• Title/Summary/Keyword: Monthly forecasting

Search Result 184, Processing Time 0.019 seconds

A Study on Onion Wholesale Price Forecasting Model (양파 출하시기 도매가격 예측모형 연구)

  • Nam, Kuk-Hyun;Choe, Young-Chan
    • Journal of Agricultural Extension & Community Development
    • /
    • v.22 no.4
    • /
    • pp.423-434
    • /
    • 2015
  • This paper predicts the onion's cultivation areas, yields per unit area, and wholesale prices during ship dates by using wholesale price data from the Korea Agro-Fisheries & Food Trade Corporation, the production data from the Statistics Korea, and the weather data from the Korea Meteorological Administration with an ARDL model. By analyzing the data of wholesale price, rural household income and rural total earnings, onion cultivation areas in 2015 are estimated to be 21,035, 17,774 and 20,557(ha). In addition, onion yields per unit area of South Jeolla Province, North Gyeongsang Province, South Gyeongsang Province, Jeju Island, and the whole country in 2015 are estimated to be 5,980, 6,493, 6,543, 6,614, 6,139 (kg/10a) respectively. By using onion production's predictive value found from onion's cultivation areas and yields per unit area in 2015, the onion's wholesale prices in June are estimated to be 780 won, 1,100 won, and 820 won for each model. Predicted monthly price after the onion's ship dates is analyzed to exceed 1,000 won after August.

The Comparison of Imputation Methods in Time Series Data with Missing Values (시계열자료에서 결측치 추정방법의 비교)

  • Lee, Sung-Duck;Choi, Jae-Hyuk;Kim, Duck-Ki
    • Communications for Statistical Applications and Methods
    • /
    • v.16 no.4
    • /
    • pp.723-730
    • /
    • 2009
  • Missing values in time series can be treated as unknown parameters and estimated by maximum likelihood or as random variables and predicted by the expectation of the unknown values given the data. The purpose of this study is to impute missing values which are regarded as the maximum likelihood estimator and random variable in incomplete data and to compare with two methods using ARMA model. For illustration, the Mumps data reported from the national capital region monthly over the years 2001 ${\sim}$ 2006 are used, and results from two methods are compared with using SSF(Sum of square for forecasting error).

A Study on Forecasting Method for a Short-Term Demand Forecasting of Customer's Electric Demand (수요측 단기 전력소비패턴 예측을 위한 평균 및 시계열 분석방법 연구)

  • Ko, Jong-Min;Yang, Il-Kwon;Song, Jae-Ju
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.58 no.1
    • /
    • pp.1-6
    • /
    • 2009
  • The traditional demand prediction was based on the technique wherein electric power corporations made monthly or seasonal estimation of electric power consumption for each area and subscription type for the next one or two years to consider both seasonally generated and local consumed amounts. Note, however, that techniques such as pricing, power generation plan, or sales strategy establishment were used by corporations without considering the production, comparison, and analysis techniques of the predicted consumption to enable efficient power consumption on the actual demand side. In this paper, to calculate the predicted value of electric power consumption on a short-term basis (15 minutes) according to the amount of electric power actually consumed for 15 minutes on the demand side, we performed comparison and analysis by applying a 15-minute interval prediction technique to the average and that to the time series analysis to show how they were made and what we obtained from the simulations.

A Study on Forecasting Visit Demands of Korea National Park Using Seasonal ARIMA Model (계절 ARIMA 모형을 이용한 국립공원 탐방수요 예측)

  • Sim, Kyu-Won;Kwon, Heon-Gyo
    • Journal of Korean Society of Forest Science
    • /
    • v.100 no.1
    • /
    • pp.124-130
    • /
    • 2011
  • This study was conducted to find out appropriate model and forecast visit demand of korea national parks using seasonal ARIMA model. Data of monthly visitors uses of 18 korea national parks from January, 2003 to December, 2010 was used to analyze. The result showed that $ARIMA(1,0,0)(1,1,0)_{12}$ model was selected as a appropriate model to forecast visit demand of korea national parks and the result of post evaluation used by index of mean absolute percentage error was accurate. Therefore, the result of this study will enhance reliability and validity of forecasting technique and contribute to management strategy of korea national park.

Price Forecasting on a Large Scale Data Set using Time Series and Neural Network Models

  • Preetha, KG;Remesh Babu, KR;Sangeetha, U;Thomas, Rinta Susan;Saigopika, Saigopika;Walter, Shalon;Thomas, Swapna
    • KSII Transactions on Internet and Information Systems (TIIS)
    • /
    • v.16 no.12
    • /
    • pp.3923-3942
    • /
    • 2022
  • Environment, price, regulation, and other factors influence the price of agricultural products, which is a social signal of product supply and demand. The price of many agricultural products fluctuates greatly due to the asymmetry between production and marketing details. Horticultural goods are particularly price sensitive because they cannot be stored for long periods of time. It is very important and helpful to forecast the price of horticultural products which is crucial in designing a cropping plan. The proposed method guides the farmers in agricultural product production and harvesting plans. Farmers can benefit from long-term forecasting since it helps them plan their planting and harvesting schedules. Customers can also profit from daily average price estimates for the short term. This paper study the time series models such as ARIMA, SARIMA, and neural network models such as BPN, LSTM and are used for wheat cost prediction in India. A large scale available data set is collected and tested. The results shows that since ARIMA and SARIMA models are well suited for small-scale, continuous, and periodic data, the BPN and LSTM provide more accurate and faster results for predicting well weekly and monthly trends of price fluctuation.

Forecasting of Hairtail (Trichiurus lepturus) Landings in Korean Waters by Times Series Analysis (시계열 분석에 의한 어획량 예측 - 한국 근해산 갈치를 예로 하여 -)

  • YOO Sinjae;ZHANG Chang-Ik
    • Korean Journal of Fisheries and Aquatic Sciences
    • /
    • v.26 no.4
    • /
    • pp.363-368
    • /
    • 1993
  • Short-term forecasting of fish catch is of practical importance in fisheries management. Ecosystem models and multi-species models as well as traditional single-species models fall short of predicting power needed for practical management of fisheries resources due to the lack of sufficient data or information for the required parameters. Univariate time series analysis, on the other hand, extracts the information on the stochastic variability from the time series itself and makes estimates of the future stochastic variability. Therefore, it can be used for short-term forecasting with minimum data requirements. ARIMA time series modeling has been applied to the monthly Korean catches of hairtail (Trichiurus lepturus) for $1971{\sim}1988$. Forecasts of hairtail catch were made and compared with the actual catch data from $1989{\sim}1990$ which were not included in the parameter estimation. The results showed a good agreement (r=0.938) between the forecasts and the actual catches with a mean rotative error of $59.5\%$

  • PDF

Predictive Analysis of Traffic Accidents caused by Negligence of Safe Driving in Elderly using Seasonal ARIMA (계절 ARIMA 모형을 이용한 고령운전자의 안전운전불이행에 의한 교통사고건수 예측분석)

  • Kim, Jae-Moon;Chang, Sung-Ho;Kim, Sung-Soo
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.40 no.1
    • /
    • pp.65-78
    • /
    • 2017
  • Even though cars have a good effect on modern society, traffic accidents do not. There are traffic laws that define the regulations and aim to reduce accidents from happening; nevertheless, it is hard to determine all accident causes such as road and traffic conditions, and human related factors. If a traffic accident occurs, the traffic law classifies it as 'Negligence of Safe Driving' for cases that are not defined by specific regulations. Meanwhile, as Korea is already growing rapidly elderly population with more than 65 years, so are the number of traffic accidents caused by this group. Therefore, we studied predictive and comparative analysis of the number of traffic accidents caused by 'Negligence of Safe Driving' by dividing it into two groups : All-ages and Elderly. In this paper, we used empirical monthly data from 2007 to 2015 collected by TAAS (Traffic Accident Analysis System), identified the most suitable ARIMA forecasting model by using the four steps of the Box-Jenkins method : Identification, Estimation, Diagnostics, Forecasting. The results of this study indicate that ARIMA $(1, 1, 0)(0, 1, 1)_{12}$ is the most suitable forecasting model in the group of All-ages; and ARIMA $(0, 1, 1)(0, 1, 1)_{12}$ is the most suitable in the group of Elderly. Then, with this fitted model, we forecasted the number of traffic accidents for 2 years of both groups. There is no large fluctuation in the group of All-ages, but the group of Elderly shows a gradual increase trend. Finally, we compared two groups in terms of the forecast, suggested a countermeasure plan to reduce traffic accidents for both groups.

A Forecast of Shipping Business during the Year of 2013 (해운경기의 예측: 2013년)

  • Mo, Soo-Won
    • Journal of Korea Port Economic Association
    • /
    • v.29 no.1
    • /
    • pp.67-76
    • /
    • 2013
  • It has been more than four years since the outbreak of global financial crisis. However, the world economy continues to be challenged with new crisis such as the European debt crisis and the fiscal cliff issue of the U.S. The global economic environment remains fragile and prone to further disappointment, although the balance of risks is now less skewed to the downside than it has been in recent years. It's no wonder that maritime business will be bearish since the global business affects the maritime business directly as well as indirectly. This paper, hence, aims to predict the Baltic Dry Index representing the shipping business using the ARIMA-type models and Hodrick-Prescott filtering technique. The monthly data cover the period January 2000 through January 2013. The out-of-sample forecasting performance is measured by three summary statistics: root mean squared percent error, mean absolute percent error and mean percent error. These forecasting performances are also compared with those of the random walk model. This study shows that the ARIMA models including Intervention-ARIMA have lower rmse than random walk model. This means that it's appropriate to forecast BDI using the ARIMA models. This paper predicts that the shipping market will be more bearish in 2013 than the year 2012. These pessimistic ex-ante forecasts are supported by the Hodrick-Prescott filtering technique.

Forecasts of the 2011-BDI Using the ARIMA-Type Models (ARIMA모형을 이용한 2011년 BDI의 예측)

  • Mo, Soo-Won
    • Journal of Korea Port Economic Association
    • /
    • v.26 no.4
    • /
    • pp.207-218
    • /
    • 2010
  • The purpose of the study is to predict the shipping business during the period of 2011 using the ARIMA-type models. This include the ARIMA and Intervention-ARIMA models. The multivariate cause-effect econometric model is not employed for not assuring a higher degree of forecasting accuracy than the univariate variable model. Such a cause-effect econometric model also fails in adjusting itself for the post-sample. This article introduces the four ARIMA models and six Intervention-ARIMA models. The monthly data cover the period January 2000 through October 2010. The out-of-sample forecasting performance is compared between the ARIMA-type models and the random walk model. Forecasting performance is measured by three summary statistics: root mean squared percent error, mean absolute percent error and mean percent error. The root mean squared percent errors of all the ARIMA-type models are somewhat higher than normally expected. Furthermore, the random walk model outperforms all the ARIMA-type models. This reveals that the BDI is just a random walk phenomenon and it's meaningless to predict the BDI using various econometric techniques. The ARIMA-type models show that the shipping market is expected to be bearish in 2011. These pessimistic ex-ante forecasts are supported by the Hodrick-Prescott filtering technique.

A Study on the Wind Data Analysis and Wind Speed Forecasting in Jeju Area (제주지역 바람자료 분석 및 풍속 예측에 관한 연구)

  • Park, Yun-Ho;Kim, Kyung-Bo;Her, Soo-Young;Lee, Young-Mi;Huh, Jong-Chul
    • Journal of the Korean Solar Energy Society
    • /
    • v.30 no.6
    • /
    • pp.66-72
    • /
    • 2010
  • In this study, we analyzed the characteristics of wind speed and wind direction at different locations in Jeju area using past 10 years observed data and used them in our wind power forecasting model. Generally the strongest hourly wind speeds were observed during daytime(13KST~15KST) whilst the strongest monthly wind speeds were measured during January and February. The analysis with regards to the available wind speeds for power generation gave percentages of 83%, 67%, 65% and 59% of wind speeds over 4m/s for the locations Gosan, Sungsan, Jeju site and Seogwipo site, respectively. Consequently the most favorable periods for power generation in Jeju area are in the winter season and generally during daytime. The predicted wind speed from the forecast model was in average lower(0.7m/s) than the observed wind speed and the correlation coefficient was decreasing with longer prediction times(0.84 for 1h, 0.77 for 12h, 0.72 for 24h and 0.67 for 48h). For the 12hour prediction horizon prediction errors were about 22~23%, increased gradually up to 25~29% for 48 hours predictions.