• Title/Summary/Keyword: Module Plants

Search Result 153, Processing Time 0.027 seconds

A Study on Real-time simulation using Artificial Neural Network (신경회로망을 이용한 실시간 시뮬레이션에 관한 연구 (원자력 발전소 중대사고를 중심으로))

  • Roh, Chang-Hyun;Jung, Kwang-Ho
    • Journal of Korea Game Society
    • /
    • v.2 no.2
    • /
    • pp.46-51
    • /
    • 2002
  • In this study, a real-time simulation method for the phenomena, which are too complex to be simulated during real-time computer games, was proposed based on the neural network. The procedure of proposed method is to 1) obtain correlation data between input parameters and output parameters by mathematical modeling, code analyses, and so on, 2) train the neural network with the correlation data, 3) and insert the trained neural network in a game program as a simulation module. For the case that the number of the input and output parameters is too high to be analyzed, a method was proposed to omit parameters of little importance. The method was successfully applied to severe accidents of nuclear power plants, reflecting that the method was very effective in real time simulation of complex phenomena.

  • PDF

Modeling and Simulation for Dynamic Behaviors of SOVR for Electric Power Plant (P&S를 활용한 발전용 SOVR의 모델링과 동특성 해석)

  • 노태정
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 2000.10a
    • /
    • pp.203-203
    • /
    • 2000
  • The P&S(Power Plant Simulation System) is a powerful simulation software system for the dynamic behavior of power plants. The P&S module libraries provide plant models with higher flexibility of dynamic simulations for process and control designs. The P&S software was effectively available for PCS based on Linux and modem workstations based on Unix. The P&S was applied for simulating the dynamic behaviors of the SOVR(Supercritical Once-Through Variable Pressure Reheater) according to the operations such as stan-up, shutdown, load following, load change and trip in order to obtain an optimal operation procedure for Unit 5/6 of Taeahn fossil power plant consisted of SOVRs and steam turbines.

  • PDF

RISKY MODULE PREDICTION FOR NUCLEAR I&C SOFTWARE

  • Kim, Young-Mi;Kim, Hyeon-Soo
    • Nuclear Engineering and Technology
    • /
    • v.44 no.6
    • /
    • pp.663-672
    • /
    • 2012
  • As software based digital I&C (Instrumentation and Control) systems are used more prevalently in nuclear plants, enhancement of software dependability has become an important issue in the area of nuclear I&C systems. Critical attributes of software dependability are safety and reliability. These attributes are tightly related to software failures caused by faults. Software testing and V&V (Verification and Validation) activities are hence important for enhancing software dependability. If the risky modules of safety-critical software can be predicted, it will be possible to focus on testing and V&V activities more efficiently and effectively. It should also make it possible to better allocate resources for regulation activities. We propose a prediction technique to estimate risky software modules by adopting machine learning models based on software complexity metrics. An empirical study with various machine learning algorithms was executed for comparing the prediction performance. Experimental results show SVMs (Support Vector Machines) perform as well or better than the other methods.

Intelligent Software System for the Advanced Control Room of a Nuclear Power Plant

  • Chang, Soon-Heung;Park, Seong-Soo;Park, Jin-Kyun;Gyunyoung Heo;Kim, Han-Gon
    • Proceedings of the Korean Nuclear Society Conference
    • /
    • 1997.10a
    • /
    • pp.443-448
    • /
    • 1997
  • The intelligent software system for nuclear power plants (NPPs) has been conceptually designed in this study. Its design goals are to operate NPPs in n improved manner and to support operators' cognitive tasks. It consists of six major modules such as "Information Processing," "Alarm Processing," "Procedure Tracking," "Performance Diagnosis," and "Event Diagnosis" modules for operators and "Malfunction Diagnosis" module for maintenance personnel. Most of the modules have been developed for several years and the others are under development. After the completion of development, they will be combined into one system that would be main parts of advanced control rooms in NPPs. that would be main parts of advanced control rooms in NPPs.

  • PDF

Prediction of Prestressing Losses by Concrete Creep and Shrinkage (콘크리트 크리프 및 건조수축에 의한 프리스트레싱 손실량 예측)

  • 송영철;조명석;우상균;이태규
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 1998.10b
    • /
    • pp.649-655
    • /
    • 1998
  • In this study, the personal-computer program was developed to predict prestressing losses containment structures of Nuclear Power Plants by concrete creep and shrinkage. This program is constituted of three parts, which are pre-processor, calculation module and post-processor. Input data for his program are : material properties of concrete, rebar, liner and duct, test results of concrete creep and shrinkage, relative humidity, dimension of containment structures, and the number of prestressing tendon related on containment structures. To obtain better results, this program was made to reflect the prestressing losses due to influence that occurred after prestressing each tendon, thus it can predict prestressing losses and allowable prestressing forces of each tendon. As a case study, this program was applied to containment structures of Youngwang 3 & 4 NPP's and analytical result was compared with test results in In-service Inspection of containment structures. From this comparison, it was proved that this program could well predict prestressing losses by concrete creep and shrinkage.

  • PDF

Fuzzy Methods for the design of Digital Controllers with Intelligent Calibration (지능형 자동 보정화 디지털 제어기 설계를 위한 퍼지 기법)

  • 나승유;박민상
    • Proceedings of the Korean Institute of Intelligent Systems Conference
    • /
    • 1998.10a
    • /
    • pp.187-190
    • /
    • 1998
  • The values of physical components of the plants and controllers as well as the relevant environmental conditions change in time, thus the output performance can be deteriorated during the operating span of the system. Naturally the duty of calibration or the prevention of performance deterioration due to excessive component sensitivity should be provided to the control system. The proposed controller, whenever necessary, measures the open-loop and close-loop characteristics, and then calculates the offset and sensor gain correction values based on the prepared standard measurements It is applied to the control of a flexible link system with the gain and offset calibration problems in the light sensor module for position to show the applicability. In this paper, we propose a digital controller which has the capability of calibration gain and offset adjustment using fuzzy methods.

  • PDF

Development and Application of Integrated Management System in Nuclear Power Plant Construction Project

  • Lee, Sang Hyun;Byon, Su Jin
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.700-701
    • /
    • 2015
  • Nuclear power plant construction project can be called essential to establish a systematic project management system compared to other construction projects, taking into account the size and complexity and safety. To develop into a project management system for the Korea situation with the ongoing construction of the nuclear power plant was directed to promote nuclear power project management. In this paper, we introduce a comprehensive project management system for nuclear power projects. Currently considering the nuclear life cycle design, construction, and was developed by considering the flow of information to operate, and test each step linkage. The systems in English were developed to meet owner's requirements for advancing into overseas projects. Another point is that the systems were developed by management module, so that functions of each area can be selectively applied. It is expected that the system will establish itself as one that can be used for the entire lifecycle of nuclear power plants through gradual and systematic establishment of necessary data.

  • PDF

Leakage noise detection using a multi-channel sensor module based on acoustic intensity (음향 인텐시티 기반 다채널 센서 모듈을 이용한 배관 누설 소음 탐지)

  • Hyeonbin Ryoo;Jung-Han Woo;Yun-Ho Seo;Sang-Ryul Kim
    • The Journal of the Acoustical Society of Korea
    • /
    • v.43 no.4
    • /
    • pp.414-421
    • /
    • 2024
  • In this paper, we design and verify a system that can detect piping leakage noise in an environment with significant reverberation and reflection using a multi-channel acoustic sensor module as a technology to prevent major plant accidents caused by leakage. Four-channel microphones arranged in a tetrahedron are designed as a single sensor module to measure three-dimensional sound intensity vectors. In an environment with large effects of reverberation and reflection, the measurement error of each sensor module increases on average, so after placing multiple sensor modules in the field, measurement results showing locations with large errors due to effects such as reflection are excluded. Using the intersection between three-dimensional vectors obtained from several pairs of sensor modules, the coordinates where the sound source is located are estimated, and outliers (e.g., positions estimated to be outside the site, positions estimated to be far from the average position) are detected and excluded among the points. For achieving aforementioned goal, an excluding algorithm by deciding the outliers among the estimated positions was proposed. By visualizing the estimated location coordinates of the leakage sound on the site drawing within 1 second, we construct and verify a system that can detect the location of the leakage sound in real time and enable immediate response. This study is expected to contribute to improving accident response capabilities and ensuring safety in large plants.

Pickprimer: A Graphic User Interface Program for Primer Design on the Gene Target Region (픽프라이머 : 유전자 목표 구간 탐색 모듈을 포함한 프라이머 제작 그래픽 프로그램)

  • Chung, Hee;Mun, Jeong-Hwan;Lee, Seung-Chan;Yu, Hee-Ju
    • Horticultural Science & Technology
    • /
    • v.29 no.5
    • /
    • pp.461-466
    • /
    • 2011
  • In genetic and molecular breeding studies of plants, researchers need to design various kinds of primers based on their research purposes. So far many kinds of web- or script-based non-commercial programs for primer design are available. Because most of them do not include user interface for multipurpose usage including gene structure prediction and direct target selection on sequences, it has been a laborious work to design primers targeting on the exon or intron regions of interesting genes. Here we report a primer designing graphic user interface program, Pickprimer, that includes gene structure prediction and primer design modules by combining source codes of the Spidey and Primer3 programs. This program provides simple graphic user interface to input sequences and design primers. Genomic sequence and mRNA or coding sequence of genes can be copy and pasted or input as fasta or text files. Based on alignment of the input sequences using the Spidey module, a putative gene structure is graphically visualized along with exon-intron sequences of color codes. Primer design can be easily performed by dragging mouse on the displayed sequences or input primer targeting position with desirable values of primers. The output of designed primers with detailed information is provided by the Primer3 module. PCR evaluation of 24 selected primer sets successfully amplified single amplicons from six Brassica rapa cultivars. The Pickprimer will be a convenient tool for genetic and molecular breeding studies of plants.

A Development of DCS Binding Delay Analysis System based on PC/Ethernet and Realtime Database

  • Gwak, Kwi-Yil;Lee, Sung-Woo;Lim, Yong-Hun;Lee, Beom-Seok;Hyun, Duck-Hwa
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 2005.06a
    • /
    • pp.1571-1576
    • /
    • 2005
  • DCS has many processing components and various communication elements. And its communication delay characteristic is affected diverse operating situation and context. Especially, binding signal which traversed from one control-node to another control-node undergo all sort of delay conditions. So its delay value has large deviation with the lapse of time, and the measurement of delay statistics during long time is very difficult by using general oscilloscope or other normal instruments. This thesis introduces the design and implementation of PC-based BDAS(Binding Delay Analysis System) System developed to overcomes these hardships. The system has signal-generator, IO-card, data-acquisition module, delay-calculation and analyzer module, those are implemented on industrial standard PC/Ethernet hardware and Windows/Linux platforms. This system can detect accurate whole-system-wide delay time including io, control processing and network delay, in the resolution of msec unit, and can analyze each channel's delay-historic data which is maintained by realtime database. So, this system has strong points of open system architecture, for example, user-friendly environment, low cost, high compatibility, simplicity of maintenance and high extension ability. Of all things, the measuring capability of long-time delay-statistics obtained through historic-DB make the system more valuable and useful, which function is essential to analyze accurate delay performance of DCS system. Using this system, the verification of delay performance of DCS for nuclear power plants is succeeded in KNICS(Korea Nuclear Instrumentation & Control System) projects

  • PDF