• Title/Summary/Keyword: Mattress Method of Construction

Search Result 5, Processing Time 0.024 seconds

A Study of the Construction Method for Soft Ground Reinforcement of Baekje Dynasty Based on the Low Swamp Remains in the Buyeo Area (백제시대 부여지역 저습지에 조성된 유적에서 나타나는 연약지반 개량공법 연구)

  • Cho, Weon-Chang
    • Journal of architectural history
    • /
    • v.19 no.6
    • /
    • pp.155-171
    • /
    • 2010
  • King Seong carried out the large-scale construction transferring the capital from Wungjin (Gongju) to Sabi (Buyeo) in 538. But because most of the Buyeo area was the low swamp in the time, it needed above all to form a site before transferring the capital. Until recently, in addition to the scientific excavation, the relief excavations for the construction of new building or the formation of road were conducted on many sites in the Buyeo area. As a result, many remains which were formed on the low swamp including the temple site of Neungsan-ri, Dongna Castle, the remains of Ssangbuk-ri (280-5 Bukpo, Hyeonnaedeul) and the remains of Gua-ri were identified. Also in these remains, the various engineering construction methods irrespective of the nature of remains were used for the purpose of the soft ground reinforcement as follows: mattress method of construction, pile designation, stone alignment, filing of decomposed granite soil, culverts and storage tanks. Especially, the mattress method of construction and the pile designation are thought to be the traditional engineering construction method at least in that they are appeared since the Three Han Sates era. And these soft ground construction methods had an effect on the construction of reservoir in Japan at the time. In the future, the construction method for soft ground reinforcement shall be concerned and studied further in the architecture and the civil engineering as well as the archeology.

Design and Construction of Cellular Foundation Mattress as Foundations of Building Structures (건축구조물 기초로서 셀룰러 기초 매트리스의 설계 및 시공)

  • Jeong Young Lee;Jong Gon Ko;Nguyen Ngoc Son;Jae Hak Park;Doo Kie Kim
    • Journal of the Korean Geosynthetics Society
    • /
    • v.22 no.1
    • /
    • pp.25-37
    • /
    • 2023
  • Cellular Foundation Mattress made of new materials such as high density polyethylene, are not currently use for the foundation of small and medium-sized buildings in Korea. Therefore, they need to be developed and verified based on domestic ground and field conditions. This study presents the basic design and construction method of Cellular Foundation Mattress. Since the foundation reinforcement effect of Cellular Foundation Mattress should be evaluated and verified for soft ground, a performance comparison evaluation was conducted using the Soilbag method, which is commonly used for the foundation of small and medium-sized buildings in Korea. After the mattress reinforcement, the settlement amount decreased by 38.4% compared to the original ground and the bearing capacity increased by 159%, confirming the same ground reinforcement effect and ground stability as the Soilbag method.

Dispersing Stress under Geogrid-Mattress Foundation (지오그리드 매트리스기호의 전파듣력에 관한 연구)

  • Ju, Jae-U;Jang, Yong-Chae;Park, Jong-Beom
    • Geotechnical Engineering
    • /
    • v.14 no.4
    • /
    • pp.117-128
    • /
    • 1998
  • Solid mattress foundation using geogrid has often been used on soft grounds to increase the bearing capacity, and its effect has received much recognition. Geogrid-mattress system is the method of construction which increases the bearing capacity and the effect of controlling settlement by dispersing load to wider foundation through its stiffness. But ifs mechanism has not been examined exactly yet. considered to be influential factors in the experiments. As a result of the experiments, the characteristic of dispersing stress under mattress foundations was understood and the way of calculating the bearing capacity in designing the mattress foundations was suggested.

  • PDF

The Introduction of Submarine Cable Protection Method for HVDC Link Project Between Jindo and Jeju (진도~제주간 HVDC연계사업 해저케이블 보호공법 소개)

  • Lee, Jong-Seok;Moon, Bong-Soo;Song, Sam-Seob;Hong, Soon-Myung
    • Proceedings of the KIEE Conference
    • /
    • 2009.07a
    • /
    • pp.359_360
    • /
    • 2009
  • KEPCO signed up with LS CABLE as a contractor for HVDC submarine cable construction in February 2009. The desk research has been completed in may 2009. Also, Cable route and the protection method will be selected by November 2009. The tentative cable route between Jindo and Jeju which is consisted of sea farms and shipping route zone will reach almost 105km. The oceanographic survey for the selection of protection method will be carried out and the survey lists are consisted of MBES, SSS, CPT, ADSP. The protection methods such as burial, Concrete Mattress, UP Pipe, Rock Berm will be selected as per each condition of sea area after the oceanographic survey is completed. Kepco has developed variable methods based on the maintenance experience for HVDC submarine cable between HAENAM and JEJU. Based on the such a accumulated know-how, it can be expected for the confidence and stability of the 2nd HVC project to be improved.

  • PDF

A Study on the Damages of Head Works by the Storm Flood in the Area of Cheong Ju and Boeun -Emphasis onFactors Influenced on the Disasters and their Countermeasures- (淸州 및 報恩地方의 頭首工洪水災害에 關한 調査硏究(II) -災害原因 및 對策方案을 中心으로-)

  • Nam, Seong-Woo;Kim, Choul-Kee
    • Magazine of the Korean Society of Agricultural Engineers
    • /
    • v.24 no.2
    • /
    • pp.49-55
    • /
    • 1982
  • The purpose of this study is to classify the factors influenced on the damages of head works suffered from the storm flood occurred on July 22 1980 in both Musim and Bochong rivers and to find out an integral counter measures against the causes influenced on the disaster of head works in the engineering aspect of planning, design, construction and maintenance. In this survey, number of samples was taken 25 head Works, and the counter measures against the causes of their disasters summarized was as follows, 1. In the aspect of planning a. As the flood water level after the establishment of head works is more increased than the level before setting of head works owing to having more gentle slope of river bed between the head works than nature slope of river bed. Number of head works should be reduced for the appropriate annexation of them b. In the place where head works is established on the curved point of levee, the destruction of levee becomes severe by the strong deflective current. Therefore the setting of head works on the curved point should be kept off as long as possible and in case of unavoidable circumstances the construction method such as reinforced concrete wall or stone wall filed with concrete and anchored bank revetments should be considered. 2. In the aspect of design a. As scoring phenomena at up stream is serious around the weir Where the concentration of strong current is present in such a place, up stream apron having impermeability should be designed to resist and prevent scoring. b. As the length of apron and protected bed is too short to prevent scoring as down stream bed, the design length should be taken somewhat more than the calculated value, but in the case the calculated length becomes too long to be profitable, a device of water cushion should be considered. c. The structure of protected river bed should be improved to make stone mesh bags fixed to apron and to have vinyl mattress laid on river bed together with the improvement for increasing the stability of stone mesh bags and preventing the sucked sand from the river bed. d. As the shortage of cut-off length, especialy in case of the cutoffs conneting both shore sides of river makes the cause of destruction of embankment and weir body, the culculation of cut-off length should be taken enough length based on seepage length. 3. In the aspect of design and constructions a. The overturing destruction of weir by piping action was based on the jet water through cracks at the construction and expansion joints. therefore the expansion joint should be designed and constructed with the insertion of water proof plate and asphalt filling, and the construction joint, with concaved shape structure and steel reinforcement. b. As the wrong design and construction of the weep holes on apron will cause water piping and weir destruction, the design and construction of filter based on the rule of filter should be kept for weep holes. c. The wrong design and construction of bank revetment caused the severe destruction of levee and weir body resulting from scoring and impulse by strong current and formation of water route behind the revetment. Therefore bank revetment should be designod and constructed with stone wall filled with concrete and anchored, or reinforced concrete wall to prevent the formation of water flow route behind the wall and to resist against the scoring and impulse of strong stream. 4. In the aspect of maintenance When the damaged parts occurred at head works the authorities and farmers concerned should find and mend them as soon as possible with mutual cooperation, and on the other hand public citizen should be guided for good use of public property.

  • PDF