• Title/Summary/Keyword: Material Cost

Search Result 3,025, Processing Time 0.034 seconds

A Study on the Performance Evaluation of Form Using the Aluminum Alloy Frame Reinforced Panel (Aluminum 합금재 Frame을 이용한 벽체거푸집공법의 성능평가에 관한 연구)

  • 안재철;오상균;강병희
    • Journal of the Korea Institute of Building Construction
    • /
    • v.1 no.1
    • /
    • pp.135-142
    • /
    • 2001
  • This study is for the investigation of form using the aluminum-compound metal frame(Aluminum frame reinforced panel : AFR panel) which is improved in the capacity in the wall-concrete structure in steal of using the existing form which has problems such as, excessive exposure of cement, the loss of labor when it is constructed or disjointed, and it's economical efficiency compared with that of EURO Form. AFR panel passes the KS F 8006 test, and as a result of field test, it's displacement is satisfied with Specification. And using AFR panel is more economical than that of EURO Form because saving labor cost which plays a major part in cost saving in formwork is more effective in retrenching total cost than increment of material cost.

  • PDF

Interior Cost Estimating as a Design Marketing Tool - for Executive Office Interior (디자인 마케팅을 위한 인테리어 공사비 초기 예측기법- 일원공간의 인테리어 프로젝트를 중심으로 -)

  • 이혜연
    • Korean Institute of Interior Design Journal
    • /
    • no.23
    • /
    • pp.68-73
    • /
    • 2000
  • The purpose of this research is to develop interior construction cost-estimating system at the early stage of the project. Though general construction estimates are typically in quantitative, interior construction should be in rather qualitative. Therefore, design-concerned cost-estimating methods should be developed to manage interior projects from the early statge. 30 estimates of VIP-Zone interior projects, were examined to develop the general type of composition and material classification. The cost has been classified by construction parts such as wall, ceiling, floor, and doors & windows and their treatments. The composition and material related estimating system (CMRES) was consisted of the unit average costs of classification and the variation coefficients. The CMRESS was verified by the case study, and the results sowed that the difference between the actual estimate and the CMRES was competitively confident.

  • PDF

Optimum design of axially symmetric cylindrical reinforced concrete walls

  • Bekdas, Gebrail
    • Structural Engineering and Mechanics
    • /
    • v.51 no.3
    • /
    • pp.361-375
    • /
    • 2014
  • The main aim of this paper is to investigate the relationship between thickness and height of the axially symmetric cylindrical reinforced concrete (RC) walls by the help of a meta-heuristic optimization procedure. The material cost of the wall which includes concrete, reinforcement and formwork, was chosen as objective function of the optimization problem. The wall thickness, compressive strength of concrete and diameter of reinforcement bars were defined as design variables and tank volume, radius and height of the wall, loading condition and unit cost of material were defined as design constants. Numerical analyses of the wall were conducted by using superposition method (SPM) considering ACI 318-Building code requirements for structural concrete. The optimum wall thickness-height relationship was investigated under three main cases related with compressive strength of concrete and density of the stored liquid. According to the results, the proposed method is effective on finding the optimum design with minimum cost.

Analysis of Change of Construction Material Price by International Oil Price Fluctuation (국제유가 변동에 따른 건설자재가격 변화 분석)

  • Park, Jin-Yong;Byun, Jeong-Yoon;Yoo, Seung-Kyu;Kim, Ju-Hyung;Kim, Jae-Jun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2012.05a
    • /
    • pp.319-320
    • /
    • 2012
  • International oil prices is the world's leading macroeconomic indicators. Rising international oil price has been worsening. profitability of construction company including material cost as well stagnation in housing market. Thus, according to fluctuations in international oil prices has cost index need to see any change happening there. in this study, 2000 to 2011 interest rates, exchange rates and oil price fluctuations in construction cost is to compare the impact.

  • PDF

A Ring VCO Based PLL for Low-Cost, Low-Power Multi-Band GPS Receiver (Ring-VCO를 이용한 멀티밴드 GPS 수신기용 PLL 설계)

  • Kim, Yun-Jin;So, Byeong-Seong;Ko, Jin-Ho;Park, Keun-Hyung
    • Proceedings of the Korean Institute of Electrical and Electronic Material Engineers Conference
    • /
    • 2008.06a
    • /
    • pp.533-534
    • /
    • 2008
  • This paper presents a multi-phase ring VCO for low-cost, low-power GPS receiver. In the RF band used in GPS, L1 band is now in commercial-use and L2,L5 are predicting to be commercial-use soon. Thus Wide band PLL and Cost-effective IC solutions are required for future multi-band GPS receiver that received three types band at once. A new PLL architecture for multi-band GPS application is proposed. Ring VCO is even smaller than LC-VCO and a good alternative for low-cost solution. Proposed multi-phase ring VCO offers wide frequency range covering L1, L2, and L5 band, 20% reduction of area, 23% reduction of PLL power and can generate I/Q without extra I/Q generator.

  • PDF

Low Cost Design Study of Brushless DC Motor for Electric Water Pump Application

  • Jung, Tae-Uk
    • Journal of Electrical Engineering and Technology
    • /
    • v.9 no.3
    • /
    • pp.942-949
    • /
    • 2014
  • We studied about the rotor design change using a Ferrite ring magnet to reduce material cost in the condition of the same stator core design. However, this design direction has many weak points such as the decrease of BEMF, the low maximum output, the irreversible demagnetization characteristics of a permanent magnet and so on. In order to mitigate such disadvantages, an optimization design of the BLDC motor has been developed by changing each design parameter and by improving the electromagnetic structure. In the proposed water pump SPM BLDC motor using Ferrite magnet, the outer and inner diameter of stator is fixed to the value of the conventional IPM BLDC motor using Nd-Fe-B magnet. The design specification requirements should be satisfied with the same output power and efficiency characteristics in the same dimension. As a result of this study, the design comparison results considering driving performances and material cost are represented. Through the actual experiment with the prototype of the designed motor, the simulations results are verified.

Wear Limit of Tool by the Shift and Failure of a Machining Process (절삭공정의 변이와 고장에 의한 가공공구의 마모한계)

  • 이도경
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.18 no.35
    • /
    • pp.9-16
    • /
    • 1995
  • The degeneration of tool in material removal processing machinery can be characterized by wear, deflection, chattering and any failure in tool or in the material In be processed. In the previous studies, first three of them are analyzed as a preventive maintenance strategy in quality control area. The last of them, any failure, is analyzed as a preventive maintenance strategy in reliability area. In this research, we propose a simple integrated mathematical model which minimizes the cost of machinery failures and producing defects. We determine the optimal wear limit of tool by considering the percent defects. cost, the preventive maintenance cost, and the corrective maintenance cost.

  • PDF

Identifying Factors Affecting Dental University Hospitals' Profitability (치과대학병원 수익성에 영향을 미치는 요인 분석)

  • Lee, Ji-Hoon;Kim, Seong-Sik
    • Korea Journal of Hospital Management
    • /
    • v.26 no.2
    • /
    • pp.17-26
    • /
    • 2021
  • Purposes: This study aims to identify factors affecting dental university hospitals' profitability and understand recent their business condition. Methodology: Data from 2016 to 2019 was collected from financial statement, public open data in 8 dental university hospitals. For the study, multiple regression test with stepwise selection was applied. Findings: First of all, 9 out of 19 independent variables were selected by stepwise selection. As a result of multiple regression test with selected independent variables and the dependent variable(operating profit margin ratio), the factors affecting hospitals' profitability were the number of dental unit chair, hospital location, debt ratio, total capital turnover ratio, employment cost rate, material cost rate, management expense rate, the number of patient per a dentist. Practical Implication: To improve dental university hospitals' profitability, hospitals specifically analysis and manage their cost such as employment, material and management cost and seek effectiveness by managing the proper number of patient per a dentist.

STUDY OF NEW CAST-IN-PLACE MORTAR WALL FOR HOUSE CONSTRUCTION COMPARED TO BRICK AND MORTAR-BLOCK SYSTEM (A SIMULATION IN DIFFERENT AREAS)

  • Arief Setiawan Budi Nugroho;Shin-ei Takano
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.196-202
    • /
    • 2009
  • Study from Yogyakarta earthquake reconstruction program, cast-in-place wall using fix-size formwork system (Old-CIP) has offered a good alternative for house construction. A simulation has also confirmed that this system using mortar as the main material can provide cheapest cost and lowest total man power compared to conventional wall construction technique: brick or mortar-block wall. This paper presents the new wall construction technique: full size cast-in-place wall (New-CIP). The detail of how this new technique implemented is described. In addition, considering that material and labor cost in one area is different to others, cost analysis for different resources prices and wages of three cities are taken into a simulation. The analysis is aimed to distinguish the implementation feasibility of New-CIP system compared to the four common wall systems. Finally, its implementation resistance is also discussed.

  • PDF

대학도서관 자료처리 원가계산에 관한 연구

  • 이경호;심의순
    • Journal of Korean Library and Information Science Society
    • /
    • v.10
    • /
    • pp.157-191
    • /
    • 1983
  • The purpose of the study is to build a general cost a counting model for university libraries, to clarify the possible areas of its a n.0, pplication by employing job cost accounting and process cost accounting methods. System analysis is performed as to the fields of acquisition, processing (cataloging & classification), and book shelving system. The existing operation processes and time required for each operation of these three systems are analyzed, from which detailed system flowcharts were drawn and job descriptions and the content of job were identified. The results of the study can be summarized as follows: (1) The processing time of one book in each systems: Oriental books. a. Acquisition system. the time required the time required in case of job cost case of job cost accounting after purchasing, 8 min. 21 sec. the time required in case of process cost accounting 15 min. 7 sec. b. Processing system. the time required for non-duplicate, 34 min. 40 sec. the time required for duplicate, 8 min. 49 sec. the time required for purchasing of more than the time required two copies at a time. 4 min. 44 sec. c. Book shelving system. the time required. 1 min. 43 sec. Western books. a. Acquisition system the required in case of job cost accounting, 9 min. 1 sec. the time required in case of process cost accounting. 15 min. 7 sec. b. Processing system. the time required for non-duplicate, 32 min. 58 sec. the time required for duplicate, 9 min. 26 sec. the time required for purchasing of more than two copies at a time. 5 min. 33 sec. c. Book shelving system. the time required. 1 min. 43 sec. (2) Total sum of processing time and processing cost per book. Oriental books (including material cost) the time required. cost. a. non-duplicate, 51 min. 30 sec. 2, 791 won b. duplicate, 25 min. 39 sec. 1, 580 won c. purchasing of more than two copies as a time, 21 min. 34 sec. 1, 368 won Western books(including material cost) a. non-duplicate, 49 min. 48 sec. 3, 189 won b. duplicate, 26 min. 16 sec. 1, 846 won c. purchasing of more than two copies at a time. 22 min. 23 sec. 1, 388 won

  • PDF