• Title/Summary/Keyword: Model project

Search Result 4,011, Processing Time 0.033 seconds

A Study of Game Project Curriculum for Integrated Subject (통합교과로서의 게임 프로젝트 교육과정 운영방안 탐구)

  • Choi, Seung-Kwan
    • Journal of Korea Game Society
    • /
    • v.16 no.5
    • /
    • pp.111-122
    • /
    • 2016
  • The purpose of this study is to suggest an curriculum model of teaching scheme which performs team project learning based on Integrated project with different fields. To address this goal, the present study suggests a practical game project model under the same game-making circumstances as game industry by consisting of real case of convergence parts(game graphic, game design, game program). This project-based learning case has been conducting Integrated project education since 2008 in A educational Institute in Korea. The results of study suggest a standard of Integrated-based curriculum model and it is constructed with two parts. The first part is what students learned during project processing, such as responsibility, communication. The other part is how to construct the educational environment for integrated project. It explains how to organize and build teams, plan of integrated project, rule the role of team task, perform collaborative task, present interim/final presentation, evaluate grade. This study is expected to be utilized as a framework for the instructional design and the guideline for improving learner competency in team project learning.

A Study on the Cost Model for Implementation of SE for the Light Rail Transit Project (경량전철 사업의 SE 적용을 위한 비용 추정 모델 연구)

  • Kim, Chul Whan;Han, Myeong-Deok;Lee, Jae Hong;Lee, Chang Young
    • Journal of the Korean Society of Systems Engineering
    • /
    • v.8 no.1
    • /
    • pp.1-7
    • /
    • 2012
  • This research aims to propose a model to estimate the appropriate SE Cost rate to the total project cost when systems engineering applied to light rail transit project. In this research an investment cost estimation model is proposed with reference to COSYSMO (Constructive System Engineering Cost Model). This model includes four input factors such as requirement numbers, interface numbers, algorithm numbers, and scenario numbers. When 2600 requirement numbers are considered on a proposal document with 350 pages in a light rail transit specification of 500 billion~trillion won scale, COSYSMO demo version estimates 42.5 billion won of SE cost (about 5% of total project cost or about 10% of E&M cost).

A New Model on Integration of Feasibility Estimates for Designing FEIT System in R & D Project (R & D 프로잭트의 Feasibility 추정 시스템설계를 위한 추정치 종합화 모형의 구축)

  • 권철신
    • Journal of the Korean Operations Research and Management Science Society
    • /
    • v.15 no.1
    • /
    • pp.47-61
    • /
    • 1990
  • The purpose of this study is to construct a new model named Communication Consensus Value Weighted (CCVW) model based on inter-personal technical communication within a project team, and to design Feasibility Estimates Integrated Terminal System (FEITS) which is a subsystem of R & D Project Planning System/System Alternatives Feasibility Estimation System (RDPPL/SAFES) using the model as a key function for feasibility estimation in that system. This new model aims to integrate technical feasibility estimated by several estimators in the lowest level as the project work breakdown structure which is the indentical conception of a terminal system in RDPPL. The process to obtain the feasibility estimate integrated is presented in this paper.

  • PDF

ESTIMATING COSTS DURING THE INITIAL STAGE OF CONCEPTUAL PLANNING FOR PUBLIC ROAD PROJECTS: CASE-BASED REASONING APPROACH

  • Seokjin Choi;Donghoon Yeo;Seung H. Han
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1183-1188
    • /
    • 2009
  • Estimating project costs during the early stage of conceptual planning is very important when deciding whether to approve the project and allocate an appropriate budget. However, due to greater uncertainties involved in a project, it is challenging to estimate costs during this initial stage within a reasonable tolerance. This paper attempts to develop a cost-estimate model for public road projects under these circumstances and limitations. In the conceptual planning stage of a road project, there is only limited information for cost estimation, for example, such input data as total length of the route, origin and destination, number of lanes, general geographic characteristics of the route, and other basic attributes. This implies that the model should individuate suitable but restricted information without considering detailed features such as quantity of earthwork and a detailed route of a given condition. With these limited facts, this paper applies a case-based reasoning (CBR) method to solve a new problem by deriving similar past problems, which in turn is used to estimate the cost of a given project based on best-fitted previous cases. To develop a CBR cost-estimate model, the authors classified 8 representative variables, including project type, the number of lanes, total length, road design grades, etc. Then, we developed the CBR model, primarily by using 180 actual cases of public road projects, procured over the last decade. With the CBR model, it was found that the degree of error in estimation can be reasonably reduced, to below approximately 30% compared to the final costs estimated upon the completion of detailed design.

  • PDF

A Study on the Effect of R&D Project Management System on R&D Project Performance: Focusing on the Mediating Effects of Integrated Management and Life Cycle Management (R&D 프로젝트관리시스템이 R&D 프로젝트성과에 미치는 영향에 대한 연구: 통합관리 실행 및 전주기관리 실행의 매개효과를 중심으로)

  • Jongho Won;Sungyong Choi;Heekyung Kim;Sohyun Park
    • Journal of Information Technology Services
    • /
    • v.22 no.3
    • /
    • pp.65-83
    • /
    • 2023
  • Due to the development of modern technology and the enlargement of industrial scale, the scale of many projects is expanding and the complexity is also increasing. Individual management of existing projects cannot effectively manage projects in this trend, and it is necessary to systematically manage the entire process from initiation to completion. Accordingly, the need for integrated management and life cycle management that can efficiently manage the entire project is emerging, and for this, a systematic project management system is also required. PMS enables efficient project management by linking business processes such as resource, schedule, scope, and output management of a project with separately separated infrastructure accordingly. In this paper, a research model was proposed to manage the project from the perspective of implementing integrated management and life cycle management, especially during R&D project execution, and to prove the mediating role between PMS and R&D project performance for this purpose. The proposed research model will be able to help companies and organizations that feel the need to implement integrated management and life cycle management and are preparing to build a PMS-type system or that have already been established to efficiently perform project management.

Development of evaluation model on PMIS function using CMM - Focused on Project Communication Management - (CMM개념을 활용한 건설 PMIS 평가 모델 개발 - 프로젝트 의사전달관리를 중심으로 -)

  • Park Jeong-Ha;Shin Kyoo-Chul;Lee Jae-Seob
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.460-463
    • /
    • 2002
  • The construction sector is under growing pressure to increase productivity and improve quality, most notably in reports. A major problem for constriction companies is the lack of project assessing model for project management. One method of solving the problem is through the systematic management of construction processes. A development of model for assessing PMIS practice is attempting to develop a stepwise process assessment framework for the construction industry using Capability Maturity Model. This paper have provided further insights into the understanding of the framework, as well as its value for construction sector.

  • PDF

Understanding Business Model and R&D Project Selection (비즈니스 모델 지식이 연구개발 선택에 미치는 영향 연구)

  • Lee, Jong-Won;Song, Kyeon-Seok
    • The Journal of the Korea Contents Association
    • /
    • v.13 no.6
    • /
    • pp.401-411
    • /
    • 2013
  • Selection of profitable research and development (R&D) projects is one of the major factors affecting sustained growth of firms and countries. This paper analyze what influences the knowledge on the business model exerted on selection of a R&D project. A business model converts the technology value to the customer value, and comprehensively describes the target customers for commercializing a new technology, core values, behaviors within organizations, resources, and external partners. Thus, understanding a business model would make R&D project evaluators place the feasibility and profitability of the business above the merits of the proposed technology in evaluating the technology development. To verify this hypothesis, we had 78 R&D project evaluators acquire the knowledge on the business model and measured how their criteria for R&D project selection have changed using the AHP method. The results shows that feasibility and profitability are more important than the merit of proposed technology, especially capability of company and business development are more important than the levels of technology innovation.

An Evaluation Model of IT PMO Performance Using Pentagon Model (Pentagon Model을 활용한 정보화 프로젝트 PMO의 성과평가 모형 제시)

  • Kim, Ki-Hyun;Park, Geun-Wan;Hwang, Seung-June
    • The Journal of Society for e-Business Studies
    • /
    • v.21 no.4
    • /
    • pp.119-136
    • /
    • 2016
  • Precedent studies revealed that success of IT project strongly depends on the competency of PMO(project management offices), however, there are only few studies which show the importance of PMO competency. In this study, we will suggest an evaluation model of IT PMO competency using the Pentagon Model which is a tool to assess the performance of project organization, and the Analytic Hierarchy Process. We classified effect factor of PMO competency into 25 items in 5 fields such as Structure, Technology, Culture, Interaction, Social Relations and Networks based on pentagon model, also analysis of criticality between the effect factors was conducted by AHP. The study result shows 3 factors of Structure were included in the top 10, while 2 factors of Technology, Culture, Interaction were included separately. In terms of Social Relations and Networks, only 1 factor was included in the top 10. Therefore Structure of PMO should be aggressively considered for the successful IT project.

A Study on the IT Project Selection Considering Budget Constraints (예산제약을 고려한 IT프로젝트 선정 모델 연구)

  • Park, Jaehee;Cho, Nam-Wook;Kim, Wooje
    • The Journal of Society for e-Business Studies
    • /
    • v.18 no.4
    • /
    • pp.327-338
    • /
    • 2013
  • Effective and efficient selection of IT projects is crucial for company's competitiveness. The selection of IT projects usually involves consideration of budget constraints but existing IT project selection models often neglect budget constraints. This paper presents an IT project selection model which considers budget constraints. AHP(Analytic Hierarchy Process) and Knapsack problem model have been combined to develop the proposed model, AHP-K model, where AHP is used to estimate weights of selection criteria and, then, a knapsack problem model is utilized to optimize selection of IT project while meeting the budget constraints. In this paper, a case study is provided to validate the effectiveness of the proposed AHP-K model. It has been shown that the proposed AHP-K model is better than the AHP model in terms of total utility of projects and investment efficiency.

An Exploratory Study on the Project Performance by PMO Capability (PMO 역량에 따른 프로젝트 성과에 관한 연구)

  • Bae, Jae-Kwon;Kim, Jin-Hwa;Kim, Sang-Yeoul
    • Asia pacific journal of information systems
    • /
    • v.18 no.1
    • /
    • pp.53-77
    • /
    • 2008
  • In recent years, although numbers of corporations are bringing in PMO, they seem to be indifferent to PMO performance measurement. This demonstrates that there are also other reasons beside performance measurement of information systems (IS) project being ambiguous by introducing PMO; the lack of acknowledging the concrete function of PMO, and the scarcity of empirical study about the effect of PMO on the project members and project performance. In this sense, this study is aimed at proposing a new research model in which project success factors (i.e., standardization, management advocacy, and staff expertise) affect PMO capability (i.e., knowledge management, resources management, and problem solving competency) positively, leading to project performance (i.e., task outcomes, psychological outcomes, and organizational outcomes) eventually. To empirically test the research model, data are surveyed from PMO department and IS department. To prove the validity of the proposed research model, PLS analysis is applied with valid 132 questionnaires. By employing PLS technique, the measurement reliability and validity of research variables are tested and the path analysis is conducted to do the hypothesis testing. The path analysis results can be organized into 7 ways in large scale. First, standardization of project success factors has a positive association with knowledge management, resources management, and problem solving competency of PMO capabilities. The findings of this result indicate that the multiple or single project management should satisfy standardization in order to operate an effective PMO. Second, management advocacy of project success factors has a positive association with knowledge management, resources management, and problem solving competency. Management advocacy refers to the willingness of management to provide the required resources and authority for project success. There is agreement among researchers regarding the importance of management advocacy for favorable PMO capability. Third, staff expertise of project success factors has a positive association with knowledge management, resources management, and problem solving competency. The findings of this result indicate that the formation of an exceptional consultant or members with a proficient knowledge for staff expertise of project member is the key factor to elevate the PMO capability. Past research suggests that experience and knowledge and the resultant familiarity with the problem faced can be an important determinant of PMO capability. A capable project with appropriate staff expertise means that it enjoys a diversity of abilities and experiences. Fourth, knowledge management competency of PMO capabilities has a positive impact on psychological outcomes but has no direct effect on task outcomes and organizational outcomes. In domestic case of S. Korea, PMO was finally introduced to many other corporations in 2005 though it started bringing in 2000. Therefore, it had neither a significant impact on the task outcomes nor organizational outcomes by lacking the contents and the infrastructure of the knowledge management because the knowledge consolidation and management period of PMO is comparatively shorter by terms than other foreign nations. Fifth, resources management competency of PMO capabilities has a positive association with task outcomes, psychological outcomes, and organizational outcomes. In addition, problem solving competency of PMO capabilities has a positive association with task outcomes, psychological outcomes, and organizational outcomes. Therefore, the findings of this results stress that PMO capabilities has a positive impact on project performance. Sixth, according to the path analysis of the hypothesis, which suggested in this research, problem solving competency is the PMO capability which is the key success factor for task, psychological, and organizational outcomes as an integrated performance model. Further, the analysis reveals that problem solving competency is an important factor for integrated performance model. The finding is in line with past IS research, which affirms that the work of IS projects is essentially a problem solving endeavor. Seventh, in the path analysis of the hypothesis in this research, the path of the management advocacy $\rightarrow$ problem solving competency $\rightarrow$ organizational outcomes appears to be the most important and strongest path. In brief, the finding of this study suggests that project success factors influence PMO capability positively, and project performance as well. From the results, it can be concluded that PMO helped great improve the project success rate and project performance. This study advances research on PMO capability in three important aspects. First, the findings of our study have implications for IS theory and future research. Our study contributes to IS theory by synthesizing concepts from PMO research and project management research with those in IS research. We proposed and tested PMO capability of IS projects and the findings of our investigation provided some preliminary answers to some of the questions raised. Secondly, this thesis does not only help depicting the concept of IT governance but also approaches empirically. It makes a gradual approach to the main content, step by step, in contrary of simple standard, scholastic way of thinking. Finally, we argued that this task-oriented(technical) view is not sufficient to adequately conceptualize IS project performance. Hence, we applied that the research on organization teams, which provides a flip viewpoint to that of project management research in that it gives more weight for psychological outcomes of organizational work groups, can be very helpful in reconceptualizing the IS project performance construct. The limitations of this study are also discussed to provide research directions for future research.