• 제목/요약/키워드: Mean Time Between Failure

검색결과 254건 처리시간 0.027초

Control & Communication 상에서의 PLC 고장허용 통신 시스템 구현 (Implementation of PLC Fault Tolerance Communication System in Control & Communication Link)

  • 임완택;김응석;양해원
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2002년도 하계학술대회 논문집 D
    • /
    • pp.2298-2300
    • /
    • 2002
  • In this paper, we introduced a fault tolerant control system with the aim of achieving higher degree of reliability for a PLC control system in the field network. The system reliability was evaluated by MTBF(Mean Time Between Failure). The design of the fault tolerant system through CC-Link of Mitsubisi's MELSEC network was presented. In addition, the PLC data is transmitted from the field network's PC to the host PC by TCP/IP Window socket.

  • PDF

Train Ethernet Backbone(TEB) 구성에 따른 신뢰도 분석 (Reliability Analysis of Train Ethernet Backbone)

  • 김준교;박재현;오용국;황현철
    • 전기학회논문지
    • /
    • 제62권3호
    • /
    • pp.414-416
    • /
    • 2013
  • As the usage of the electric power train increases, the importance of the control network between the electric control devices grows. IEC proposed a revision of IEC-61375, a standard of the networking among electric devices within a train, to adopt Ethernet as a backbone of train network. This paper performed the reliability analysis of three configurations of Ethernet-based networking within a electric power train that are recommended in IEC-61375 standard. The analysis results show that MTTF(mean time to failure) of the redundant configuration is 20,086 hours, which is a about 3 times longer than the linear configuration.

제어봉 제어 시스템의 전력함 PCB 카드에 대한 신뢰성 예측 (THE RELIABILITY PREDICTION OF PCB CARDS OF POWER CABINET OF CONTROL ROD CONTROL SYSTEM)

  • 정해원;서중석;육심균;남정한
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2003년도 하계학술대회 논문집 D
    • /
    • pp.2028-2030
    • /
    • 2003
  • This paper describes the results of reliability prediction analysis of control rod control system, which is being developed as part of KNICS project. The results of reliability prediction indicate MTBF(Mean Time Between Failure) of cards for control rod control system. A purpose of reliability prediction is to evaluate MTBF of cards, identify the design drawbacks of cards, and propose design improvement to a designer to help design the more reliable control rod control system. This reliability prediction analysis used the the part count and part stress method in the basis of MIL-HDBK-217F.

  • PDF

항공기 개발단계에서의 신뢰도 예측 정확도 향상에 관한 사례연구 (Case Study on Improvement of Reliability Prediction Accuracy in Development Phase for Aircraft)

  • 김영일;변광식;김한태
    • 한국항공운항학회지
    • /
    • 제17권4호
    • /
    • pp.25-31
    • /
    • 2009
  • In development phase of the Aircraft Systems, the reliability prediction of electronic equipments are usually performed using MIL-HDBK-217. The reliability of fielded electronic systems, however, used to be underestimated with MIL-HDBK-217. To solve this problem, some alternatives are suggested and Telcordia SR-332 is among them. In this case study, the reliability of ESU which controls gas turbine engine is predicted using Telcordia SR-332 along with the development test data. The predicted reliabilities of ESU using Telcordia SR-332 and MIL-HDBK-217 are also compared. As a result this case study showed that the predicted reliability using Telcordia SR-332 was better close to field(operation) reliability than MIL-HDBK-217.

  • PDF

소프트웨어에 대한 종합군수지원(ILS) 적용 방안 (Software ILS Proposed)

  • 심행근;김인중;고재영
    • 한국군사과학기술학회지
    • /
    • 제2권2호
    • /
    • pp.173-185
    • /
    • 1999
  • 고품질의 소프트웨어를 개발하는 사업의 중요성이 나날이 증대되고 있는 시점에서 소프트웨어를 종합군수지원 관점에서 해석하려고 하는 연구가 최근에 진행되고 있다. 즉, 소프트웨어 설계자의 입장은 소프트웨어 개발도 중요한 문제이지만 소프트웨어를 얼마나 가용성 있게 유지하는가에 더 많은 관심을 갖게 된다. 하드웨어는 개발 시부터 종합군수지원이라는 기법을 적용하여 체계 배치 시 체계 장비가 최상의 가용도를 가질 수 있도록 하는 노력이 이루어지고 있으며, 그 결과도 현실화되고 있다. 본 논문에서는 하드웨어에서만 적용하고 있는 종합군수지원 개발 기법을 소프트웨어에 적용하여 소프트웨어에 대한 종합군수지원 적용방안을 제시하고, 향후 소프트웨어 개발/배치 시에 경제적이고 가용도가 높은 소프트웨어의 개발/활용이 가능하도록 군수지원 분석을 통한 종합군수지원 활용 방안을 제안한다.

  • PDF

Reliability: A Neglected Topic in the Power Electronics Curricula

  • Calleja, Hugo;Chan, Freddy
    • Journal of Power Electronics
    • /
    • 제10권6호
    • /
    • pp.660-666
    • /
    • 2010
  • This paper presents the approach followed to develop a course that introduces reliability into the design of power electronics converters. The course is part of the curriculum of a master of science in electrical engineering program, and it is aimed at providing reliability tools that can be used in a straightforward manner, while avoiding the mathematical intricacies. The reliability calculations are performed according to the Military Handbook 217, using the evaluation version of a commercial software package which greatly reduces the computational burden usually associated with this task. The course assessment shows that, after attending the course, students were able to improve the mean time between failures in a power-electronics converter, from a minimum of 5%, up to 100%.

제어봉 구동장치 제어기기 설계 및 검증에 관한 연구 (Study of Design and Verification for Control Rod Control System)

  • 육심균;이상룡
    • 대한기계학회논문집A
    • /
    • 제28권5호
    • /
    • pp.593-602
    • /
    • 2004
  • We have developed a digital control rod control system not only to improve its performance but also to improve its reliability and speed of response so that it can replace the old fashioned analog system. However, a new developed digital control system should be tested to prove the validity by using any prototype or mock-up before application. The reliability prediction and the reliability block diagram analysis methods were adopted to verify the reliability of the developed hardware. For the case of software, especially fur a new developed control algorithm it has been tested to prove performances and validation by using a dynamic simulator and mock-up of control rod drive mechanism altogether. Here we want to present some key factors regarding to the new developed digital system with some verification procedures.

군장비 신뢰성활동의 최근 동향 (Recent Trend of Reliability Activities for Military Systems)

  • 김철
    • 한국신뢰성학회지:신뢰성응용연구
    • /
    • 제7권3호
    • /
    • pp.111-118
    • /
    • 2007
  • In 2000, US Army Test and Evaluation Command (ATEC) released the status of reliability requirement levels and achievements for the military equipment which evaluated through the operational tests from 1985 to 1990 and from 1996 to 2000. The rates of military equipments that do not meet reliability requirements are 59% from 1985 to 1990 and 80% from 1996 to 2000. Thus, the US Army has figured out causes, taken steps and put them into practice, This paper is about the recent reliability problems and the latest tendency about US military equipment to acquirere liability level.

  • PDF

박동류 및 비박동류에 의한 체외순환의 비교 (Comparative Studies of Pulsatile and Nonpulsatile Blood Flow during Cardiopulmonary Bypass)

  • 선경;백광제;김요한;임창영;김광택;김학제;김형묵
    • Journal of Chest Surgery
    • /
    • 제18권2호
    • /
    • pp.182-192
    • /
    • 1985
  • [here are so many reports that pulsatile blood flow provides physiologic organ perfusions during cardiopulmonary bypass. So, we compared the recent 30 cases undergoing cardiac surgery by Cobe-Stckert pulsatile roller pump with another 30 cases by Polystan nonpulsatile roller pump. Pulsatile flow was applied during aortic-cross clamping period when synchronized to internal EKG simulator, and perfusion mode was changed to continuous nonpulsatile flow after declamping of aorta. Age, sex, weight, and disease entities were comparable and operative techniques were similar between two groups. 1. There were no differences in average ACC time, ECC time, and Operation time. 2. Postoperative artificial respiration time was 6hrs 30mins in nonpulsatile group and 4hrs 48mins in pulsatile group, and detubation time after ventilator weaning was 2hrs 44mins in nonpulsatile group and 1hrs 43mins in pulsatile group. 3. Average pulse pressure was 8mmHg in nonpulsatile group and 55mmHg in pulsatile group, and a mean arterial pressure was 66.0mmHg in nonpulsatile group and 60.7mmHg in pulsatile group. 4. Mean urine-output during ACC;ECC period was 9.717.3;9.913.2ml/kg/hr in nonpulsatile group and 14.215.0;15.817.5 in pulsatile group [p<0, 05], and thereafter progressive decrease of differences in urine output between two groups until POD 2, and lesser amounts of diuretics was needed in pulsatile group during same postoperative period. Serum BUN/Cr level showed no specific difference and urine concentration power was well preserved in both groups. 5. Plasma proteins and other Enzymes showed no differences between two groups, but serum GOT/GPT level was higher in nonpulsatile group till POD 2. 6. Serum Electrolytes showed no differences between two groups. 7. WBC, RBC, Platelet counts, Hgb and Hct were not different and Coagulogram was well preserved in both groups. 8. Plasma free Hgb level was 7.09mg% in pulsatile group compared with 3.48mg% in pulsatile group on POD 1 but was normalized on POD 2. Gross hemoglobinuria after ECC was noted in 6 cases [20%] of pulsatile group and 4 cases [13%] of nonpulsatile group. 9. In both groups, most patients were included in NYHA class III to IV [28 cases;93% in nonpulsatile group, 22 cases;73% in pulsatile group] preoperatively, and well improved to class I to 11[22 cases; 73% in nonpulsatile group, 30 cases; 100% in pulsatile group] postoperatively. There were 7 operative mortalities in nonpulsatile group only, which were 5 cases of TOF with hepatic failure, 1 case of multiple VSDs with low out-put syndrome, and 1 case of mitral valvular heart disease with cardiomyopathy. We concluded that the new, commercially available Cobe-Stckert pulsatile roller pump device was safe, simple, and reliable.

  • PDF

6 시그마의 적용에 대한 연구 (An Application Study of Six Sigma in Clinical Chemistry)

  • 장상우;김남용;최호성;박용원;추경복;윤근영
    • 대한임상검사과학회지
    • /
    • 제36권2호
    • /
    • pp.121-126
    • /
    • 2004
  • The primary goal of six sigma is to improve patient satisfaction, and thereby profitability, by reducing and eliminating defects. Defects may be related to any aspect of customer satisfaction: high product quality, schedule adherence, cost minimization, process capability indices, defects per unit, and yield. Many six sigma metrics can be mathematically related to the others. Literally, six means six standard deviations from the mean or median value. As applied to quality metrics, the term indicates that failures are at least six standard deviations from the mean or norm. This would mean about 3.4 failures per million opportunities for failure. The objective of six sigma quality is to reduce process output variation so that on a long term basis, which is the customer's aggregate experience with our process over time, this will result in no more than 3.4 defect Parts Per Million(PPM) opportunities (or 3.4 Defects Per Million Opportunities. For a process with only one specification limit (upper or lower), this results in six process standard deviations between the mean of the process and the customer's specification limit (hence, 6 Sigma). The results of applicative six sigma experiment studied on 18 items TP, ALB, T.B, ALP, AST, ALT, CL, CK, LD, K, Na, CRE, BUN, T.C, GLU, AML, CA tests in clinical chemistry were follows. Assessment of process performance fits within six sigma tolerance limits were TP, ALB, T.B, ALP, AST, ALT, CL, CK, LD, K, Na, CRE, BUN, T.C, GLU, AML, CA with 72.2%, items that fit within five sigma limits were total bilirubin, chloride and sodium were 3 sigma. We were sure that the goal of six sigma would reduce test variation in the process.

  • PDF