• Title/Summary/Keyword: Mega ship

Search Result 32, Processing Time 0.03 seconds

A Study on Change the Container Terminal Yard Occupations by Handling System (장비제원에 따른 컨테이너 터미널 장치장 점유율 변화에 관한 연구)

  • Song Yong-Seok;Park Jeong-Jae;Nam Ki-Chan;Kwak Kyu-Seok;An Ki-Myung
    • Proceedings of the Korean Institute of Navigation and Port Research Conference
    • /
    • 2004.11a
    • /
    • pp.303-307
    • /
    • 2004
  • The scale of ship's cargo transport is getting larger, more economics of scale are gained the speed is higher and the size of quay fundling equipment in container terminal is larger. The productivity cf the quay qffects occupation for limited scale of yard. This paper aims to calculate the yard occupation by handling systems, such as OHBC, RMGC, RTTC, etc, and lay-out.

  • PDF

On the Hydraulic Characteristics of Efficient Long Wave Energy Absorber-Eco-breaker 2 (장파 제어체 Eco-breaker 2의 수리특성)

  • Cho, Yong Jun;Kim, Ho Min
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.28 no.5B
    • /
    • pp.547-558
    • /
    • 2008
  • With the advent of super cargo ship due to the explosive increase in the amount of cargo shipped via seas, some mega ports are under construction in South Korea, to accommodate the super cargo ship, and some of them already enter their final phase. To sustain the harbor tranquility, mega ports usually comprise huge vertical type breakwaters which are intrinsically vulnerable to the attack of long waves. In this rationale, we present the chamber type breakwater with a circular curtain wall - Eco-breaker 2, to alleviate the reflection of long waves and numerically investigate the hydraulic characteristics of Eco-breaker 2. As a wave driver, we use the Navier-Stokes eq., the most robust wave driver, using SPH (Smoothed Particle Hydrodynamics) and LES (Large Eddy Simulation). For the verification of numerical results, we also carried out hydraulic model test. It is shown that Eco-breaker 2 can effectively alleviate the reflection of long waves with its inherited large organized eddies encompassing the water chamber and some region off the curtain wall of varying size. It is also shown that the scope and strength of large organized eddies strongly depends on the incident wave period, and the reflection coefficient can be lowered to 0.18 by tuning the size of water chamber such that resident time at the chamber is just short of the half period of incident waves. Based on these results, we present the specification of Eco-breaker 2 to boost its use on the development of water environment friendly harbor worldwide.

A Study on Under Keel Clearance of Gadeok Channel for the Safety Passage of Mega Container Ship (초대형 컨테이너선의 가덕수로 안전운항을 위한 선저여유수심 연구)

  • Ryu, Won;Kong, Suk-Young;Lee, Yun-Sok
    • Journal of the Korean Society of Marine Environment & Safety
    • /
    • v.27 no.6
    • /
    • pp.789-797
    • /
    • 2021
  • The worldwide sizes of container ships are rapidly increasing. The container ship size in 2005, which was about 9,200 TEU has increased to 24,000 TEU in recent times. In addition to the increase in the sizes of the container ships, the arrivals/departures of large container vessels to/from Korea have also increased. Hence, the necessity for reviewing safe passage of such vessels is emphasized. In the present study, a 24,000 TEU container vessel was used as a model ship to calculate the under-keel clearance (UKC) at Gadeok Channel through which vessels must pass to arrive at Busan New Port, in accordance with the Korean Port and Fishing Port Design Standards and Commentary. In addition, the maximum allowable speed that meets UKC standards was calculated using various squat formulas, whose results were then compared with the current speed limit standards. The analysis results show that Busan New Port requires 10% marginal water depth, and the squat that meets this requirement is 0.95 m. Gadeok Channel requires 15% marginal water depth, and the squat that meets this requirement is 1.78 m; in this case, the maximum allowable speed is calculated as 15 kts. Busan New Port has set the speed limit as 12 kts, which is higher than the calculated 11 kts. Thus, speed limit reconsideration is required in terms of safety. However, the set speed limit for Gadeok Channel is 12 kts, which is lower than the calculated 15 kts. Thus, additional considerations may be provided to increase the speed limits for smooth navigational passage of vessels. The present study, however, is constrained by the fact that it reflects only a limited number of elements in the UKC and allowable speed calculations; therefore, more accurate UKC and safe speed values can be suggested based on extended studies to this research.

A Study on RFID Based Biz-Model for QoS Guarantee for Container Terminals (RFID를 활용한 컨테이너터미널의 QoS 보장을 위한 비즈니스 모델 연구)

  • Park Doo-Jin;Park Jin-Hee;Kim Hyun;Nam Ki-Chan
    • Journal of Navigation and Port Research
    • /
    • v.30 no.3 s.109
    • /
    • pp.211-217
    • /
    • 2006
  • In recent years, the pileup of world ports is deepening as time goes by due to China effect and continuous increase of world trade volume. The shipping companies try to reduce their shipping cost by using mega vessels in the ports. Shipping companies consider most of the ships turnaround time as a critical factor when selecting a calling port for reducing cost. This paper will suggest how we can guarantee terminal QoS like ship waiting time ratio and ship residing time applying RFID(Radio Frequence IDentification) technology, raising up rapidly as a fundamental solution of new growing industry to port information system. Also, lead time of whole port logistics can be decreased for reduction of loading & discharging time and result from productivity improvement of Twin-lift G/C(Gantry Crane} as applying RFID technology to terminal operation. The purpose of this paper suggests that the new business model of U-Port which port QoS can be guaranteed using RFID based RTLS technology.

Influence Factors for the Safety Assessment on the GPE Blocks during On-shore Transportation (GPE 블록의 연안운송시 안전성 평가를 위한 영향인자)

  • Kim, Sung-Chang;Hong, Ki-Sup;Shin, Dae-Kyun;Yu, Byeong-Seok;Kim, Kwan-Hong;Suh, Yong-Seok;Paeck, Se-Jin
    • Journal of the Society of Naval Architects of Korea
    • /
    • v.46 no.6
    • /
    • pp.595-602
    • /
    • 2009
  • Great number of ships has been built by Korean Shipyards since early of 2,000 due to the expanding worldwide trade. Most of shipyards have enlarged the weight of erection block and many blocks have been assembled in block fabrication factories outside the shipyards to reduce the shipbuilding period. Especially, Giga blocks that exceed 2,000 tons are often assembled by the block fabrication factories outside the shipyard. Generally, the blocks are transported to building dock in shipyard by towing barges. Accident can be occurred during the sea transportation and it may bring about not only the delay of delivery but also a disaster on the ocean environments. Transportation condition of GPE (Grand Pre-Erection) block differs from the ocean going conditions of marine vessels. Special consideration should be included before transportation work in order to guarantee the safety of GPE blocks and barge carriers. In this paper, several examples, which have been investigated to set up the safety standard of transportation of the GPE blocks on coastal routes, are introduced. For the barge transportation on coastal sea route, the design criteria are discussed, considering the design wave, the acceleration induced by wave, structural strength, and the fixture condition of blocks.

A Study on Future Container Cranes (차세대 컨테이너크레인에 대한 고찰)

  • Jung Hyun-Soo;Lee Suk-Jae;Hong Keum-Shik
    • Journal of Navigation and Port Research
    • /
    • v.29 no.3 s.99
    • /
    • pp.291-298
    • /
    • 2005
  • In this article. the specifications of a future container crane for a 18,000 TEU megaship are investigated After studying the transitions of containerships through the past half century, the characteristics of the past and current container cranes are outlined. together with various research trends throughout the world Upon these results, the size and performance of the container crane that will be used beyond the year 2014 are forecast. Specifically, the structure, trolley and hoist mechanism, control method, outreach. backreach, rail gage, loading capacity, stability, durability, and others are summarized.

A Study on Logistics Integration and Logistics Performance of Shipping Firms in International Logistics (국제물류에서 해운기업의 물류통합과 물류성과에 관한 연구)

  • Yun, Kwang-Woon;Ha, Myung-Shin;Bae, Hee-Sung
    • THE INTERNATIONAL COMMERCE & LAW REVIEW
    • /
    • v.26
    • /
    • pp.143-172
    • /
    • 2005
  • The biggest exchange of international environment of shipping logistics in 21 century should appear ultra-mega container ships on the shipping market. The competitive trend of large size container ship was based on economics of scale among the international shipping business. In the environment, shipping firms consider the integration of freight forwarder and shipper in the international logistics process. The aims of this research analyse a relation between the environment uncertainty and logistics information system(LIS) and the integration and resolve the integration and its impact on logistics performance. The research methodology of this research analyse structural equation modeling on the relation of variables. The results of research are as follows. First, Environmental uncertainty significantly influences the internal integration and the external integration. Second, LIS has an influence on the logistics integration by providing the foundation for LIS utilization in international logistics process. Third, the internal integration significantly influences a logistics performance, which implies that firms should promote interaction and collaboration through internal process integration to achieve logistics performance as the logistical cost and service. But the external integration is not significantly a logistics performance.

  • PDF

An Economical Efficiency Comparison for Extend Method of Container Terminal Yard Scale followed by the Call of the Mega Ship (초대형 컨테이너선박의 기항에 따른 컨테이너 터미널 장치장 규모 확대방안의 경제성 비교)

  • Song, Yong-Seok
    • Journal of Navigation and Port Research
    • /
    • v.33 no.5
    • /
    • pp.353-359
    • /
    • 2009
  • Most domestic container terminals are lack of container storage capacity compared to the throughput of container. The main reason is the difference between the theoretical capacity applied to the development of terminals and the real capacity of a berth Another reason seems to be the increase of the container crane in number per berth to match the need for the getting larger vessel, which is resulted from the increase of the berth capacity from the start. This study, therefore, aims to suggest the economic size of container yard by comparing the existing one. For this the berth capacity was recalculated, the required yard size derived considering up to 10,000TEU vessel and then cost comparison done.

Development of Octagonal Ring Load Cell Based on Strain Rings (스트레인 링 이론 기반의 팔각링 로드셀 개발)

  • Kim, Joong-Seon;Jo, Hyeong-Geun;Wang, Duck-Hyun
    • Journal of the Korean Society of Manufacturing Process Engineers
    • /
    • v.17 no.4
    • /
    • pp.97-103
    • /
    • 2018
  • Force is a crucial element to be measured in various industries, especially the machine tool industry. Mega units of force are required in fields such as the heavy and ship industries. Micro/nano units of force are required for microparticles. The detection of force generates a physical transformation due to the force imposed from the outside, atlrnd electrical voltage signals are obtained from the system. For the detection of force, an octagonal ring load cell based on circular ring theory is designed and produced. To design the octagonal strain ring, theoretical values with data from the ANSYS program are compared to determine the size of the octagonal strain ring. An octagonal strain ring of the chosen size is made with the SCM415 material. The strain gauges are attached to the octagonal strain ring, designed to construct a full Wheatstone bridge. The LabVIEW program is used to measure the data, and strain values are found. With the octagonal ring load cell completed in this way, experiments are conducted by imposing forces on the tangential axis and radial axis. Experiments are performed to verify if the octagonal ring load cell conducts measurements properly, and theoretical values are analyzed to find any differences. The data will later be used in further research to develop a machine-tool dynamometer.

Cooperative control system of the floating cranes for the dual lifting

  • Nam, Mihee;Kim, Jinbeom;Lee, Jaechang;Kim, Daekyung;Lee, Donghyuk;Lee, Jangmyung
    • International Journal of Naval Architecture and Ocean Engineering
    • /
    • v.10 no.1
    • /
    • pp.95-102
    • /
    • 2018
  • This paper proposes a dual lifting and its cooperative control system with two different kinds of floating cranes. The Mega-erection and Giga-erection in the ship building are used to handle heavier and wider blocks and modules as ships and off-shore platforms are enlarged. However, there is no equipment to handle such Tera-blocks. In order to overcome the limit on performance of existing floating cranes, the dual lifting is proposed in this research. In the dual lifting, two floating cranes are well-coordinated to add up the lift capabilities of both cranes without any loss such that virtually a single crane is lifting, maneuvering and unloading. Two main constraints for the dual lifting are as follows: First, two barges of floating cranes should be constrained as a rigid body not to cause a relative motion between two barges and main hooks of the two cranes should be controlled as main hooks of a single crane. In order words, it is necessary to develop the cooperative control of two floating cranes in order to sustain a center of gravity of the module and minimize the tilting angle during the lifting and unloading by the two floating cranes. Two floating cranes are handled as a master-slave system. The master crane is able to gather information about all working conditions and make a decision to control the individual hook speed, which communicates the slave crane by TCP/IP. The developed control system has been embedded in the real floating crane systems and the dual lifting has been demonstrated five times at SHI shipyard in 2015. The moving angles of the lifting module are analyzed and verified to be suitable for hoisting control. It is verified that the dual lifting can be applied for many heavier and wider blocks and modules to shorten the construction time of ships and off-shore platforms.