• Title/Summary/Keyword: Model Embankment

Search Result 245, Processing Time 0.03 seconds

Study on Production of DEM Using Aerial Photo (항공사진을 이용한 DEM 제작에 관한 연구)

  • Park, Chung-Sun;Lee, Gwang-Ryul
    • Journal of The Geomorphological Association of Korea
    • /
    • v.25 no.3
    • /
    • pp.105-120
    • /
    • 2018
  • This study estimates possibility and limitation on production of DEM using aerial photo by comparison of DEMs using aerial photo and digital map. Mountain and urban areas show higher elevation in DEM using aerial photo than in DEM using digital map, due to height of vegetation cover and buildings, respectively. However, artificial affects due to bridge, embankment and road construction are responsible for areas with higher elevation in DEM using digital map than in DEM using aerial photo. This difference in elevation between DEMs seems to be caused by rapid change in real elevation that is not reflected in digital map. There is little difference in elevation between DEMs in plain and area with little or no vegetation cover. This study suggests that problems associated with vegetation cover and error by GCP should be fixed, although DEM using aerial photo can quantitatively and 3-dimensionally reconstruct topography with a high resolution.

Drone Image AI Analysis Model for Ecological Environment Investigation (생태 환경 조사를 위한 드론영상 AI분석 모델)

  • Shin, Kwang-seong;Shin, Seong-yoon
    • Proceedings of the Korean Institute of Information and Commucation Sciences Conference
    • /
    • 2021.05a
    • /
    • pp.355-356
    • /
    • 2021
  • Geological and biological surveys are conducted every year to investigate the state of tidal flat loss and ecological changes in the Saemangeum embankment. In addition, various activities for forest monitoring and large-scale environmental monitoring are being actively carried out throughout Korea. Due to the recent development of drone technology and artificial intelligence technology, various studies are being conducted to perform these activities more efficiently and economically. In this study, we propose an image segmentation technique using semantic segmentation to efficiently investigate and analyze large-scale ecological environments using Drone.

  • PDF

Characteristics of Long-Term Settlement in the Soft Ground of Nakdong River by Numerical Analysis (수치해석에 의한 낙동강 하구 연약지반의 장기침하특성)

  • Park, Choon-Sik;Ryu, Mean-Young
    • Journal of the Korean Geosynthetics Society
    • /
    • v.18 no.3
    • /
    • pp.55-67
    • /
    • 2019
  • Deep soft ground in mouth of Nackdong river requires to be analysed with prediction method concerning characteristics of secondary consolidation from the beginning because it causes excessive settlement due to time-dependant secondary consolidation characteristics. This study investigated characteristics of extended settlement by conducting one-dimensional theory, elasto-plastic model and visco-elasto-plastic model as well as analyzing long-term measuring data observed over 2,000 days. According to one-dimensional theory and elasto-plastic model, there is not definite correlation between height of embankment and depth of soft ground while visco-elasto-plastic model showed similar result of settlement to that of long-term measuring data. Consequently it is suggested that applying visco-elasto-plastic model to developing deep underground place as studied area on predicting extended settlement before construction prevents economic loss and delay during process by preparing secondary consolidation characteristics.

SPH Modeling of Hydraulics and Erosion of HPTRM Levee

  • Li, Lin;Rao, Xin;Amini, Farshad;Tang, Hongwu
    • Journal of Advanced Research in Ocean Engineering
    • /
    • v.1 no.1
    • /
    • pp.1-13
    • /
    • 2015
  • Post-Katrina investigations revealed that most earthen levee damage occurred on the levee crest and landward-side slope as a result of either wave overtopping, storm surge overflow, or a combination of both. In this paper, combined wave overtopping and storm surge overflow of a levee embankment strengthened with high performance turf reinforcement mat (HPTRM) system was studied in a purely Lagrangian and meshless approach, two-dimensional smoothed particle hydrodynamics (SPH) model. After the SPH model is calibrated with full-scale overtopping test results, the overtopping discharge, flow thickness, flow velocity, average overtopping velocity, shear stress, and soil erosion rate are calculated. New equations are developed for average overtopping discharge. The shear stresses on landward-side slope are calculated and the characteristics of soil loss are given. Equations are also provided to estimate soil loss rate. The range of the application of these equations is discussed.

Flood Characteristics at Nakdong Estuary with 1 Dimensional Unsteady Model (1차원 부정류 모형을 활용한 낙동강 하류의 홍수 특성)

  • Lee, Sang-jin;Shin, Hyun-Ho;Kim, Joo-Cheol;Hwang, Man-Ha
    • Journal of Environmental Science International
    • /
    • v.19 no.2
    • /
    • pp.149-155
    • /
    • 2010
  • Rainfalls would increase the discharges or stages of tributary channels in natural watersheds, which in turn augment the magnitude of main stream stages. Rising of water surface elevation in main streams can affect and damage the human activities because of the possibilities of the breakdown or overflow of the embankment. Therefore it is necessary to establish the structural or non-structural alternatives for the sake of prevention or treatment of those disasters. Many mathematical models to analyze the flood flows in natural watercourses have been proposed as the non-structural alternatives so far. In this study one of the such models, FLDWAV developed by NWS(National weather Service), is applied to the downstream reach of Nakdong river. Model calibration is performed on various Manning's roughness coefficients at the gauging stations. The simulation results are compared well with hydrological estimations of flood discharges considering the effects of multipurpose dams upstream of control points.

Hydrodynamic Modeling of Saemangeum Reservoir and Watershed using HSPF and EFDC (HSPF-EFDC를 이용한 새만금호와 유역의 수리 변화 모의)

  • Shin, Yu-Ri;Jung, Ji-Yeon;Choi, Jung-Hoon;Jung, Kwang Wook
    • Journal of Korean Society on Water Environment
    • /
    • v.28 no.3
    • /
    • pp.384-393
    • /
    • 2012
  • Saemangeum lake is an artificial lake created by reclamation works and an estuary embankment since 2006. The sea water flows into the lake by the operation of two sluice gates, and the freshwater enters into the lake by the upper streams. For the reflection of hydrology and hydrodynamics effects in Saemangeum area, a hydrodynamics model was developed by connecting Hydrological Simulation Program with Fortran (HSPF) and Environmental Fluid Dynamic Code (EFDC). The HSPF was applied to simulate the freshwater discharge from the upper steam watershed, and the EFDC was performed to compute water flow, water temperature, and salinity based on time series from 2008 to 2009. The calibration and validation are performed to analyze horizontal and vertical gradients. The horizontal trend of model simulation results is reflected in the trend of observed data tolerably. The vertical trend is conducted an analysis of seasonal comparisons because of the limitation of vertically observed data. Water temperature reflects on the seasonal changes. Salinity has an effect on the near river input spots. The impact area of salinity is depending on the sea water distribution by gate operation, mainly.

Static behavior of a laterally loaded guardrail post in sloping ground by LS-DYNA

  • Woo, Kwang S.;Lee, Dong W.;Yang, Seung H.;Ahn, Jae S.
    • Geomechanics and Engineering
    • /
    • v.15 no.5
    • /
    • pp.1101-1111
    • /
    • 2018
  • This study aims to present accurate soil modeling and validation of a single roadside guardrail post as well as a single concrete pile installed near cut slopes or compacted sloping embankment. The conventional Winkler's elastic spring model and p-y curve approach for horizontal ground cannot directly be applied to sloping ground where ultimate soil resistance is significantly dependent on ground inclination. In this study, both grid-based 3-D FE model and particle-based SPH (smoothed particle hydrodynamics) model available in LS-DYNA have been adopted to predict the static behavior of a laterally loaded guardrail post. The SPH model has potential to eliminate any artificial soil stiffness due to the deterioration of the node-connected Lagrangian soil mesh. For this purpose, this study comprises two parts. Firstly, only 3-D FE modeling has been tested to show the numerical validity for a single concrete pile in sloping ground using Mohr-Coulomb material. However, this material option cannot be implemented for SPH elements. Nevertheless, Mohr-Coulomb model has been used since this material model requires six input soil data that can be obtained from the comparative papers in literatures. Secondly, this work is extended to compute the lateral resistance of a guardrail post located near the slope using the hybrid approach that combines Lagrange FE elements and SPH elements by the suitable node-merging option provided by LS-DYNA. For this analysis, the FHWA soil material developed for application to road-base soils has been used and also allows the application of SPH element.

Stability Analysis of Embankment Overtopping by Initial Fluctuating Water Level (초기 변동수위를 고려한 제방 월류에 따른 안정성 분석)

  • Kim, Jin-Young;Kim, Tae-Heon;Kim, You-Seong;Kim, Jae-Hong
    • Journal of the Korean Geotechnical Society
    • /
    • v.31 no.8
    • /
    • pp.51-62
    • /
    • 2015
  • It is not possible to provide resonable evidence for embankment (or dam) overtopping in geotechnical engineering, and conventional analysis by hydrologic design has not provided the evidence for the overflow. However, hydrologic design analysis using Copula function demonstrates the possibility that dam overflow occurs when estimating rainfall probability with rainfall data for 40 years based on fluctuating water level of a dam. Hydrologic dam risk analysis depends on complex hydrologic analyses in that probabilistic relationship needs to be established to quantify various uncertainties associated with modeling process and inputs. The systematic approaches to uncertainty analysis for hydrologic risk analysis have not been addressed yet. In this paper, the initial level of a dam for stability of a dam is generally determined by normal pool level or limiting the level of the flood, but overflow of probability and instability of a dam depend on the sensitivity analysis of the initial level of a dam. In order to estimate the initial level, Copula function and HEC-5 rainfall-runoff model are used to estimate posterior distributions of the model parameters. For geotechnical engineering, slope stability analysis was performed to investigate the difference between rapid drawdown and overtopping of a dam. As a result, the slope instability in overtopping of a dam was more dangerous than that of rapid drawdown condition.

A Study on the Applicability of Modified Cam-clay Model in Low Plastic Clays (저소성 점토의 수정 Cam-clay 모델 적용성에 관한 연구)

  • Lee, Song;Kim, Tae-Hwoon
    • Journal of the Korean Geotechnical Society
    • /
    • v.19 no.4
    • /
    • pp.247-256
    • /
    • 2003
  • FEM analyses which are based on modified Cam-clay theory have been generally used in such cases as analyses of stability and displacement fur embankment construction on soft clays. However, the Modified Cam Clay Model can generate some problems in anisotropic stress conditions of field because the critical state theory has been developed through many laboratory tests in isotropic conditions. Thus, the applicability on the prediction of undrained shear strength and pore water pressure which was based on the critical state theory was evaluated by triaxial tests and numerical analyses in isotropic and anisotropic conditions. Used samples often come out in domestic area, together with general low plastic clays which are showing dilatant behavior in shearing process. They were evaluated by laboratory tests and FEM based on MCCM. From the results of test and numerical analysis, the predictions of undrained strength in low plastic clays well coincided with each other in both isotropic and anisotropic conditions. However, the generation of porewater pressure was often overestimated during undrained shearing in anisotropic conditions. The results can generate the errors in the prediction of stress path of field sites during loading such as construction of embankment on soft clays because the field is subjected to anisotropic conditions during loading.

Reinforcement and Arching Effect of Geogrid-reinforced and Pile-supported Embankments (지오그리드와 말뚝으로 보강된 성토지반의 보강 및 아칭효과 연구)

  • Oh Young-In;Shin Eun-Chul
    • Journal of the Korean Geotechnical Society
    • /
    • v.21 no.10
    • /
    • pp.5-16
    • /
    • 2005
  • Geosynthetic-reinforced and pile-supported embankments have been increasingly used and researched around the world. The inclusion of one or multiple geosynthetic reinforcements over the pile is intended to enhance the efficiency of load transfer from soft ground to piles, to reduce total and differential settlement and increase global or local stability. In this paper, the reinforcement effectiveness and arching effect of the geogrid-reinforced and pile-supported embankments have been studied in terms of field model tests and numerical analysis with varying the space between piles and reinforcement. 2-dimensional numerical analysis has been conducted using the FLAC (Fast Lagrangian Analysis of Continua) program. And load transfer mechanisms between soil-piles-geogrid were investigated. The mechanisms of load transfer can be considered as a combination of embankment soil arching, tension geogrid, and stress concentration due to the stiffness difference between pile and soft ground. Based on the field model test and numerical analysis results, it was found that the geosynthetic reinforcement slightly interferes with soil arching, and helps reduce differential settlement of the soft ground. Also. at the D/b=3 (D: spacing of pile cap, b: diameter of pile), the total settlement is reduced by about $40\%$ compared to that without reinforcement. For $D/b{\ge}6$, the effectiveness of geogrid reinforcement in reducing settlement is negligible.