• Title/Summary/Keyword: Minimum cost

Search Result 1,398, Processing Time 0.03 seconds

Estimation of Food Cost for Low Income Families Using Food Consumption Data of the 2001 Korean National Health and Nutrition Survey (2001 국민건강.영양조사 자료를 이용한 빈곤층 가구의 식료품비 추정)

  • Noh, Min-Young;Shim, Jae-Eun;Joung, Hyo-Jee;Lee, In-Hee;Ryu, Jeoung-Soon;Paik, Hee-Young
    • Journal of the Korean Home Economics Association
    • /
    • v.44 no.8
    • /
    • pp.79-87
    • /
    • 2006
  • The purpose of this study was to estimate the minimum monthly food cost for the low income population. The food consumption data of 9,311 individuals from the 2001 Korean National Health and Nutrition Survey was used. The monthly food cost was calculated using the Consumer Food Price Database for the year 2001 provided by the Public Health Nutrition Laboratory, Seoul National University. The low income population (n = 1,310) was characterized as older age, lower income, smaller family size, lower education level, and lower energy intake as compared with the total population (n = 8,001). The estimated food cost showed that men in the low income population needed 15% more money for purchasing food to maintain the energy intake level at the average energy intake level of men in the total population. It was also estimated that women in the low income population needed 9% more money for purchasing food to maintain the energy intake level at the average energy intake level of women in the total population. There were differences in monthly food costs depending on the sex and age, and family size. The results of this study could be used as basic information to establish minimum food cost for the low income population in Korea.

An empirical study on the economies of scale of hospital service in korea (우리나라 병원의 규모의 경제에 관한 연구)

  • 전기홍;조우현;김양균
    • Health Policy and Management
    • /
    • v.4 no.1
    • /
    • pp.107-122
    • /
    • 1994
  • Many alternatives have been discussed to reduce the medical expenditure and to use the medical resources effectively. Many studies about the economies of scale have been done for the last several decades. This study has analyzed the relationship between the number of beds and the mean expense per hospitalization day in Korea. A Cost Function Model was identified and we wanted to see the minimum optimal size with the cheapest mean expense per hospitalization day. The result is as follows; 1. In the Cost Function Mode, (the number of beds)$^{2}$, the number of personnel, productivity and training institutions are the factors that statisticaly influence the mean expenses. 2. By the univariate analysis the mean expense proved to be the smallest as the level of 150-200bed, The breaked down of the components of expenses shows that the mean labor cost is much different from the mean value of material and administration costs, and that hospital with 150-200 beds also have the minimal expense. The mean expense goes up dramatically in hospitals of 450 beds or more. 3. When the other conditions are constant, according to the multiple regression analysis of the mean expense per adjusted hospitalization day the minimum optimal size with the cheapest expense is a hospital with 191 beds and the hospital with 230 beds takes the lowest mean labor cost. The material or administration costs are not influenced by hospital size. This research has limitation in measuring the variables that influence hospital xpenses, in estimating hospital output by the number of beds in considering outpatient cost and in securing representativeness of hospitals because many hospitals made no responses to the research questionnare. But it is valuable and helpful for development of health policy to figure out the number of beds with the cheapest expense per hospitalization day.

  • PDF

A Study on the Maintenance Policy Considering the Failure Data of the EMU Braking System and the Cost Function (전동차 제동장치의 고장데이터와 비용함수를 고려한 유지보수 정책에 관한 연구)

  • Han, Jae-Hyun;Kim, Jong-Woon;Koo, Jeong-Seo
    • Journal of the Korean Society of Safety
    • /
    • v.30 no.3
    • /
    • pp.13-19
    • /
    • 2015
  • Railway vehicle equipment goes back again to the state just before when failure by the repair. In repairable system, we are interested in the failure interval. As such, a statistical model of the point process, NHPP power law is often used for the reliability analysis of a repairable system. In order to derive a quantitative reliability value of repairable system, we analyze the failure data of the air brake system of the train line 7. The quantitative value is the failure intensity function that was modified, converted into a cost-rate function. Finally we studied the optimal number and optimal interval in which the costs to a minimum consumption point as cost-rate function. The minimum cost point was 194,613 (won/day) during the total life cycle of the braking system, then the optimal interval were 2,251days and the number of optimal preventive maintenance were 7 times. Additionally, we were compared to the cost of a currently fixed interval(4Y) and the optimum interval then the optimal interval is 3,853(won/day) consuming smaller. In addition, judging from the total life, "fixed interval" is smaller than 1,157 days as "optimal interval".

Minimum Network Connection Cost Algorithm for Partially Survivable Networks Problem of Cellular Telecommunication Systems

  • Lee, Sang-Un
    • Journal of the Korea Society of Computer and Information
    • /
    • v.21 no.1
    • /
    • pp.59-64
    • /
    • 2016
  • This paper suggests heuristic algorithm with O(mn) polynomial time complexity using Excel for partially survivable networks optimization problem of cellular telecommunication systems with m cells and n hubs. This problem only can be get the solution using linear programming or LINGO software package. The proposed algorithm connects the cell to hubs in ring network with minimum cost as the connection diversity of each cell. If the traffic of ring network (T) is T>2K for ring capacity (K), we adjust the maximum cost hub to MTSO that has a ascending order of (D/DC)/${\Delta}^+$ cell with each cell traffic demand (D) and ${\Delta}^+$=(MTSO cost-maximum cost hub) than we get the $T{\leq}2K$. Finally, we adjust MTSO to the removed maximum cost hub for the cell with 2K-$T{\geq}$(D/DC) and $_{max}{\Delta}^-$. While we using like this simple method, the proposed algorithm can be get the same optimal solution for experimental data as linear programing and LINGO software package.

Estimating Minimum Efficient Scale of Korean Mobile Telecom Market: Relation between Cost per Minute and Traffic Volume (국내이동통신서비스 시장에서의 최소효율규모 추정: 분당원가와 통화량 간 관계분석을 중심으로)

  • Choi, Sae-Sol;Han, Sung-Soo
    • The Journal of Korean Institute of Communications and Information Sciences
    • /
    • v.38C no.10
    • /
    • pp.867-873
    • /
    • 2013
  • Competition policy for growth and activation of market should consider structural nature of relevant industry closely. In this viewpoint, whether domestic MNOs(mobile network operators) are competing while securing the effect of scale economies and maximum production efficiency is an important element when looking for competition policy means of domestic mobile communication market. With this, present study analyzed level of MES (Minimum Efficient Scale) and whether achieving them or not through investigating the relation between the cost per minute and call traffic of domestic MNOs. This analysis is differentiated from existing econometric studies entailing several assumptions by enhancing a reality reflection through directly deducing of cost curve using verified data(cost per minute and call traffic). As a result of analysis, the levels of minimum efficient scale were different from each other between domestic MNOs, and an incumbent MNO(SKT) accomplished minimum efficient scale while entrant MNOs(KT and LGU+) could not yet reach minimum efficient scale level. This result demonstrates a gap exists in production efficiency level among domestic MNOs and implies that the policy to alleviate the gap among operators is required when establishing competitive policy in the future.

Estimation of the Minimum Cost of Living in Seoul (서울시 지역최저생계비 계측에 관한 연구)

  • Kim, Kyung-Hye
    • Korean Journal of Social Welfare
    • /
    • v.38
    • /
    • pp.7-32
    • /
    • 1999
  • Providing the income support program for people under the poverty level has been regarded as the basic obligational role of modern government. The target population of this program should include all the poor who are unable to maintain the minimum health and decency level with their own income. The minimum living cost, however, varies within a country because there are regional differences in consumer price and the mode of living. The current program does not count for the regional differences, leaving a significant portion of Seoul's poor needy people being ineligible for this public care. Recognizing these regional differences, this paper attempts to estimate the minimum living cost in Seoul area, comparing it to the national one. It employs the data and method that the Korea Institute of Health and Social Affairs adopted in its 1994 study, since it has been served as a basis of the current public assistance program. The minimum cost of living in Seoul is estimated to be \887,611 per month for a 4-person household. It is 1.33 times greater than the national monthly minimum of \666,684. Based upon the '94 urban household expenditure survey data, some 5.9 percent of Seoul's population, 636,132 people, are found to be under the Seoul's minimum living level. This number is 5.2 times greater than those 123,304 people who are eligible for the current public assistance program in Seoul.

  • PDF

Efficient Connection of Migration Routes with Their Weights Using EGOSST (EGOSST를 이용한 이동 경로의 가중치를 반영한 효과적 연결)

  • Kim, In-Bum
    • The KIPS Transactions:PartA
    • /
    • v.18A no.5
    • /
    • pp.215-224
    • /
    • 2011
  • In this paper, a mechanism connecting all weighted migration routes with minimum cost with EGOSST is proposed. Weighted migration routes may be converted to weighted input edges considered as not only traces but also traffics or trip frequencies of moving object on communication lines, roads or railroads. Proposed mechanism can be used in more wide and practical area than mechanisms considering only moving object traces. In our experiments, edge number, maximum weight for input edges, and detail level for grid are used as input parameters. The mechanism made connection cost decrease average 1.07% and 0.43% comparing with the method using weight minimum spanning tree and weight steiner minimum tree respectively. When grid detail level is 0.1 and 0.001, while each execution time for a connecting solution increases average 97.02% and 2843.87% comparing with the method using weight minimum spanning tree, connecting cost decreases 0.86% and 1.13% respectively. This shows that by adjusting grid detail level, proposed mechanism might be well applied to the applications where designer must grant priority to reducing connecting cost or shortening execution time as well as that it can provide good solutions of connecting migration routes with weights.

A Proposal of Heuristic Using Zigzag Steiner Point Locating Strategy for GOSST Problem (GOSST 문제 해결을 위한 지그재그 스타이너 포인트 배치 방법을 이용한 휴리스틱의 제안)

  • Kim, In-Bum;Kim, Chae-Kak
    • The KIPS Transactions:PartA
    • /
    • v.14A no.5
    • /
    • pp.317-326
    • /
    • 2007
  • We propose more enhanced heuristic for the GOSST(Grade of Services Steiner Minimum Tree) problem in this paper. GOSST problem is a variation of Steiner Tree problem and to find a network topology satisfying the G-Condition with minimum network construction cost. GOSST problem is known as one of NP-Hard or NP-Complete problems. In previous our research, we proposed a heuristic employing Direct Steiner Point Locating strategy with Distance Preferring MST building strategy. In this paper, we propose new Steiner point locating strategy, Zigzag Steiner point Locating strategy. Through the results of out experiments, we can assert this strategy is better than our previous works. The Distance Zigzag GOSST method which hires the Distance Preferring MST building strategy and Zigzag Steiner point Locating strategy defrays the least network construction cost and brings 31.5% cost saving by comparison to G-MST, the experimental control and 2.2% enhancement by comparison to the Distance Direct GOSST method, the best GOSST method in our previous research.

Seismic design of steel frames using multi-objective optimization

  • Kaveh, A.;Shojaei, I.;Gholipour, Y.;Rahami, H.
    • Structural Engineering and Mechanics
    • /
    • v.45 no.2
    • /
    • pp.211-232
    • /
    • 2013
  • In this study a multi-objective optimization problem is solved. The objectives used here include simultaneous minimum construction cost in term of sections weight, minimum structural damage using a damage index, and minimum non-structural damage in term of inter-story drift under the applied ground motions. A high-speed and low-error neural network is trained and employed in the process of optimization to estimate the results of non-linear time history analysis. This approach can be utilized for all steel or concrete frame structures. In this study, the optimal design of a planar eccentric braced steel frame is performed with great detail, using the presented multi-objective algorithm with a discrete population and then a moment resisting frame is solved as a supplementary example.

Delay-dependent Guaranteed Cost Control for Uncertain Time-delay Systems (불확실 시간지연 시스템에 대한 지연량을 고려한 성능보장 제어)

  • 이영삼;문영수;권욱현
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 2000.10a
    • /
    • pp.13-13
    • /
    • 2000
  • This paper considers delay-dependent guaranteed cost control for uncertain time-delay systems with norm-bounded parametric uncertainties. A new delay-dependent condition for the existence of the guaranteed cost control law is presented in terms of linear matrix inequalities (LMI). An algorithm involving convex optimization is proposed to design a controller which guarantees the suboptimal minimum of the guaranteed cost of the closed-loop system for all admissible uncertainties.

  • PDF