• Title/Summary/Keyword: Material Cost

검색결과 3,046건 처리시간 0.029초

건설용 3D 프린팅 기술의 해외 사례 조사 및 국내 상용화 방안 (Overseas Case Study of 3D Printing Technology for Construction and Commercialization Plan in Korea)

  • 승인배;백효선;박정환
    • 한국산업융합학회 논문집
    • /
    • 제21권6호
    • /
    • pp.273-284
    • /
    • 2018
  • 3D printing technology in the construction field is currently being developed and commercialized actively in foreign countries, but the development of material and equipment is underway as an initial research stage in Korea. It is necessary to implement commercialization through the introduction of 3D printing technology in the construction field as soon as possible in Korea, but there is no guideline for suitable equipment and materials in Korea at present. Therefore, in order to help prepare for commercialization, it is necessary to provide data such as equipment size and materials suitable for commercialization at the initial stage. This study investigates the types, specifications, and applications of equipment that are being used overseas to provide the equipment type and material cost required in the initial stage of commercialization in Korea. Using the surveyed data, it was possible to calculate the advantages and disadvantages of the equipment type and specification, and the cost of materials used. As a result of the analysis, Gantry type is suitable for the domestic commercialization, and the standard of the output area is $100m^2$ and the extrusion amount of $250m^3/sec$ is proposed, and the material cost of the commercial product is 20thousand won. The suggestions in this study will help to plan the construction of products and equipments to commercialize 3D printing technology in construction field in the future.

식품회사 자재수급관리 프로그램를 위한 전산화 연구 (A Study for Computerization of Incoming and Outgoing Processes of Many Parts and Much Material in Food Industry)

  • 장경;이진범
    • 산업경영시스템학회지
    • /
    • 제25권1호
    • /
    • pp.78-84
    • /
    • 2002
  • This paper is a study for the computerization program of incoming and outgoing processes of a number of parts and a great amount of material for producing products in flood industry, which was required by a medium-sized company located at Cheon-An. The program consists of four databases, one main form, seventeen subforms, and eight report forms. Concretely speaking, the four databases are prepared for products, semi-products, material, and reports, and the seventeen subforms are those for current inventory, used quantity, safty stock, product specification, etc. With the program, users can be helped and save manpower, time and cost in incoming and outgoing processes of parts and material for producing products and in their real time operation and decision-making.

RFID를 활용한 공동주택 건설공사 자재관리 방안 연구 (Materials management using RFID in the apartment construction)

  • 박소현;송정화;오건수
    • 한국주거학회:학술대회논문집
    • /
    • 한국주거학회 2008년도 춘계학술발표대회 논문집
    • /
    • pp.251-255
    • /
    • 2008
  • Nowadays the scale of domestic construction becomes large, sophisticated and specialized. It has led to a growing need for the high quality, cost reduction, safety and reduction of work duration. Therefore the importance of construction materials management is emphasized to perform the project successfully. It becomes an current issue about method of construction material management according to the flow of construction progress in the construction field. Therefore, various researches using RFID for efficiency of construction material are being studied. We analyzed the case study using RFID, drew the problems through the investigation of status about the management of material in the field, and then suggested the method of material management using in the apartment building construction field.

  • PDF

최적 토량배분 계획을 위한 의사결정 모델 (Decision Making Model for Optimal Earthwork Allocation Planning)

  • 곽한성;서병욱;이동은
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2016년도 춘계 학술논문 발표대회
    • /
    • pp.162-163
    • /
    • 2016
  • This paper presents a mathematical model for optimizing earthwork allocation plan that minimizes earthwork cost. The model takes into account operational constraints in the real-world earthwork such as material-type (i.e., quality level of material) and quantities excavated from cut-sections, required quality of material and quantities for each embankment layer, top-down cutting and bottom-up filling constraints, and allocation orders. These constraints are successfully handled by assuming the rock-earth material as the three dimensional (3D) blocks. The study is of value to project scheduler because the model identifies the optimal earth allocation plan (i.e., haul direction (cut and fill pairs), quantities of soil, type of material, and order of allocations) expeditiously and is developed as an automated system for usability. It is also relevant to estimator in that it computes more realistic earthworks costs estimation. The economic impact and validity of the mathematical model was confirmed by performing test cases.

  • PDF

AHP기버을 이요한 물류시스템의 경제성평가에 관한 연구 (A Study on the Economic Justification of a Material Handling System using AHP)

  • 장원호;함효준;이광수
    • 산업경영시스템학회지
    • /
    • 제18권35호
    • /
    • pp.139-155
    • /
    • 1995
  • This study is concerned with the economic analysis of implementing a material handling system using automated guided vehicle(AGV)s in order to improve the productivity of the production process of chinawares. Analytic hierarchy process(AHP) method for selecting the facilities of material handling systems is presented. Subsequently, as an example, a chinaware production line is analyzed for the economic analysis. The result shows that seven manpowers can be reduced. However the introduction of the new material handling system is turn out to be undesirable due to high initial cost of AGV system, Nevertheless, in the long term, automatic material handling system such as AGV system are expected to play major roles in the modern manufacturing area.

  • PDF

복합재 재료인증을 위한 시험입회 방법론 (Test Witness Methodology for Acquisition of the Composite Material Qualification Data)

  • 이승윤
    • 항공우주시스템공학회지
    • /
    • 제9권3호
    • /
    • pp.8-11
    • /
    • 2015
  • Since the late 1990's, FAA, NASA and the aerospace industry have worked together to develop the sharing system of the composite material qualification databases which were obtained through the standardized fabrication and testing procedures. The result was what is now known as the AGATE(Advanced General Aviation Transport Experiments) or NCAMP(National Center for Advanced Materials Performance) methodology, a more cost-effective concept that shifts the major responsibility for qualification and testing from the aircraft manufacturer to the material supplier. The properties of composite materials are largely dependent on the testing as well as the raw material properties and the manufacturing process including the process control parameters. Thus it is important in the composite material qualification to comply with the standardized testing procedures. In this paper, I will describe the standardized witness methodologies of certification engineers to reduce the effect of testing variability within the qualification data.

Triboelectrification based Multifunctional Tactile Sensors

  • Park, Hyosik;Kim, Jeongeun;Lee, Ju-Hyuck
    • 센서학회지
    • /
    • 제31권3호
    • /
    • pp.139-144
    • /
    • 2022
  • Advanced tactile sensors are receiving significant attention in various industries such as extended reality, electronic skin, organic user interfaces, and robotics. The capabilities of advanced tactile sensors require a variety of functions, including position sensing, pressure sensing, and material recognition. Moreover, they should comsume less power and be bio-friendly with human contact. Recently, a tactile sensor based on the triboelectrification effect was developed. Triboelectric tactile sensors have the advantages of wide material availability, simple structure, and low manufacturing cost. Because they generate electricity by contact, they have low power consumption compared to conventional tactile sensors such as capacitive and piezoresistive. Furthermore, they have the ability to recognize the contact material as well as execute position and pressure sensing functions using the triboelectrification effect. The aim of this study is to introduce the progress of research on triboelectrification-based tactile sensors with various functions such as position sensing, pressure sensing and contact material recognition.

도침술의 진료수가에 대한 문제점과 개선방안 (Problems and Potential Improvements of National Health Insurance Fees Associated with Miniscalpel Acupuncture)

  • 오세정;박무섭;이정희;전승아;공한미;최성훈;황보민;이현종;김재수
    • Journal of Acupuncture Research
    • /
    • 제33권3호
    • /
    • pp.67-73
    • /
    • 2016
  • Objectives : The objective of this study is to discuss problems and potential improvements of national health insurance fees associated with miniscalpel acupuncture according to Korean medical doctors' workload, material cost and degree of risk. Methods : We researched the change of relative value points, national health insurance fees, the acupuncture process, and Korean medicine doctors' workload related to Miniscalpel acupuncture, as compared to general meridian point acupuncture. We also examined material cost by surveying pharmacies, internet shopping malls and medical appliance shops. Results : Relative value point for Miniscalpel acupuncture decreased from 2010 to 2012, and remained the same from 2012 to 2016. National health insurance fees for Miniscalpel acupuncture increased by a small margin annually for rise of equivalent index. There was no reporting on workload related to Miniscalpel acupuncture. Material cost of Miniscalpel acupuncture was 18.2~20.7 times higher than actual cost of procedure. There were few studies examining medical accidents related to Miniscalpel acupuncture, and thus we could not evaluate degree of risk. Conclusion : We suggest revaluating Korean medical doctors' workload related to including Miniscalpel acupuncture, to consider the material costs of Miniscalpel acupuncture, and investigate its degree of risk by researching medical accidents.

건설기술진흥법 상 안전관리비에 대한 적산 및 품셈을 통한 적정 요율 산정에 관한 연구 (A Study on the Proper Rate of the Safety Management Cost under the Construction Technology Promotion Act by Direct Calculation)

  • 채용섭;윤영근;오태근
    • 한국안전학회지
    • /
    • 제33권2호
    • /
    • pp.68-75
    • /
    • 2018
  • The safety management cost system under the Construction Technology Promotion Act has contributed greatly to the prevention of construction accidents according to the chronological changes and social demand, but various problems have been pointed out. The biggest problem is that the safety management cost is earmarked very low because other items of safety management costs except for the safety inspection are not appropriately included in the actual construction site. Furthermore, it has been pointed out that it is difficult to settle the orderer due to the lack of specific use criteria. Therefore, in order to secure the proper safety management cost, this study is to estimate the actual cost by using of specification, quantity, material cost, labor cost for each type of the safety management item The results of this study were compared with the 71 cases of safety management costs in the safety management plan. In addition, analysis of unclear or unnecessary items in the current safety management cost and criteria and suggestions for improvement are provided. It is hoped that the results of this study will contribute to the rational safety management rate calculation.

우주발사체 개발사업의 비용 추정 현황 및 사례 (Application of Cost Estimation to Space Launch Vehicle Development Program)

  • 유일상;서윤경;이준호;오범석
    • 산업경영시스템학회지
    • /
    • 제30권3호
    • /
    • pp.165-173
    • /
    • 2007
  • A space launch vehicle system represents a typical example of large-scale multi-disciplinary systems, consisting of subsystems such as mechanical structure, electronics, control, telecommunication, propulsion, material engineering etc. A lot of cost is required to develop the launch vehicle system. A precise planning of R&D cost is very essential to make a success of the launch vehicle development program. Especially in the early development phase of a new space launch vehicle system, cost estimation techniques and analogy from past similar development data are very useful methods to estimate a development cost of the launch vehicle system. Now Korea Aerospace Research Institute is in charge of the KSLV-I (Korea Space Launch Vehicle-I) Program that is a part of Korea National Space program. KSLV-I Program is a national undertaking to develop launch capabilities to deliver science satellites of a 100kg-class into a low earth orbit. It is hereafter, going to plan to develop a new korean space launch vehicle. In this paper, first the development costs of well-known launch vehicles in the world are presented to provide a reference to make a development plan of a new launch vehicle. Second this paper introduces the present status of cost estimation applications at NASA. Finally this paper presents the results from application of a TRANSCOST, a parametric cost model, to derive a cost estimate of a new launch vehicle development, as an example.