A Study on the Application Instance of KOSHA 18001 to Construction Firms (건설업의 KOSHA 18001 적용사례 연구 - 현장활동 수준분야 중심으로 -)

  • Park, Kyung-Tea;Son, Ki-Sang
    • Journal of the Korean Society of Safety
    • /
    • v.19 no.4 s.68
    • /
    • pp.86-93
    • /
    • 2004
  • Through this study we have reviewed the implementation model, certificate criteria and the formation of KOSHA 18001 Safety and Health Management System and have compared and examined with OHSAS 18001 Certificate. In the course of the 1st questionnaires which have been participated by the concerned Safety and Health Staffs(such as Project Mannager, Site Supervisior, Safety Engineers) of the local construction sites, actual condition of application for KOSHA 18001 has been scrutinized and examined. And as a result, we presented the improved model by digging out the problems. The improved model has been applied for about eight months in local construction sites and the effectiveness has been carefully compared and examined before and after the application of the improvement model through the 2nd questionnaires by the relevant staffs (such as Project Manager, Site Supervisor, Safety Engineer and Project Engineers of the Coordinated Sub-Contractors).

Measuring Performance in Egyptian Construction Firms Applying Quality Management Systems

  • Abd Elhamid, Manal S.;Ghareeb, Sahar.Sh.
    • Journal of Construction Engineering and Project Management
    • /
    • v.1 no.2
    • /
    • pp.18-27
    • /
    • 2011
  • Egyptian construction firms (ECF) started recently to adopt quality management system (QMS) as a way to develop and improve their performance as previous studies have shown. However, considering all the firm's aspects in a competitive way is a crucial process for the ECF's culture. This research is trying to indicate the role of the QMS implementation in measuring performance (MP) through developing a model for measuring performance at the organizational level, and to explore its impact on the organizations that adopt QMS. This model is based on specific elements and their related indicators which have been derived from national approaches and models of MP. This model determines the performance level (PL) of the organization that is measured by means of a point system. Weights of the elements in the point system considered both the elements' importance in the international models and its real practice in the ECFs. This model has been validated using another questionnaire and the majority of surveyed experts agreed that the proposed model can be applied effectively.

Evaluating Schedule Uncertainty in Unit-Based Repetitive Building Projects

  • Okmen, Onder
    • Journal of Construction Engineering and Project Management
    • /
    • v.3 no.2
    • /
    • pp.21-34
    • /
    • 2013
  • Various risk factors affect construction projects. Due to the uncertainties created by risk factors, actual activity durations frequently deviate from the estimated durations in either favorable or adverse direction. For this reason, evaluation of schedule uncertainty is required to make decisions accurately when managing construction projects. In this regard, this paper presents a new computer simulation model - the Repetitive Schedule Risk Analysis Model (RSRAM) - to evaluate unit-based repetitive building project schedules under uncertainty when activity durations and risk factors are correlated. The proposed model utilizes Monte Carlo Simulation and a Critical Path Method based repetitive scheduling procedure. This new procedure concurrently provides the utilization of resources without interruption and the maintenance of network logic through successive units. Furthermore, it enables assigning variable production rates to the activities from one unit to another and any kind of relationship type with or without lag time. Details of the model are described and an example application is presented. The findings show that the model produces realistic results regarding the extent of uncertainty inherent in the schedule.

Preparation of Application Plan for 3-d Noise Prediction Model in Road Noise (도로소음의 3차원 소음예측모델 적용방안 마련)

  • Sun, Hyosung
    • Proceedings of the Korean Society for Noise and Vibration Engineering Conference
    • /
    • 2014.10a
    • /
    • pp.842-843
    • /
    • 2014
  • When the environmental impact assessment (EIA) of an development project is performed, the noise prediction model is used to evaluate the noise impact and prepare the noise reduction measures according to the implementation of an development project. Especially, the application of a 3-d noise prediction model is increased to describe the complex noise environment including high-rise living accommodations. Therefore, this paper suggests the application plan of a 3-d noise predicton model for the road noise impact assessment of a development project.

  • PDF

A Neural Network Model for Building Construction Projects Cost Estimating

  • El-Sawalhi, Nabil Ibrahim;Shehatto, Omar
    • Journal of Construction Engineering and Project Management
    • /
    • v.4 no.4
    • /
    • pp.9-16
    • /
    • 2014
  • The purpose of this paper is to develop a model for forecasting early design construction cost of building projects using Artificial Neural Network (ANN). Eighty questionnaires distributed among construction organizations were utilized to identify significant parameters for the building project costs. 169 case studies of building projects were collected from the construction industry in Gaza Strip. The case studies were used to develop ANN model. Eleven significant parameters were considered as independent input variables affected on "project cost". The neural network model reasonably succeeded in estimating building projects cost without the need for more detailed drawings. The average percentage error of tested dataset for the adapted model was largely acceptable (less than 6%). Sensitivity analysis showed that the area of typical floor and number of floors are the most influential parameters in building cost.

ACCURACY IMPROVEMENT OF AN APPROXIMATE COST ESTIMATING MODEL FOR RIVER FACILITY CONSTRUCTION

  • Siwook Lee;Sungkwon Woo;Jeongyoon Lee;Inwook Choi
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1201-1208
    • /
    • 2009
  • A making a decision of construction cost has important meaning and function for both contractor and owner in construction projects. Especially, it should be premised that estimating the construction cost in efficient and rational way in public construction, which is invested by government funds, for efficient execution of the budget and investment as a side of government. The systematic methodology for estimating construction cost approximately of a river facility construction project has not yet been established because of its unique characteristics including its relatively small project size in terms of cost. On this study, It collect and analyze a river facility construction historical cost data for develop an approximate cost estimating model for river applied by typical embankment section method and rate application of the others activity type. And it verify suitability of model through a that result of application of real river facility construction statement at developed model. By this study, it is expected to reasonable and systematic estimating construction cost through application of developed model.

  • PDF

Ontology-based Facility Maintenance Information Integration Model using IFC-based BIM data

  • Kim, Karam;Yu, Jungho
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.280-283
    • /
    • 2015
  • Many construction projects have used the building information modeling (BIM) extensively considering data interoperability throughout the projects' lifecycles. However, the current approach, which is to collect the data required to support facility maintenance system (FMS) has a significant shortcoming in that there are various individual pieces of information to represent the performance of the facility and the condition of each of the elements of the facility. Since a heterogeneous external database could be used to manage a construction project, all of the conditions related to the building cannot be included in an integrated BIM-based building model for data exchange. In this paper, we proposed an ontology-based facility maintenance information model to integrate multiple, related pieces of information on the construction project using industry foundation classesbased (IFC-based) BIM data. The proposed process will enable the engineers who are responsible for facility management to use a BIM-based model directly in the FMS-based work process without having to do additional data input. The proposed process can help ensure that the management of FMS information is more accurate and reliable.

  • PDF

A Study of the Satisfaction with the operation of design courses-Based on PJBL(Project Based Learning) - An analysis of a University of Applied Sciences in China -

  • WANG LEI;Choi Wonjae
    • Smart Media Journal
    • /
    • v.12 no.5
    • /
    • pp.88-101
    • /
    • 2023
  • As the definition and role of design changes over time with the times and society, design education needs to update teaching methods to match it. The course design in this study began with an optimisation of the learning model based on previous research and analysis, followed by in-depth interviews, the application of the interview results to the final curriculum design, and finally a questionnaire to verify the positive effects of this teaching model. This teaching model has been applied to teach a pilot class in a university of applied sciences in China. The main characteristics of the course design are Project-Based Learning (PJBL) oriented, team cooperation centric, and an educational model developed based on peer assessment. In every stage of the UI design course, realistic project simulations are adopted, enhancing students' abilities through practical experience, teamwork, and peer assessment. The innovation lies in validating the effectiveness and advantages of this model at every stage of the UI design course, innovating existing teaching methods, optimizing learning models, and combining practice with evaluation. This research found that a project-oriented team course design based on PJBL has a high degree of effectiveness and relevance in each stage of the UI design course, significantly improving students' overall competence. It is expected that the results of this study can be applied in various ways to the course design of the courses that similar to design majors.

Decision Support Model for Establishing Plans of Gamyeong Restoration Project (감영 복원사업의 계획수립을 위한 의사결정 지원 모델 구축)

  • Kim, Jong-Hun;Haan, Chan-Hoon;An, Dai-Whan;Cha, Minsu
    • Journal of the Korea Institute of Building Construction
    • /
    • v.23 no.6
    • /
    • pp.851-862
    • /
    • 2023
  • This study introduces an objective and systematic framework for prioritizing buildings in the Gamyoung restoration project using a decision-support model. This model integrates evaluation criteria derived from a comprehensive literature review, refined through the Delphi method, and weights assigned via an Analytic Hierarchy Process(AHP) survey. Each building project is scored against these criteria to ascertain its priority for restoration, thereby facilitating informed decision-making for budget allocation in restoration projects. The effectiveness of the decision-support model was validated through a case study and expert consultations, demonstrating its practical utility in formulating concrete restoration project plans.

Research on a Streamlined Software Project Management Model for Small-sized Software Enterprises (소규모 소프트웨어 업체를 위한 간략화 된 프로젝트 관리 모델에 관한 연구)

  • Lee, Jeong-Eun;Park, Ju-Chull
    • IE interfaces
    • /
    • v.21 no.2
    • /
    • pp.198-208
    • /
    • 2008
  • Effective management of a project is a crucial issue to software companies. There are various international standards, such as CMM, ISO9000, and SPICE, applied to project management. But, small scale companies have some difficulties in accepting those standards because of its complexity and enormous manpower requirements. This study proposes a project management approach streamlining the CMM by which a small scale software company can perform the tasks with ease. A prototype system has also been developed to show the capability of the proposed model.