The Korean government has operated various mega-development projects in order to help nation progress into the future. However, many problems and concerns have been raised on the mega-projects' delay and failure in South Korea. Moreover, there are many technical and executive problems; such as trial and error of development work, failure of validity test, complicated decision-making processes, and so on. With these concerns and problems to mega-development projects, finding a sustainable development from mega-projects is becoming a new issue in the field of mega-development projects. Therefore, the main purpose of this study is to investigate whether or not most mega-development projects conducted by the government exactly corresponds with sustainable development (such as environmental soundness, economic efficiency and social equity) focusing on Saemangeum project. Using causal loop analysis, this study gives some significant results to us. First, for environmental soundness, both central and local government should ensure water-purity control system for farming, industry, leisure, and others. Second, for economic efficiency, both governments not only have to secure a budget for completion of infrastructure of the Saemangeum project but also support financial assistance to Saemangeum project. Third, for social equity, three local governments (i.e., Gunsan, Gimje, and Buan) should stop debate and conflict with regard to an administrative district of Saemangeum region. Finally, most politicians should not use Saemangeum project for political means. Rather, they should recognize the project as a motive power for economic development of Jeollabukdo.
In recent years, interests and studies on the urban regeneration projects have been increased and largely conducted. It is a part of the effort that solves some social and economical problems occurred by deteriorated buildings and degraded infrastructures through new urban regeneration projects or redevelopment projects. However, the urban regeneration projects show the characteristics that can not guarantee in the project performance because the projects have various and complex stakeholders related to these projects and are exposed to lots of risks due to its huge scale. This study proposed the risk performance index method to improve the efficiency of the overall performance measurement for a mega-project by extending from the traditional cost/schedule based performance measurement system. The risk performance index method proposed in this study has a similar system to the EVMS, and makes possible to perform a three dimensional integrated performance measurement in cost/schedule/risk through 18 different indexes that compose the risk performance index.
Mega-Y project is very important for a company to gain a competitive advantage in markets or to achieve drastic change in the internal processes. It stems from the company strategy and annual management goals or key performance measures, and is proceeded by the cross-functional team. This paper presents the success factors and implementation process of the Mega-Y projects. The implementation process is presented in 5 steps, including project selection, cross-functional team building, establishment of the master plan, development and execution of sub-projects, and project completion. A case study on the cost reduction project of aircraft development is presented to help for the practitioners to deploy the implementation process introduced in this paper.
Journal of Korean Society of Industrial and Systems Engineering
/
v.22
no.50
/
pp.243-255
/
1999
A mega project such as an international airport construction generally consists of a number of sub-projects. Successful completion of this mega project requires project management information system(PMIS) because control and link of a number of component sub-projects is inevitable. Therefore, the role of PMIS should be more emphasized as the project is processed and managed by fast track concept where the design and construction work is performed concurrently. This study investigates and analyzes the present PMIS developed for the construction project of Inchon International airport. Based on this study, we can suggest the direction of PMIS for a mega project management and how to improve this kind of management information system.
Proceedings of the Korean Institute Of Construction Engineering and Management
/
2008.11a
/
pp.716-719
/
2008
Yongsan International business Center, Incheon Songdo City, Roppongihill sand Midtown, including the most of latest internal and external construction projects become larger and more complicated than before. Mega project is one of most complicated project type as public and private sectors involve and the space will be construed in all directions i.e. horizontal, vertical, underground and ground. Therefore mega projects need a new program management information system to start the project's success. So this paper proposes a platform design study to intelligent program management information systems to mange mega projects.
KSCE Journal of Civil and Environmental Engineering Research
/
v.37
no.2
/
pp.419-425
/
2017
Managing mega construction project is a very challenging task due to its large scale and complexity. To deal with the challenge, progress measurement must be estimated reliably and effectively. Many researchers have presented progress measurement methods, but previous studies are limited to single or several types of facilities. Thus, they have difficulties to being applied to mega construction projects that covers multiple facilities. To overcome the limitations, this paper proposes a progress measurement framework considering characteristics of mega construction projects. The framework consists of four phases : development of Work Breakdown Structure, determination of weights of main facilities and sub facilities, and calculation of the integrated progress rate. To validate the proposed approach, a case study of Sejong city in Korea was performed. The results of the case study showed the applicability of the proposed framework and confirmed that it enables to reliably measure progress rate of mega construction projects.
With the booming of construction and property industries in China, the demand for high-rises and mega-scale buildings with more integrated building functions, open- and tailor-shaped outlooks, better connections to municipal infrastructures, and higher grades of building importance has been increasing in the past two decades. The seismic design and engineering of such modern mega-buildings face engineering challenges such as hazard mitigation of extreme actions and surroundings, integrated structural frameworks and building skins, complex connections, and overall construction efficiency. It is the work of a new generation of civil and structural engineers to enhance engineering efficiency and achieve overall engineering, environmental, and economical effectiveness for these high-rise projects. This paper elaborates the above topics through case studies on the design and construction of four such developments in China. Some rethinking is conducted on evolution in modern seismic engineering and design through innovation to achieve an acceptable level of overall sustainability and building effectiveness.
Ha, Seung-Ryong;Hyun, Chang-Taek;Son, Myung-Jin;Kim, Yun-Sik
Korean Journal of Construction Engineering and Management
/
v.12
no.4
/
pp.29-39
/
2011
In Korea, many mixed-used development projects(MXD) in mega project size are currently active. As these mega projects require long-term construction and execution and involve by different subjects in different fields, their completion breeds various problems, such as conflicts among project participants due to their complicated interest relationships and inaccuracy in predicting the economic performance of the projects due to inappropriate facility capacity planning. To solve these problems, it is essential to apply value engineering (VE) at the planning phase of the project, which can result in the best possible cost reduction and improvement of project performance. However, not many projects are actually implementing VE because of the lack of available information, as well as the limitations due to uncertainty in the early period of project execution. Therefore, this study aimed at proposing VE Team Building, Quality Model Performance Indexes, Space Model so as to resolve common mega project problems and overcome VE application limitations at planning stage. The result of this study is expected that the data can be utilized as basic data to apply VE at the planning phase of the large complex projects.
Kim, Young-jae;Kim, Tae-kyoung;Jo, Duk-sang;Lee, Hwang-ku
Korean Journal of Construction Engineering and Management
/
v.16
no.3
/
pp.165-176
/
2015
Recently many Korean large-sized construction companies as well as specialty contractors have been expanding their business in the overseas market to mitigate impacts from long-term stagnation in the domestic market. Such as a result, it has been arisen as a major issue that contractors effectively manage the delays which have been commonly faced with in international mega-projects. Therefore it can be said that the ability of the delays management leads a success of project. This paper presents a review of literature for delay analysis methods such as time impact analysis(TIA) and raises practical problems to rationally substantiate the duration of extension of time(EoT) in international mega projects which have wide scope of works as well as complicated and detailed contract baseline programs by taking theoretical approaches. We suggest the two improvement concepts to substantiate the EoT claims which are effectively applicable to practical projects. The first is to sort out dominant delays among numerous delays in advance of applying a delay analysis. The second is to set up the delay sections with the advanced concept for analysing delays' effects by TIA. This study performed a case study on an actual international mega-project. to confirm the effectiveness of improvement concepts that this practical approach is applicable for the assessment of EoT. In conclusion, this paper supposes to provide practitioner in charge for an EoT claim with an advanced substantiation methodogy when they not only analyse the construction delays by using TIA, but also negotiate with stakeholders about with the assessment of EoT.
Kim, Sung-Ho;Hong, Seung-Hyeun;Hong, Sa-Myun;Choi, Yong-Kyu
Proceedings of the Korean Geotechical Society Conference
/
2007.09a
/
pp.55-77
/
2007
Currently a large number of high rise building projects are under plan and a mega foundation system to support this high load with safety is requiring. The foundation of a highrise building is displaced by the building load, which influence the behavior of a super structure in reverse. In this aspect, the structural interaction analysis between a foundation and a super structure is necessary. In this study, the relationship of a superstructure of building and a foundation has been reviewed, considering the tendency of design from a capacity driven design to a performance design. Two different case studies have been introduced to help understand this relationship in more specific, the first case is the high rise building founded on a mat system on rock and the second is that on large diameter bored piles on soft ground condition.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.