• Title/Summary/Keyword: Multi Project

Search Result 790, Processing Time 0.026 seconds

Present and Future of Risk Management of Construction Practice in Asia

  • Watanabe, Tsunemi
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.4-5
    • /
    • 2015
  • Owning to rapid infrastructure development, Asia is experiencing dramatic economic growth. There are not a few cases in which, however, economic growth is achieved by increasing the external diseconomy. Pursuit of sustainable development is one of the most important issues for mankind. Under the post-industrial capitalism society, however, there seems a big risk of increase in the external diseconomy worldwide. The objectives of this manuscript are to discuss importance of risk management of construction practice in present and future. Regarding the latter, a particular attempt is made to discuss how project risk communication should be done to reduce the external diseconomy. Presently, one of the important issues in implementation of infrastructure projects is practice of risk management to properly manage time, cost, quality, and safety: mainly maximization of internal economy. Multi-party risk and uncertainty management process (MRUMP) is one of tolls to assist it. The idea on MRUMP can be used to reduce the external diseconomy through identifying, sharing, and tuning people's rhythms.

  • PDF

Development of the Space Cost Breakdown Structure(CBS) for Multi-Family Housing Projects (공공아파트 건설공사의 공간별 공사비분류체계 개발)

  • Hyun, Chang-Taek;Koo, Kyo-Jin;Yeon, Hee-Jung;Moon, Hyun-Seok;Cho, Kyu-Man;Hong, Tae-Hoon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.8 no.6
    • /
    • pp.178-187
    • /
    • 2007
  • As the government has enforced recently the policies on the distribution of the housing, the construction cost of multi-family housing projects has increasingly become very sensitive and political issue. However, it is difficult to predict the construction cost in planning and design phase of the project because the Bill of Quantity of the multi-family housing projects was composed of breakdown structure based on each work package. To predict the construction cost in planning and design phase for multi-family housing projects in more effective and reasonable way, this study developed the cost breakdown structure based on spaces using Delphi method. The Cost Breakdown Structure (CBS) based on spaces for multi-family housing projects basically consists of three parts: (i) Building part; (ii) Non-building part; and (iii) Additional part. The characteristics of spaces in multi-family housing projects are fully taken into consideration. Then these three parts were subdivided into work packages in terms of work tasks. Additionally, the usefulness and effectiveness of Space CBS in this paper were validated by analyzing the BOQs of several collected sample projects and matching with Space CBS afterwards.

Effect of cooling rate control on the change in hardness of the multi-purpose Ag-Pd-Zn-In-Sn alloy during porcelain firing simulation and post-firing heat treatment (다목적용 Ag-Pd-Zn-In-Sn계 합금의 모의소성 시 냉각속도의 조절이 소성 및 후열처리에 따른 경도변화에 미치는 영향)

  • Shin, Hye-Jeong;Kim, Min-Jung;Kwon, Yong-Hoon;Kim, Hyung-Il;Seol, Hyo-Joung
    • Korean Journal of Dental Materials
    • /
    • v.44 no.4
    • /
    • pp.337-348
    • /
    • 2017
  • In this study, the effect of cooling rate control on the change in hardness of the multi-purpose Ag-Pd-Zn-In-Sn alloy during porcelain firing simulation and post-firing heat treatment was investigated, and the following results were obtained. Softening of the multi-purpose Ag-Pd-Zn-In-Sn alloy during porcelain firing simulation was suppressed by controlling the cooling rate. When the cooling rate was adjusted to stage 0(firing chamber moves immediately to upper end position), the alloy was softened during porcelain firing simulation, and the hardness was greatly increased by the additional post-firing heat treatment. When the cooling rate was adjusted to stage 3(firing chamber remains closed), the alloy was not softened even after porcelain firing simulation, and the hardness was apparently lowered by the additional post-firing heat treatment. The apparent increase in hardness in the post-firing heat treated alloy after porcelain firing simulation at cooling rate of stage 0 attributed to the active precipitation. The apparent decrease in hardness in the post-firing heat treated alloy after porcelain firing simulation at cooling rate of stage 3 attributed to the fact that the precipitates were solutionized into the matrix by the post-firing heat treatment.

A Study on the Growth Proccess and Strategic Niche Management of New Energy Technology: A Case Study with Government Supporting Photovoltaic R&D Project (전략적 니치관리(SNM)를 활용한 정부 신재생 R&D 성장과정 분석)

  • Kim, Bong-Gyun;Moon, Sun-Woo
    • Journal of Technology Innovation
    • /
    • v.20 no.2
    • /
    • pp.161-187
    • /
    • 2012
  • Recently, environmentally friendly technology are becoming important due to reconsideration about climate change and environmental pollution. In addition, as well as technical skills and social interaction through an analysis of the nonlinear transition management and policy implementation are emerging. This study of the development of photovoltaic industry in Korea 10 years analyze with strategic niche management (SNM) based on the theoretical and multi-layered perspective (MLP) is used as the analytical framework. Choose the gerverment-support project for niche technology, through a process of quantifying and alnalyze the phase transition to Regime with the numerical method and policy vision, learning effects, and network that key elements of SNM, MLP. Through the analysis of the photovoltaic industry technology-commercialization phase was investigated. This conventional overall and step-by-step model for technical management is proposed to replace exiting linear and narrow method and through the case study its validity was confirmed.

  • PDF

Multi-Dimensional Flood Damage Analysis (Ⅰ): Principle and Procedure (다차원 홍수피해산정방법(Ⅰ): 원리 및 절차)

  • Choi, Seung-An;Yi, Choong-Sung;Shim, Myung-Pil;Kim, Hung-Soo
    • Journal of Korea Water Resources Association
    • /
    • v.39 no.1 s.162
    • /
    • pp.1-9
    • /
    • 2006
  • Recently, the flood damages including losses of human lifes and property have been rapidly increased according to extreme floods. And we know that the flood control project is needed for diminishing flood damages. However, we have had the lacks in a reasonable methodology for the economic analysis of food control project. This study aims to improve the existing economic analysis method for flood control project. So, first of all, we understand the problems of existing economic analysis and investigate the methodologies of foreign countries. Based on that, the Multi-Dimensional Flood Damage Analysis(MD-FDA) is developed in this study. The survey of properties on the floodplain is conducted, then the damage rate obtained by evaluating the monetary values of surveyed property is applied, and the expected flood damage is calculated. Also by considering damage area in the floodplain as well as spatial distribution of inundated depth using GIS, the flood damages are evaluated more accurately than existing method. From the study, we know that the MD-FDA can improve the problems of existing method and evaluate the reasonable flood damages by using updated nation리 statistics.

Predicting the success of CDM Registration for Hydropower Projects using Logistic Regression and CART (로그 회귀분석 및 CART를 활용한 수력사업의 CDM 승인여부 예측 모델에 관한 연구)

  • Park, Jong-Ho;Koo, Bonsang
    • Korean Journal of Construction Engineering and Management
    • /
    • v.16 no.2
    • /
    • pp.65-76
    • /
    • 2015
  • The Clean Development Mechanism (CDM) is the multi-lateral 'cap and trade' system endorsed by the Kyoto Protocol. CDM allows developed (Annex I) countries to buy CER credits from New and Renewable (NE) projects of non-Annex countries, to meet their carbon reduction requirements. This in effect subsidizes and promotes NE projects in developing countries, ultimately reducing global greenhouse gases (GHG). To be registered as a CDM project, the project must prove 'additionality,' which depends on numerous factors including the adopted technology, baseline methodology, emission reductions, and the project's internal rate of return. This makes it difficult to determine ex ante a project's acceptance as a CDM approved project, and entails sunk costs and even project cancellation to its project stakeholders. Focusing on hydro power projects and employing UNFCCC public data, this research developed a prediction model using logistic regression and CART to determine the likelihood of approval as a CDM project. The AUC for the logistic regression and CART model was 0.7674 and 0.7231 respectively, which proves the model's prediction accuracy. More importantly, results indicate that the emission reduction amount, MW per hour, investment/Emission as crucial variables, whereas the baseline methodology and technology types were insignificant. This demonstrates that at least for hydro power projects, the specific technology is not as important as the amount of emission reductions and relatively small scale projects and investment to carbon reduction ratios.

Research in information & communication technology for water in the four major rivers restoration project (4대강 사업에서 수자원 정보통신기술 발전방향연구)

  • Seo, Gang-Do;Jang, Sang-Bok;Lee, Dong-Hoon;Hwang, Jae-moon;Park, Byung-Don
    • Proceedings of the Korean Institute of Information and Commucation Sciences Conference
    • /
    • 2013.10a
    • /
    • pp.184-187
    • /
    • 2013
  • The Four Major Rivers Restoration Project of is the multi-purpose green growth project in South Korea. Some of the project was progressed by K-water and was declared complete on October 21, 2011. The Four Rivers Restoration Project of Korea was designed to be a packaged project that aims to resolve water-related problems such as floods and droughts and revitalize Korean public spaces near the water. K-water have applied the latest ICT(Information and Communication Technology) for the operating management of 4 Rivers Project facilities. We also have applied ICT for integrating drinking water production facilities. Applying these ICT, we have many experience for integrated water resources management, so we proposed. The first is that the big data collected should be analyzed for making decisions and taking actions while considering multiple viewpoints of how water should be managed. The second is that the new MMI(Man Machine Interface) program should be developed to use domestic needs and promote ease of maintenance for the integrated operation. The third is that the standardization of communication protocol is needed for seamless communication between equipments.

  • PDF

Effect of Multyparty Contract in IPD Project Case study of USA and Korean Projects (IPD 계약은 IPD 프로젝트의 필수조건인가 - 국내외 사례조사를 통하여 -)

  • Yoo, Seungeun;Kim, Taewan;Yu, Jungho
    • Korean Journal of Construction Engineering and Management
    • /
    • v.18 no.1
    • /
    • pp.3-16
    • /
    • 2017
  • Integrated project delivery (IPD) is suggested as an alternative to traditional delivery methods such as design-build (DB), design-bid-build (DBB), and construction management at risk (CMR). Many foreign research studies have approached IPD not only in the contractual aspect but also the work implementation method aspect. However, most research projects in Korea have focused on the contractual aspect of IPD for asserting that the characteristics are the critical matter. The Korean institutional and legal system does not permit the multi-party agreement; therefore, it is difficult to adopt IPD in Korea's construction industry. The researchers do not wait the system to be changed, but we do identify the possibility of adopting IPD in Korea in the perspective of work implementation method, except the contractual characteristics. Thus, the goal of this research is to identify one project that does not include IPD agreement but utilizes other IPD characteristics whose contractual results have similar performance to those that utilize all characteristics of IPD including agreement. This research is expected to enhance performance of the construction project in a Korean construction environment by embracing IPD characteristics as overcoming limits and bounds of the traditional delivery method.

A Study on the Changes in Residential Environments after Residential Environments Improvement Projects (주거환경개선사업이후 주거 환경 변화에 관한 연구 - 대구광역시 주거환경개선사업의 물리적 환경 분석을 중심으로 -)

  • Kim, Young-Hwa;Lee, Sang-Hong
    • Journal of the Architectural Institute of Korea Planning & Design
    • /
    • v.34 no.10
    • /
    • pp.3-12
    • /
    • 2018
  • This research aims at analyzing the changes in residential environment after a residential environment improvement project focusing on the analysis into the physical environment of a residential environment improvement project, and examining in what direction the changes by residents' own efforts occurred after public support, such as infrastructure. The present residence development method has become different from the previous pulling down method and is focused on regeneration. By examining in what direction the target residence is being changed because of the development by residents' own efforts after the government's public investment at this time, this study also aims at investigating the direction to develop a guideline for residential improvement for later improvement of deteriorated residence. As for the contents of the analysis, changes in public support, such as infrastructure, and other areas after the residential environment improvement project were compared and analyzed from the land use, street system, and condition of buildings before the residential environment improvement project through field survey, geographic information system(GIS), registered land and building data and so on. The biggest change since the support from the government was that at the beginning of the project, the application of special provision of building laws and different financial supports led to lots of newly built buildings. Since then, their number has decreased rapidly, and in most cases, there have been some changes in part, such as changes in the use of land or repair of disposal tanks. Most newly built buildings were multi-household houses, and it has caused road capacity and parking lot capacity, etc., to be exceeded, which has worsened the pleasantness of the living environment. In addition, other problems have also appeared, for example, the lack of residence supporting facilities yet with a higher level of residential density. Regarding the changes in the residential environment after the residential environment improvement project, maintenance of houses were conducted in some degree as diverse alleviation policies to improve poor residence, yet the absence of the guideline for the direction of developing the whole district has made the residence environment more dense and deteriorated. To solve these problems, in advance to a residential improvement project, specific management methods based on short-, mid- and long-term plans for the direction of development by residents' own efforts and a sustainable guideline seem to be necessary.

Priority of Residential Choice and Housing Satisfaction among Studio-type Multi-family Housing Dwellers in the City of Gwangju (원룸형 다가구주택 거주자의 주거선택 중요도와 주거만족도 - 광주광역시를 중심으로 -)

  • Kang, Hi-Goo;Kim, Mi-Hee
    • Journal of the Korean housing association
    • /
    • v.21 no.3
    • /
    • pp.11-21
    • /
    • 2010
  • The purpose of this study is to gather baseline data on perceived priority of residential choice and housing satisfaction rates among consumers with the aim of using this information for future planning. Self-administered questionnaires were provided to 196 studio-type multi-family housing dwellers in the City of Gwangju from 2009 Apri 5th to 29th. The collected data was used to conduct comparative and descriptive statistical analysis: factor analysis, t-test, one-way ANOVA, correlation analysis. The main findings obtained are as follows: Firstly, in relation to perceived priority of residential choice, dwellers identified seven factors as important. Secondly, in terms of housing satisfaction about a unit room, the respondents identified five factors as important. This study confirmed that there existed passive correlation between priority of residential choice and housing satisfaction among residents in studio-type multi-family housings in Gwangju. It is very necessary to project a studio-type multi-family housing close to transportation for easy access, avoiding commercial districts. Delicate interior and design will attract more female residents as well as fully-equipped parking lots for people who drive to their workplace. According to research on a degree of housing satisfaction, all respondents expressed dissatisfaction with "noise". Therefore, in dealing with construction plans of studio apartment units, from now on, sound proofing facilities are required to reduce the acoustic invasion of privacy, especially, for units with more than two people. In order to satisfy all the demand of residents in studio apartment units, we have to pursue systematic and succeeding research about a studio-type multi-family housing well-fitted for the actual circumstances of local area and suitable for longer stay. To sum up, more research and development will be required for high-class studio-type multiplex housing for sale in dealing with households with financial stability such as two-paycheck couples, so-called DINK, or a professional single person, in the future.