aims to study development technology of Ka payload system through whole process of ETRI project. Also application of Ka payload will be dealt in this paper.

STATUS AND PERSPECTIVE OF TWO-PHASE FLOW MODELLING IN THE NEPTUNE MULTISCALE THERMAL-HYDRAULIC PLATFORM FOR NUCLEAR REACTOR SIMULATION

  • BESTION DOMINIQUE;GUELFI ANTOINE;DEN/EER/SSTH CEA-GRENOBLE,
    • Nuclear Engineering and Technology
    • /
    • v.37 no.6
    • /
    • pp.511-524
    • /
    • 2005
  • Thermalhydraulic reactor simulation of tomorrow will require a new generation of codes combining at least three scales, the CFD scale in open medium, the component scale and the system scale. DNS will be used as a support for modelling more macroscopic models. NEPTUNE is such a new generation multi-scale platform developed jointly by CEA-DEN and EDF-R&D and also supported by IRSN and FRAMATOME-ANP. The major steps towards the next generation lie in new physical models and improved numerical methods. This paper presents the advances obtained so far in physical modelling for each scale. Macroscopic models of system and component scales include multi-field modelling, transport of interfacial area, and turbulence modelling. Two-phase CFD or CMFD was first applied to boiling bubbly flow for departure from nucleate boiling investigations and to stratified flow for pressurised thermal shock investigations. The main challenges of the project are presented, some selected results are shown for each scale, and the perspectives for future are also drawn. Direct Numerical Simulation tools with Interface Tracking Techniques are also developed for even smaller scale investigations leading to a better understanding of basic physical processes and allowing the development of closure relations for macroscopic and CFD models.

Commissioning Test of the MMC(Modular Multi-level Converter) type 25MVA HVDC Pilot Project (MMC(Modular Multi-level Converter) type 25MVA HVDC 실증단지 Commissioning Test)

  • Jeong, Jong-kyou;Jung, Hong-ju;Yoo, Hyun-ho;Park, Yong-hee;Lee, Doo-young
    • Proceedings of the KIPE Conference
    • /
    • 2017.07a
    • /
    • pp.282-283
    • /
    • 2017
  • 본 논문은 (주)효성 중공업연구소에서 국책과제를 통해 자체 개발한 MMC(Modular Multi-level Converter) type ${\pm}12kV$ 25MVA HVDC 시스템에 대하여 실증단지 구축 및 commissioning test에 대한 소개를 한다. 제주에 구축된 HVDC 실증단지는 국내 유일의 MMC type 전압형 HVDC 시스템이며 11-레벨의 AC 출력 전압을 형성하는 2개의 컨버터가 Back-to-Back 형태로 구성되어 있다. 각 컨버터의 AC 출력단은 각각 계통과 풍력발전단지에 연계되어 풍력발전단지에서 생산된 전력을 계통으로 전송하는 역할을 한다. 주요 AC/DC Yard 기기들로는 AC 고조파 필터, 밸브리액터, DC 리액터, 변압기, CGIS등이 있다. HVDC 의 commissioning test를 위해 IEEE, IEC, Cigre TB 등의 문서들을 종합 분석하여 당사의 시스템에 알맞은 시험절차서와 검증항목을 준비하였다. 본 논문에서는 당사에서 준비한 시험절차서 및 검증항목에 대하여 소개하고자 한다.

  • PDF

The Analysis on the Impact Factors of Delivery Method for Multi-Family Housing Projects (공동주택 건설공사의 발주방식 영향요인 분석)

  • Moon, Hyun-Seok;Hong, Tae-Hoon;Koo, Gyo-Jin;Hyun, Chang-Taek
    • Korean Journal of Construction Engineering and Management
    • /
    • v.9 no.3
    • /
    • pp.75-84
    • /
    • 2008
  • Recently, construction industry demands have been changed by domestic construction circumstances such as high-technology, mega-projects, and the complexity of construction. In order to deal with the change of such a domestic construction circumstances, the Ministry of Construction and Transportation (MOCT) has introduced advanced delivery methods. However, the advantages and disadvantages of the advanced delivery methods have not been effectively applied for previous projects. The reason for this is that the "Reviewing Standard for the Large-scale Construction Bidding Method" has not reflected enough prcject characteristics when the delivery method is selected in the project planning phase. Therefore, this paper proposes the Analysis on the Impact Factors of Delivery Method for Multi-Family Housing Projects.

A CBR-BASED COST PREDICTION MODEL FOR THE DESIGN PHASE OF PUBLIC MULTI-FAMILY HOUSING CONSTRUCTION PROJECTS

  • TaeHoon Hong;ChangTaek Hyun;HyunSeok Moon
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.203-211
    • /
    • 2009
  • Korean public owners who order public multi-family housing construction projects have yet to gain access to a model for predicting construction cost. For this reason, their construction cost prediction is mainly dependent upon historic data and experience. In this paper, a cost-prediction model based on Case-Based Reasoning (CBR) in the design phase of public multi-family housing construction projects was developed. The developed model can determine the total construction cost by estimating the different Building, Civil, Mechanical, Electronic and Telecommunication, and Landscaping work costs. Model validation showed an accuracy of 97.56%, confirming the model's excellent viability. The developed model can thus be used to predict the construction cost to be shouldered by public owners before the design is completed. Moreover, any change orders during the design phase can be immediately applied to the model, and various construction costs by design alternative can be verified using this model. Therefore, it is expected that public owners can exercise effective design management by using the developed cost prediction model. The use of such an effective cost prediction model can enable the owners to accurately determine in advance the construction cost and prevent increase or decrease in cost arising from the design changes in the design phase, such as change order. The model can also prevent the untoward increase in the duration of the design phase as it can effectively control unnecessary change orders.

  • PDF

Studies on Post Contract Schedule Analysis (준공현장의 분쟁해결방안으로서의 사후적 공정분석에 관한 연구)

  • KIHYUK, KO;SUNGPIL, PARK;YONGKIL, KIM
    • Journal of Arbitration Studies
    • /
    • v.32 no.4
    • /
    • pp.103-141
    • /
    • 2022
  • Traditionally, schedule analysis in Korea has been used, mainly through the Critical Path Method, to evaluate the claim for extension of time and/or the amount of liquidated damages for delay. Critical path method, however, cannot identify the delay event and its impact occurred in non-critical path especially in multi facility projects. In multi facility projects that comprise several independent but related facilities or structures, each facility has its own facility critical path the duration of which will be impacted by facility specific critical delays. Thus, only through the non-critical delay analysis along with the critical delay analysis damages not attributable to contractors may be remedied in full. Because all the records and pictures can reveal what has actually happened in post contract review, only the retrospective analysis rather than the prospective analysis based on the assumptions can establish the cause and allocate the each parties' responsibilities appropriately.

Updating BIM: Reflecting Thermographic Sensing in BIM-based Building Energy Analysis

  • Ham, Youngjib;Golparvar-Fard, Mani
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.532-536
    • /
    • 2015
  • This paper presents an automated computer vision-based system to update BIM data by leveraging multi-modal visual data collected from existing buildings under inspection. Currently, visual inspections are conducted for building envelopes or mechanical systems, and auditors analyze energy-related contextual information to examine if their performance is maintained as expected by the design. By translating 3D surface thermal profiles into energy performance metrics such as actual R-values at point-level and by mapping such properties to the associated BIM elements using XML Document Object Model (DOM), the proposed method shortens the energy performance modeling gap between the architectural information in the as-designed BIM and the as-is building condition, which improve the reliability of building energy analysis. The experimental results on existing buildings show that (1) the point-level thermography-based thermal resistance measurement can be automatically matched with the associated BIM elements; and (2) their corresponding thermal properties are automatically updated in gbXML schema. This paper provides practitioners with insight to uncover the fundamentals of how multi-modal visual data can be used to improve the accuracy of building energy modeling for retrofit analysis. Open research challenges and lessons learned from real-world case studies are discussed in detail.

  • PDF

Online Multi-Task Learning and Wearable Biosensor-based Detection of Multiple Seniors' Stress in Daily Interaction with the Urban Environment

  • Lee, Gaang;Jebelli, Houtan;Lee, SangHyun
    • International conference on construction engineering and project management
    • /
    • 2020.12a
    • /
    • pp.387-396
    • /
    • 2020
  • Wearable biosensors have the potential to non-invasively and continuously monitor seniors' stress in their daily interaction with the urban environment, thereby enabling to address the stress and ultimately advance their outdoor mobility. However, current wearable biosensor-based stress detection methods have several drawbacks in field application due to their dependence on batch-learning algorithms. First, these methods train a single classifier, which might not account for multiple subjects' different physiological reactivity to stress. Second, they require a great deal of computational power to store and reuse all previous data for updating the signle classifier. To address this issue, we tested the feasibility of online multi-task learning (OMTL) algorithms to identify multiple seniors' stress from electrodermal activity (EDA) collected by a wristband-type biosensor in a daily trip setting. As a result, OMTL algorithms showed the higher test accuracy (75.7%, 76.2%, and 71.2%) than a batch-learning algorithm (64.8%). This finding demonstrates that the OMTL algorithms can strengthen the field applicability of the wearable biosensor-based stress detection, thereby contributing to better understanding the seniors' stress in the urban environment and ultimately advancing their mobility.

  • PDF

DATA MININING APPROACH TO PARAMETRIC COST ESTIMATE IN EARLY DESIGN STAGE AND ANALYTICAL CHARACTERIZATION ON OLAP (ON-LINE ANALYTICAL PROCESSING)

  • JaeHo Cho;HyunKyun Jung;JaeYoul Chun
    • International conference on construction engineering and project management
    • /
    • 2011.02a
    • /
    • pp.176-181
    • /
    • 2011
  • A role of cost modeler is that of facilitating design process by the systematic application of cost factors so as to maintain sensible and economic relationships between cost, quantity, utility and appearance. These relationships help to achieve the client's requirements within an agreed budget. The purpose of this study is to develop a parametric cost estimating model for the early design stage by using the multi-dimensional system of OLAP (On-line Analytical Processing) based on the case of quantity data related to architectural design features. The parametric cost estimating models have been adopted to support decision making in the early design stage. These models typically use a similar instance or a pattern of historical case. In order to effectively use this type of data model, it is required to set data classification and prediction methods. One of the methods is to find the similar class in line with attribute selection measure in the multi-dimensional data model. Therefore, this research is to analyze the relevance attribute influenced by architectural design features with the subject of case-based quantity data used for the parametric cost estimating model. The relevance attributes can be analyzed by Analytical Characterization. It helps determine what attributes to be included in the OLAP multi-dimension.

  • PDF