Modern High-Power TBM with Advanced Procurement System (오늘날의 고성능 TBM과 선진 장비조달 방안)

  • Jee, Warren W.
    • Tunnel and Underground Space
    • /
    • v.23 no.3
    • /
    • pp.161-168
    • /
    • 2013
  • Recently, the application of High-Power mechanized tunnelling technology has been expended around the world. Especially, High-power Modern TBM machines are used in a successful results. Essential for the great success of this modern TBM in difficult rock conditions are based on the development of machine power, suitable better cutter developments, and also developed assesment technology regards on the extensive site investigations. OPP (Owner Procurement Process) system is a proven alternative contract delivery method that is potentially applicable to many tunnel projects. Using the OPP, the owner specifies and procures the TBMs and tunnel lining in advance of the tunnel contract procurement and provides TBM to a tunnel contractor with a goals of reducing project risks and accelerating project schedule. Depending on the blasting vibrations and noises, mechanized tunnelling will be more important particularly in city areas.

Early Traffic Opening-Capable Continuous Multi-Layer Asphalt Pavement Maintenance Method Using Electric Arc Furnace Slag Aggregate and Emulsified Asphalt (전기로슬래그 혼합골재를 이용한 조기교통개방이 가능한 연속 적층식 상온 아스팔트포장 유지보수 공법)

  • Kim, Wan-Sang;Lee, Suck-Hong;Kwon, Mun-Hyun;Choi, Do-Sun
    • 한국방재학회:학술대회논문집
    • /
    • 2007.02a
    • /
    • pp.117-120
    • /
    • 2007
  • The main purpose of this paper is to introduce the early traffic opening-capable continuous multi-layer asphalt pavement maintenance method using electric arc furnace slag aggregate and emulsified asphalt to the actual construction sites. As well known, the previous surface treatment method of emulsified asphalt mixture have various shortcomings such as long work-time, traffic congestions, plastic deformation and poor evenness. Thus, the proposed method has enabled tile early traffic opening by utilizing the optimized emulsified asphalt after consideration of the climate and road conditions in Korea. The application of the electric furnace slag with $6\;{\sim}\;18\;mm$ thickness is helpful to become a environment-friendly construction method. And also, it has been improved enough to accommodate night-time works of mechanized construction activities for wearing course and control course.

  • PDF

Studies on the Design of Forest Road Network for Mechanized Yarding Operations (II) - Optimal road spacing and density - (기계화(機械化) 집재작업(集材作業)을 위한 노망정비(路網整備)에 관(關)한 연구(硏究)(II) - 적정임도간격(適正林道間隔) 및 임도밀도(林道密度) -)

  • Cha, Du Song;Cho, Koo Hyun
    • Journal of Korean Society of Forest Science
    • /
    • v.83 no.3
    • /
    • pp.299-310
    • /
    • 1994
  • This study was carried out to examine the optimal road spacing and road density to minimize the total harvesting cost(road construction cost plus yarding cost) for mechanized yarding system to roadside by one - and two-stage two-way in Forestry build-up region. Chunchon-kun, Kangwon-do. The estimated road construction costs were ranged from ten million won to sixty million won per km. The results have indicated that cable crane was appropriate for yarding machine by one-stage, two-way, and estimated optimal road spacing was 1,698m~4,192m, averaged 3,087m, and road density was 3.44m/ha~8.44m/ha, and averaged 5. 12m/ha. In hilly terrain, combination of medium yarder and Logging bogie was suited to yarding machine by two-stage, two-way, and calculated optimal road spacing was 1,483m~3,481m, averaged 2,589m, and road density was 4.05m/ha~9.46m/ha, averaged 5.90m/ha. In steep terrain, combination of medium yarder and jinsung winch was suited, and estimated optimal road spacing was 1,693m~3,982m, averaged 2,960m, and road density was 3.68m/ha~8.64m/ha, averaged 5.38m/ha.

  • PDF

Development of a Parallel-Typed Walking Robot for Breakwater Construction

  • Park, Kun-Woo;Kim, Tae-Sung;Park, Sung-Min;Lee, Min-Ki
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 2002.10a
    • /
    • pp.81.1-81
    • /
    • 2002
  • $\textbullet$ This paper presents a study on the development of a walking robot for an armor-stone work of the breakwater construction. The armor-stone work is putting stones about 0.3 ∼ 2m3 on the surface of the breakwater to prevent it from waving. $\textbullet$ This work has been done manually, and its process plan is uncertain by effects of the weather, wave and tide of sea. Therefore the constructional cost is considered to be wasteful $\textbullet$ Working in underwater as well as on land for human workers causes the accident and caisson disease, so it is necessary to replace the process to be mechanized. $\textbullet$ The basic requirements of the robot for mechanizing are as follows : 1) To have a large...

  • PDF

An Experimental Study for Establishment of On-Site Quality Control of Repair Material by the mechanized construction (기계화시공에 의한 보수재료의 현장품질관리확립을 위한 실험적 연구)

  • Cho Bong Suk;Jang Jae Bong;Kim Yong Ro;Kang Suk Pyo;Hong Sung Yun;Kim Moo Han
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2004.05a
    • /
    • pp.160-163
    • /
    • 2004
  • In domestic, various repair materials and method systems to keep up with these reinforced concrete deteriorated due to salt damage, carbonation, chemical decay et. developed and applied. However, on-site quality control of various repair materials and method systems isn't achieved desirably because it is depend completely on a men of experience' opinions above all else regardless of various on-site environments. In this background, mock up test with due regard to real on-site environments was performed to secure fundamental data for establishment of desirable on-site quality control. Mock up test using repair mortar analyzed from angles of construction methods, mechanical spraying pressures, W/M. Construction methods were designed manpower method and spraying method, spraying pressures were designed 32, 42, 52 psi, W/M were designed 14.4, 15.4, $16.4\%$. And compressive strength, Chloride ion diffusion coefficient, bond strength, SEM. of mock up test specimens were evaluated. In conclusion, we confirmed excellency of mechanical spraying pressures, fined extremely excellency of condition of spraying pressure 42 ps, W/M $14.4\%$ within this study. therefore the results of this study will be useful to provide fundamental data for establishment of desirable on-site quality control.

  • PDF

EPB tunneling in cohesionless soils: A study on Tabriz Metro settlements

  • Rezaei, Amir H.;Shirzehhagh, Mojtaba;Golpasand, Mohammad R. Baghban
    • Geomechanics and Engineering
    • /
    • v.19 no.2
    • /
    • pp.153-165
    • /
    • 2019
  • A case study of monitoring and analysis of surface settlement induced by tunneling of Tabriz metro line 2 (TML2) is presented in this paper. The TML2 single tunnel has been excavated using earth pressure balanced TBM with a cutting-wheel diameter of 9.49 m since 2015. Presented measurements of surface settlements, were collected during the construction of western part of the project (between west depot and S02 station) where the tunnel was being excavated in sand and silt, below the water table and at an average axis depth of about 16 m. Settlement readings were back-analyzed using Gaussian formula, both in longitudinal and transversal directions, in order to estimate volume loss and settlement trough width factor. In addition to settlements, face support and tail grouting pressures were monitored, providing a comprehensive description of the EPB performance. Using the gap model, volume loss prediction was carried out. Also, COB empirical method for determination of the face pressure was employed in order to compare with field monitored data. Likewise, FE simulation was used in various sections employing the code Simulia ABAQUS, to investigate the efficiency of numerical modelling for the estimating of the tunneling induced-surface settlements under such a geotechnical condition. In this regard, the main aspects of a mechanized excavation were simulated. For the studied sections, numerical simulation is not capable of reproducing the high values of in-situ-measured surface settlements, applying Mohr-Coulomb constitutive law for soil. Based on results, for the mentioned case study, the range of estimated volume loss mostly varies from 0.2% to 0.7%, having an average value of 0.45%.

Development of Vertical Excavation with Reinforcing Wire for Mechanized Construction (지선공사 기계화를 위한 수직시공용 지선근가 개발)

  • Song, H.S.;Mun, M.S.;Kim, J.S.;Park, Y.B.;Kwon, S.W.;Shin, D.H.;Park, D.H.;Kang, M.H.
    • Proceedings of the KIEE Conference
    • /
    • 2006.05a
    • /
    • pp.8-11
    • /
    • 2006
  • 기존의 인력굴착을 통한 지선근가 매설시공 방법을 오거크레인에 의한 기계화시공을 하기 위하여 오거크레인 굴착공에 적합한 수직시공용 원형 지선근가를 개발을 하고 개발된 원형가를 오거크레인을 이용한 기계화시공에 적용함으로써 공사시간 및 비용 절감과 시공품질의 향상을 이루려 한다.

  • PDF

STATUS OF WELDING FOR POWER PLANT FACILITIES

  • Hur, Sung-do
    • Proceedings of the KWS Conference
    • /
    • 2002.10a
    • /
    • pp.342-348
    • /
    • 2002
  • The welding technology for production of power plant facility as for other industries has been progressing forward automation and mechanization for cost reduction and shortening of cycle time. The welding for boiler tube is automated or mechanized as the parts and subassemblies of tubes are conveyed automatically in the shop. The temperature of boiler stearn is being progressively increased for higher plant efficiency. The welding of nuclear component is characterized by heavy thickness and narrow gap Submerged Arc Welding. Narrow gap Gas Metal Arc Welding and Electron Beam Welding is applied to turbine diaphragm. To improve the resistance of solid particle erosion of turbine blade and nozzle partition, HVOF spray technology and boriding process has been applied.

  • PDF

Analysis of RBM한s Penetration Capacity for Upward reaming of Shaft (수직구의 상향굴착을 위한 RBM 굴진성능의 분석)

  • 이석원;조만섭;서경원;배규진
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2002.03a
    • /
    • pp.157-164
    • /
    • 2002
  • Based on the results of prototype air-shaft construction, penetration capacity of RBM(Raise Boring Machine) was analyzed and compared with TBM(Tunnel Boring Machine) performance in this study. Utilization, down time, net penetration rate and advance rate were evaluated and compared. By conducting the laboratory tests for rock properties with the analysis of penetration capacity, relation of penetration capacity and geotechnical parameters was studied. The results showed that much more higher value of utilization, however lower value of net penetration rate for RBM was obtained compared to those of TBM. In addition, as the strength of rock penetrated increased, higher value of net penetration rate was obtained contrarily to the results of TBM performance. Finally, new relationship between total hardness and net penetration rate for weak and weathered rock was derived from these results.

  • PDF

Analysis and Assessment of Tunnel Boring Machine Performance in Hard Rock (경암반에서 TBM 굴진 해석 및 평가)

  • 배규진;이용수;홍성완;박홍조
    • Tunnel and Underground Space
    • /
    • v.4 no.2
    • /
    • pp.144-155
    • /
    • 1994
  • This research is designed to assess current achievement levels for mechanized excavation systems in Korea adn suggest the model predictive of TBM performance using statistical approaches. A test section in the TBM construction sites is selected to measure and analyze TBM performance. The field records including operating data, time allocation into downtime catagories, and machine design are analyzed on a shift basis. There are a total of 240 shifts, with most days operating two shifts per day. Examples of the probability density functions produced from the test section are presented and discussed. Relationships between TBM penetration rate and rock physical properties are investigated and the empirical equations for TBM performance prediction are also assessed with the field data.