• Title/Summary/Keyword: Mission Time

Search Result 737, Processing Time 0.033 seconds

Analysis on the Orbit Prediction Accuracy of the Image Collection Planning for KOMPSAT-2 (아리랑위성 2호 영상촬영계획 궤도예측 정밀도 분석)

  • Jung, Ok-Chul;Kim, Hae-Dong;Chung, Dae-Won
    • Aerospace Engineering and Technology
    • /
    • v.7 no.1
    • /
    • pp.223-228
    • /
    • 2008
  • In order to acquire the images requested by users, it is very important to calculate mission schedule parameters such as imaging execution time and attitude tilt angle accurately. These parameters are based on orbit prediction. This paper describes the accuracy of orbit propagation for image planning. The orbit prediction data from PSS and MAPS has a certain discrepancy due to different orbit propagator. It is necessary for mission planner to confirm this value during mission planning phase. The pointing error which means the difference between target center and real image received is calculated and analyzed using KOMPSAT-2 image data.

  • PDF

Analysis on Figure of Merits of Small SAR Constellation Satellites for Targets Detection (표적탐지를 위한 소형 SAR 군집위성의 성능지수 분석)

  • Song, Sua;Kim, Hongrae;Chang, Young-Keun
    • Journal of the Korean Society for Aeronautical & Space Sciences
    • /
    • v.47 no.2
    • /
    • pp.130-142
    • /
    • 2019
  • For a preemptive strike against a Time Critical Target(TCT), such as Transporter-Erector-Launcher(TEL), the detection capability of capturing launch signals in the Area of Interest(AoI) is important. In this study, the characteristics of the revisit time and the response time of 6~48 small SAR constellation satellites were analyzed. In particular, the revisit time was analyzed for all regions of North Korea and specific regions, and the response time was classified into [Scenario 1] to identify fixed targets and [Scenario 2] to detect and identify moving targets. In particular, the response time analysis for the TCT detection mission operation in [scenario 2] was performed through optimization analysis of observation cumulative coverage for a specific area. Finally, the configuration of constellation satellites for optimal performance of the detection mission was estimated.

Analysis of NWP GRIB Data for LEO Satellite Mission Planning (저궤도 관측위성 임무계획(Mission Planning)을 위한 기상수치예보 GRIB Data 분석)

  • Seo Jeong-Soo;Seo Seok-Bae;Bae Hee-Jin;Kim Eun-Kyou
    • Proceedings of the KSRS Conference
    • /
    • 2006.03a
    • /
    • pp.178-186
    • /
    • 2006
  • 기상 수치예보는 (Numerical Weather Pridiction, NWP)는 바람, 기온, 등과 같은 기상요소의 시간 변화를 나타내는 물리방정식을 컴퓨터로 풀어 미래의 대기 상태를 예상하는 과학적인 방법으로 지구를 상세한 격자 2진부호(GRIdded Binary, 이하 GRIB)로 나누어 그 격자점에서의 값으로 대기 상태를 나타낸다. 지구 각지에서의 각종 관측자료를 기초로 격자점상의 현재값을 구한다. 대용량의 격자데이터는 이진형태이어서 컴퓨터, 서버 저장장치에서 동일형태 데이터로 존재한다. 우리나라 최초의 저궤도 관측 위성인 다목적 실용위성 KOMPSAT-1호(이하, 아리랑 위성1호)는 전자광학카메라(Electro Optical Camera, EOC)를 탑재하여 1999년 12월 21일에 발사된 이후 2006년 1월 현재까지 6여년간 성공적으로 임무를 수행, 7049여회의 영상을 획득하여 국가적으로 귀중한 자료로 활용하고 있다. 아리랑 위성1호는 일일 2-3회 EOC영상을 획득하고 있으며, 임무계획(Mission Planning)은 MP(Mission Planner)가 사용자로부터 자료를 수집하여 임무분석 및 계획 서브시스템(MAPS)에 의해 계산되어진 위성의 제도예측 데이터에 촬영하고자하는 목표지점 좌표를 입력하여 자동명령생성기(KSCG)에 의해 계산된 촬영 경사각도(Tilt)값을 위성에 전송하여 목표지역의 영상을 획득하게 된다. 위성영상 획득에 있어 고가의 위성을 운영하면서 기상의 상태를 정확히 예측하여 실패없이 유효한 영상을 획득하는 것이 무엇보다 중요하다. 본 논문에서는 효율적인 위성임무계획을 위한 기상수치예보 자료를 분석하여 앞으로 발사하게 될 고해상 카메라 탑제위성인 아리랑 위성2호와 3호에 적용하고자 한다. the sufficient excess reactivity to override this poisoning must be inserted, or its concentration is decreased sufficiently when its temporary shutdown is required. As ratter of fact, these have an important influence not only on reactor safety but also on economic aspect in operation. Considering these points in this study, the shutdown process was cptimized using the Pontryagin's maximum principle so that the shutdown mirth[d was improved as to restart the reactor to its fulpower at any time, but the xenon concentration did not excess the constrained allowable value during and after shutdown, at the same time all the control actions were completed within minimum time from beginning of the shutdown.및 12.36%, $101{\sim}200$일의 경우 12.78% 및 12.44%, 201일 이상의 경우 13.17% 및 11.30%로 201일 이상의 유기의 경우에만 대조구와 삭제 구간에 유의적인(p<0.05) 차이를 나타내었다.는 담수(淡水)에서 10%o의 해수(海水)

  • PDF

The Analysis of Mission Profile of the KC-100 UAV (KC-100 무인화 비행체 임무 형상 분석)

  • Lee, Jung-hoon
    • Journal of Aerospace System Engineering
    • /
    • v.14 no.5
    • /
    • pp.49-57
    • /
    • 2020
  • The KC-100 has completed civil type certification with the Ministry of Land, Infrastructure, and Transport, and is currently under development as an unmanned aerial vehicle as part of the Ministry of Land, Infrastructure, and Transport. The Certification Technology of small Unmanned Airplane system (CTsUA system), which is an unmanned KC-100, is being developed to enable the installation of heavy-duty mission equipment and long-time flight missions. This study investigated the process and results of analyzing various parameters such as aircraft weight, airspeed, flight altitude, required horsepower, and fuel consumption at each stage to construct a mission profile based on the operational concept of the CTsUA system. To maintain a maximum take-off weight of 3,600 lbs (1,633 kg), the analysis determined that the weight of the application equipment for the unmanned system should be kept below 80 lbs (36 kg).

Calibration and Validation Activities for Earth Observation Mission Future Evolution for GMES

  • LECOMTE Pascal
    • Proceedings of the KSRS Conference
    • /
    • 2005.10a
    • /
    • pp.237-240
    • /
    • 2005
  • Calibration and Validation are major element of any space borne Earth Observation Mission. These activities are the major objective of the commissioning phases but routine activities shall be maintained during the whole mission in order to maintain the quality of the product delivered to the users or at least to fully characterise the evolution with time of the product quality. With the launch of ERS-l in 1991, the European Space Agency decided to put in place a group dedicated to these activities, along with the daily monitoring of the product quality for anomaly detection and algorithm evolution. These four elements are all strongly linked together. Today this group is fully responsible for the monitoring of two ESA missions, ERS-2 and Envisat, for a total of 12 instruments of various types, preparing itself for the Earth Explorer series of five. other satellites (Cryosat, Goce, SMOS, ADM-Aeolus, Swarm) and at various levels in past and future Third Party Missions such as Landsat, J-ERS, ALOS and KOMPSAT. The Joint proposal by the European Union and the European Space Agency for a 'Global Monitoring for Environment and Security' project (GMES), triggers a review of the scope of these activities in a much wider framework than the handling of single missions with specific tools, methods and activities. Because of the global objective of this proposal, it is necessary to put in place Multi-Mission Calibration and Validation systems and procedures. GMES Calibration and Validation activities will rely on multi source data access, interoperability, long-term data preservation, and definition standards to facilitate the above objectives. The scope of this presentation is to give an overview of the current Calibration and Validation activities at ESA, and the planned evolution in the context of GMES.

  • PDF

Qualification Test of ROCSAT -2 Image Processing System

  • Liu, Cynthia;Lin, Po-Ting;Chen, Hong-Yu;Lee, Yong-Yao;Kao, Ricky;Wu, An-Ming
    • Proceedings of the KSRS Conference
    • /
    • 2003.11a
    • /
    • pp.1197-1199
    • /
    • 2003
  • ROCSAT-2 mission is to daily image over Taiwan and the surrounding area for disaster monitoring, land use, and ocean surveillance during the 5-year mission lifetime. The satellite will be launched in December 2003 into its mission orbit, which is selected as a 14 rev/day repetitive Sun-synchronous orbit descending over (120 deg E, 24 deg N) and 9:45 a.m. over the equator with the minimum eccentricity. National Space Program Office (NSPO) is developing a ROCSAT-2 Image Processing System (IPS), which aims to provide real-time high quality image data for ROCSAT-2 mission. A simulated ROCSAT-2 image, based on Level 1B QuickBird Data, is generated for IPS verification. The test image is comprised of one panchromatic data and four multispectral data. The qualification process consists of four procedures: (a) QuickBird image processing, (b) generation of simulated ROCSAT-2 image in Generic Raw Level Data (GERALD) format, (c) ROCSAT-2 image processing, and (d) geometric error analysis. QuickBird standard photogrammetric parameters of a camera that models the imaging and optical system is used to calculate the latitude and longitude of each line and sample. The backward (inverse model) approach is applied to find the relationship between geodetic coordinate system (latitude, longitude) and image coordinate system (line, sample). The bilinear resampling method is used to generate the test image. Ground control points are used to evaluate the error for data processing. The data processing contains various coordinate system transformations using attitude quaternion and orbit elements. Through the qualification test process, it is verified that the IPS is capable of handling high-resolution image data with the accuracy of Level 2 processing within 500 m.

  • PDF

Implementation of theVerification and Analysis System for the High-Resolution Stereo Camera (고해상도 다기능 스테레오 카메라 지상 검증 및 분석 시스템 구현)

  • Shin, Sang-Youn;Ko, Hyoungho
    • Korean Journal of Remote Sensing
    • /
    • v.35 no.3
    • /
    • pp.471-482
    • /
    • 2019
  • The mission of the high-resolution camera for the lunar exploration is to provide 3D topographic information. It enables us to find the appropriate landing site or to control accurate landing by the short distance stereo image in real-time. In this paper, the ground verification and analysis system using the multi-application stereo camera to develop the high-resolution camera for the lunar exploration are proposed. The mission test items and test plans for the mission requirement are provided and the test results are analyzed by the ground verification and analysis system. For the realistic simulation for the lunar orbiter, the target area that has similar characteristics with the real lunar surface is chosen and the aircraft flight is planned to take image of the area. The DEM is extracted from the stereo image and compose three dimensional results. The high-resolution camera mission requirements for the lunar exploration are verified and the ground data analysis system is developed.

Drone Force Deployment Optimization Algorithm For Efficient Military Drone Operations (효율적 군용 드론 작전 운영을 위한 Drone Force Deployment Optimization 알고리즘)

  • Song, Ju-Young;Jang, Hyeon-Deok;Chung, Jong-Moon
    • Journal of Internet Computing and Services
    • /
    • v.21 no.1
    • /
    • pp.211-219
    • /
    • 2020
  • One of the major advancements of the Fourth Industrial Revolution is the use of Internet of Drones (IoD), which combines the Internet of Things (IoT) and drone technology. IoD technology is especially important for efficiently and economically operating C4ISR operations in actual battlefields supporting various combat situations. The purpose of this study is to solve the problems of limited battery capacity of drones and lack of budgeting criteria for military drone transcription, introduction, and operation. If the mission area is defined and corresponding multi-drone hovering check points and mission completion time limits are set, then an energy and time co-optimized scheduling and operation control scheme is needed. Because such a scheme does not exist, in this paper, a Drone Force Deployment Optimization (DFDO) scheme is proposed to help schedule multi-drone operation scheduling and networked based remote multi-drone control.

Operational Validation of the COMS Satellite Ground Control System during the First Three Months of In-Orbit Test Operations (발사 후 3개월간의 궤도 내 시험을 통한 통신해양기상위성 관제시스템의 운용검증)

  • Lee, Byoung-Sun;Kim, In-Jun;Lee, Soo-Jeon;Hwang, Yoo-La;Jung, Won-Chan;Kim, Jae-Hoon;Kim, Hae-Yeon;Lee, Hoon-Hee;Lee, Sang-Cherl;Cho, Young-Min;Kim, Bang-Yeop
    • Journal of Satellite, Information and Communications
    • /
    • v.6 no.1
    • /
    • pp.37-44
    • /
    • 2011
  • COMS(Chollian) satellite which was launched on June 26, 2010 has three payloads for Ka-band communications, geostationary ocean color imaging and meteorological imaging. In order to make efficient use of the geostationary satellite, a concept of mission operations has been considered from the beginning of the satellite ground control system development. COMS satellite mission operations are classified by daily, weekly, monthly, and seasonal operations. Daily satellite operations include mission planning, command planning and transmission, telemetry processing and analysis, ranging and orbit determination, ephemeris and event prediction, and wheel off-loading set point parameter calculation. As a weekly operation, North-South station keeping maneuver and East-West station keeping maneuver should be performed on Tuesday and Thursday, respectively. Spacecraft oscillator updating parameter should be calculated and uploaded once a month. Eclipse operations should be performed during a vernal equinox and autumnal equinox season. In this paper, operational validations of the major functions in COMS SGCS are presented for the first three month of in-orbit test operations. All of the major functions have been successfully verified and the COMS SGCS will be used for the mission operations of the COMS satellite for 7 years of mission life time and even more.

Research on the Changeover Software for Duplicated Countdown Time Generating Device of the Mission Control System (발사통제시스템의 이중화된 카운트다운 타임 생성 장치간 절체 운용 소프트웨어 설계 연구)

  • Kim, Jeong-Seok;Han, Yoo-Soo
    • Proceedings of the Korean Society of Computer Information Conference
    • /
    • 2016.07a
    • /
    • pp.33-36
    • /
    • 2016
  • 발사통제시스템의 주요 구성장치인 카운트다운 타임 생성 시스템은 카운트다운 신호를 생성하여 타 시스템에 제공하는 임무를 수행한다. 발사 관련 주요 장비들은 카운트다운 타임 생성 장치로부터 수신한 카운트다운 타임 정보에 따라 기능 수행을 하므로 안정적인 카운트다운 타임의 제공이 필수적이다. 따라서 카운트다운 타임 생성 시스템은 신뢰성과 고장 감내성을 보장하기 위한 설계가 요구된다. 이를 위해서는 시스템의 신뢰성을 보장하기 위한 방안으로 구성 장치들을 이중화하고 고장을 실시간 감시하여 고장 발생시 Active 장치에서 Standby 장치로의 절체 운용에 대한 설계가 필요하다. 본 논문에서는 카운트다운 타임 생성 장치의 이중화 설계에 따른 실시간 고장 감지 및 절체 운용 방법과 기능 시험 결과에 대하여 기술하였다.

  • PDF