• Title/Summary/Keyword: Mid-term schedule

Search Result 9, Processing Time 0.03 seconds

Productivity Upgrading Case for Mid-Term and Long-Term Nuclear R & D (원자력 중장기 연구개발 사업 생산성 향상 사례)

  • 정관성;한도희;장원표;이용범;권영민
    • Proceedings of the Korea Technology Innovation Society Conference
    • /
    • 2001.05a
    • /
    • pp.547-553
    • /
    • 2001
  • A ideal Methodology is a technology that efficiently utilize outputs of research and development (R&D). "Liquid Metal Reactor Design. Technology Development" is under development in Korea Atomic Energy Research Institute (KAERI) as on of the Mid-Term and Long-Term Nuclear R&D by MOST. To upgrade the productivity of the R&D during long period, system type project have been accomplished within plant period through schedule management by phase, outputs auditing, sharing and constructing database.

  • PDF

Job Assignment Simulation of Ship Hull Production Design in Consideration of Mid-Term Schedule (중일정계획을 고려한 선체 생산설계 작업할당 시뮬레이션)

  • Son, Myeong-Jo;Kim, Tae-Wan
    • Journal of the Society of Naval Architects of Korea
    • /
    • v.50 no.5
    • /
    • pp.334-342
    • /
    • 2013
  • In this paper, we analyze the procedure of the design manager for the enhancement of the hull production design process by use of the simulation method. Normally, design manager assigns design jobs according to various methods and estimates the corresponding results. When the construction drawing which is the output of the detail design where a design is dealt by zones, the design manager identifies blocks and analyzes their work difficulties, and assigns jobs to design engineers who are different in capabilities. These processes including the design engineer who can be modeled with man-hours evaluation model are represented in detail as a simulation model. As the high-level modeling for the discrete-event system, we use Event Graph model. And we implemented the simulation using Simkit which is open simulation engine for the discrete-event system. We made the simulation scenario to be written by a user in the scenario generator which is separated from the simulation model, and made the simulation result to be visualized in the form of Gantt chart in a Web. In the scenario of the irregular issuance for various construction drawings which contain different numbers of blocks, we performed the Monte-Carlo simulation according to various assignment methods to find the assignment result that satisfies the mid-term schedule.

Design and Prototype Implementation of the Curved Plates Flow Tracking and Monitoring System using RFID (RFID 기술을 이용한 곡가공 부재 추적 및 모니터링 시스템 설계 및 프로토타입의 구현)

  • Noh, Jac-Kyou;Shin, Jong-Gye
    • Korean Journal of Computational Design and Engineering
    • /
    • v.14 no.6
    • /
    • pp.424-433
    • /
    • 2009
  • In order to improve productivity and efficiency of ship production process, production technology converged with Information Technology can be considered. Mid-term scheduling based on long-term schedule of ship building and execution planning based on short-term production schedule have an important role in ship production processes and techniques. However, data used in the scheduling are from the experiences of the past, cognitive, and often inaccurate, moreover the updates of the data by formatted documents are not being performed efficiently. This paper designs the tracking and monitoring system for the curved plates forming process with shop level. At first step to it, we redefine and analyze the curved plates forming process by using SysML. From the definition and analysis of the curved plates forming process, we design the system with respect to operational view considering operational environment and interactions between systems included and scenario about operation, and with respect to system view considering functionalities and interfaces of the system. In order to study the feasibility of the system designed, a prototype of the system has been implemented with 13.56 MHz RHD hardware and application software.

Design and Development of Scenario-Based Simulation System to Improve Shipbuilding Execution Scheduling Assessment -A Case Study on Panel Line- (시나리오 기반 조선 실행계획 평가 향상을 위한 시뮬레이션 시스템 개발 -패널라인 개발 사례를 중심으로-)

  • Back, Myunggi;Kim, Youngmin;Hwang, Inhyuck;Lee, Kwang-Kook;Ryu, Cheolho;Shin, Jong Gye
    • Korean Journal of Computational Design and Engineering
    • /
    • v.18 no.3
    • /
    • pp.211-223
    • /
    • 2013
  • Today's ever-increasingly competitive shipbuilding market makes it essential for a shipbuilding company to have more efficient production processes and higher productivity as well as better design ability to obtain its competitiveness. A well-established production execution schedule plays an indispensable role to achieve this goal. Most shipbuilding companies carry out an evaluation on their mid-term plan once it is established. However, no evaluation activity exists for a production execution schedule, because practically all the companies depend on the field workers for the production execution scheduling. In this study, a prototype of a ship production execution schedule evaluation system is developed based on the component based design (CBD) methodology. This system enables one to make a production execution schedule that reflects up-to-date shipyard situation and to validate whether the schedule is feasible or not by running a production simulation according to the schedule. Users can also make use of the system as a decision supporting tool that compares several different execution schedules and evaluates which one is the best execution schedule.

The Short-Term Effects of Soft Pellets on Lipogenesis and Insulin Sensitivity in Rats

  • Bae, Cho-Rong;Hasegawa, Kazuya;Akieda-Asai, Sayaka;Kawasaki, Yurie;Cha, Youn-Soo;Date, Yukari
    • Preventive Nutrition and Food Science
    • /
    • v.19 no.3
    • /
    • pp.164-169
    • /
    • 2014
  • The purpose of the present study was to investigate the short-term effects of a 12-day, soft pellet (SP) diet with a 3-h restricted feeding schedule on caloric intake, body weight, lipid metabolism, and insulin sensitivity. Glucose and insulin levels were measured pre-, mid-, and post-feeding. The SP rats exhibited postprandial hyperglycemia compared to rats fed control pellets (CP). The insulin response of SP rats during a meal was significantly higher than that of CP rats. There were no significant differences in the hepatic triacylglycerol contents and lipogenesis gene mRNA levels of SP and CP rats. However, the hepatocytes of SP rats were slightly hypertrophic. In addition, histological analysis revealed that the pancreases of SP rats had more islet areas than those of CP rats. This study demonstrated that feeding an SP-only diet for 12 days induces glucose intolerance, suggesting that the consumption of absorbable food, like a soft diet, may trigger glucose metabolism insufficiency and lead to life-threatening diseases.

Risk-based Operational Planning and Scheduling Model for an Emergency Medical Center (응급의료센터를 위한 위험기반 운영계획 모델)

  • Lee, Mi Lim;Lee, Jinpyo;Park, Minjae
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.42 no.2
    • /
    • pp.9-17
    • /
    • 2019
  • In order to deal with high uncertainty and variability in emergency medical centers, many researchers have developed various models for their operational planning and scheduling. However, most of the models just provide static plans without any risk measures as their results, and thus the users often lose the opportunity to analyze how much risk the patients have, whether the plan is still implementable or how the plan should be changed when an unexpected event happens. In this study, we construct a simulation model combined with a risk-based planning and scheduling module designed by Simio LLC. In addition to static schedules, it provides possibility of treatment delay for each patient as a risk measure, and updates the schedule to avoid the risk when it is needed. By using the simulation model, the users can experiment various scenarios in operations quickly, and also can make a decision not based on their past experience or intuition but based on scientific estimation of risks even in urgent situations. An example of such an operational decision making process is demonstrated for a real mid-size emergency medical center located in Seoul, Republic of Korea. The model is designed for temporal short-term planning especially, but it can be expanded for long-term planning also with some appropriate adjustments.

Imaging follow-up strategy after endovascular treatment of Intracranial aneurysms: A literature review and guideline recommendations

  • Yong-Hwan Cho;Jaehyung Choi;Chae-Wook Huh;Chang Hyeun Kim;Chul Hoon Chang;Soon Chan KWON;Young Woo Kim;Seung Hun Sheen;Sukh Que Park;Jun Kyeung Ko;Sung-kon Ha;Hae Woong Jeong;Hyen Seung Kang;Clinical Practice Guideline Committee of the Korean Neuroendovascular Society
    • Journal of Cerebrovascular and Endovascular Neurosurgery
    • /
    • v.26 no.1
    • /
    • pp.1-10
    • /
    • 2024
  • Objective: Endovascular coil embolization is the primary treatment modality for intracranial aneurysms. However, its long-term durability remains of concern, with a considerable proportion of cases requiring aneurysm reopening and retreatment. Therefore, establishing optimal follow-up imaging protocols is necessary to ensure a durable occlusion. This study aimed to develop guidelines for follow-up imaging strategies after endovascular treatment of intracranial aneurysms. Methods: A committee comprising members of the Korean Neuroendovascular Society and other relevant societies was formed. A literature review and analyses of the major published guidelines were conducted to gather evidence. A panel of 40 experts convened to achieve a consensus on the recommendations using the modified Delphi method. Results: The panel members reached the following consensus: 1. Schedule the initial follow-up imaging within 3-6 months of treatment. 2. Noninvasive imaging modalities, such as three-dimensional time-of-flight magnetic resonance angiography (MRA) or contrast-enhanced MRA, are alternatives to digital subtraction angiography (DSA) during the first follow-up. 3. Schedule mid-term follow-up imaging at 1, 2, 4, and 6 years after the initial treatment. 4. If noninvasive imaging reveals unstable changes in the treated aneurysms, DSA should be considered. 5. Consider late-term follow-up imaging every 3-5 years for lifelong monitoring of patients with unstable changes or at high risk of recurrence. Conclusions: The guidelines aim to provide physicians with the information to make informed decisions and provide patients with high-quality care. However, owing to a lack of specific recommendations and scientific data, these guidelines are based on expert consensus and should be considered in conjunction with individual patient characteristics and circumstances.

An Empirical Study about Assessment of the JIT System: on korean semi-production firm

  • Lee, Eung-Kweon
    • International Commerce and Information Review
    • /
    • v.7 no.2
    • /
    • pp.75-94
    • /
    • 2005
  • This study is focused on evaluating the computer-integrated just-in-time (CI-JIT) production system of a semi-conductor manufacturing firm in Korea. Approaching the mid-1980s, the emphasis was on low price, low-cost operations, and quality, especially in USA. American companies have shifted output to low-wage countries like the Philippines, Korea, Japan, Malaysia and allied countries that can make quality products at low prices. Korea and other Asian countries forego short-term profits to gain a solid foothold in a product market, recognizing that larger market share leads to lower cost and higher profit in the long run. They bring manufacturers and suppliers together to improve material management and operation management, using project teams that investigate topics, such as Just-In-Time(JIT)manufacturing, among others. The "Kanban" word means "card" in Japanese, and is used to indicate the desired final delivery schedule. The operation for a particular item produced is scheduled for a specific time. The same process is extended to the external suppliers. More recently, the cards are gradually being replaced by electronic procedures that follow the same concept. Its capacity must be capable of handling the various transactions required by the JIT coverage as well as some allowances for expanded applications.

  • PDF

Improvement of Efficacy by Applying Intuitive Learning and Group Investigation Methods on Engineering Education (공학교육에 있어 직관 연상과 집단학습을 통한 효능감 향상 사례 연구)

  • Ma, Jeong Beom;Kim, Jong Hyun
    • Transactions of the KSME C: Technology and Education
    • /
    • v.2 no.1
    • /
    • pp.15-20
    • /
    • 2014
  • Intuitive learning method was applied at the beginning of each lecture to induce students to draw their interests. Avoiding simple explanation of equations and problem solving by using them, we repeated theoretical concepts verbally and applied physical meanings when we developed and wrote equations. By these methods we expected to find a way to increase students' learning effects. We also took a group investigation on pursuing term projects. Students choose their own subjects individually and submitted reports according to the time schedule. The reports included the contents that they learned during classes. After choosing best reports for each group by instructor, students at each group divided roles and prepared presentations. Thorough these methods they increased their scores from mid-term to final exams, and got aquatinted with responsibilities among group and organizations. They also experienced physical meanings from the usual daily life phenomena which could be connected to the engineering concepts and improved abilities as junior engineers.