• Title/Summary/Keyword: Marine Construction

Search Result 1,019, Processing Time 0.022 seconds

On the Bridge Construction in Marine by GPS (GPS측량을 이용한 연륙교 가설공사에 관한 연구)

  • 오창수;최광희;임학량;조형식
    • Proceedings of the Korean Society of Surveying, Geodesy, Photogrammetry, and Cartography Conference
    • /
    • 2004.11a
    • /
    • pp.111-116
    • /
    • 2004
  • This study is given that on the bridge construction in marine by GPS, specially, choice of station for footing construction of marine bridge. You can get positive datum in the checking of marine excavation, if you use together Total Station and GPS. In the result of comparision of upper surveying methods, Surveying datum is gotten error of less than 30mm(The depth of water 10~l5mm, station 7~10mm). This study show that hereafter if you use GPS in bridge construction in marine you can get accurateiy datum.

  • PDF

A Study on Duty Competency and Utilizing Package Development for Construction of Marine Terminal Structure (해양터미널구조물설치분야 직무능력 및 활용패키지 개발에 대한 연구)

  • PARK, Jong-Un;KANG, Beodeul;BAEK, In-Hum
    • Journal of Fisheries and Marine Sciences Education
    • /
    • v.28 no.2
    • /
    • pp.456-464
    • /
    • 2016
  • NCS development for construction of marine terminal structure was carried out through following procedures such as analysis on characteristics, analysis on duty, development of the first draft for standards, validation of industry sites, duty competency standards through expert committee, and utilizing package. The results were as follows. Firstly, duty competency was classified as levels from 3 to 7. Educational training institutions were followed by 22 universities, 21 colleges, 16 graduate schools, and 10 high schools. Secondly, developed standards were consisted of duty and competency unit. The name of duty was construction of marine terminal structure and competency units were consisted of 9 items as survey on economic effect, evaluation of conditions on construction environment, plan for construction of structure, construction of transfer, mooring, and power equipment, and construction, startup test, and maintenance of terminal structure. 33 competency unit elements below 9 competency units were developed. Thirdly, utilizing package was developed into 3 areas of life-long career path, training criteria, and guidelines for exam according to national competency standards for in order to develop development of labor's career and perform personal management such as hiring and promotion in industry sites.

The mechanical properties of Muddy tidal flat mortar with Standard gradiation of Marine sand (표준입도 분포의 해사를 사용한 갯벌 모르타르의 역학적 특성)

  • Kim, hui doo;Choi, Sung Jin;Yang, Seong Hwan
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2014.11a
    • /
    • pp.36-37
    • /
    • 2014
  • Construction work in island areas requires the materials to be transported by ship and plane, and it causes an increase in the construction costs. In addition, the construction work near marine zones may produce the marine pollution due to the harmful substances in the cement. Recently, nature-friendly construction materials are increasingly used, and there is a need to select and develop appropriate construction materials. In this study, the compressive strength, tensile strength, flow and chloride content of the mortar mixed with cement and muddy tidal flat were measured to reduce the amount of cement by applying the natural materials, muddy tidal flat and marine sand, and the results were provided as the basic construction material data.

  • PDF

A Study on the Marine Science Education Comprehensive Portal Site Construction for Elementary, Middle and High School Students (초중고생을 대상으로 한 포괄적 해양교육 포털사이트 구축을 위한 기반연구)

  • Park, Jong-Un
    • Journal of Fisheries and Marine Sciences Education
    • /
    • v.19 no.2
    • /
    • pp.229-238
    • /
    • 2007
  • The Purpose of this study is to examine the present marine science education programs in Korea and understand how they are organized and how well they are being used. Eventually, being a foothold research prior to the construction of an inclusive marine science education portal site for elementary, middle, and high school students is the objective of this study. Through this study, we can expect three positive effects. First, through classification of marine science education programs, it can be used when dividing the contents and writing textbooks for elementary school students. Second, through the construction of portal site, we can expect to correct the recognition and understanding of marine and it will contribute to the future industry development. Third, we can offer the correct materials for teaching and learning and through learning, understanding on marine will get better.

A Study on Marine Pile Construction Management by Real-Time Kinematic GPS Positioning (RTK-GPS 측량에 의한 해상파일 시공관리에 관한 연구)

  • 강길선
    • Journal of the Korean Society of Surveying, Geodesy, Photogrammetry and Cartography
    • /
    • v.21 no.4
    • /
    • pp.393-401
    • /
    • 2003
  • Automatic control technologies for the marine pile driving provides accurate and rapid intruding into the planned positions of the pile with planned slope and direction, so that the construction maintenance and management are more efficient and the quality of the construction is more promising. Therefore, in this study, the application scheme of RTK GPS to the automatic control of the pile driving presented. It is expected that the presented scheme using the precise RTK GPS technique assures the efficient and economic 3D positioning accuracy for the precise marine construction management like the precise foundation of marine structures made of piles and the dredging work. It is found that the suggested scheme decrease 60% of the construction error compared with specifications reference because marine position accuracy is measured within 4cm in real time. In addition, the automatic position control system using GPS reduced the construction period and cost compared with existing methods about 30% and 35%, respectively.

A Study on the Responsibility for a Barge's Safety Management in a Marine Construction (해상공사에 투입된 부선의 안전관리 책임에 대한 연구)

  • Jang, Yeong-Jun
    • Journal of Navigation and Port Research
    • /
    • v.39 no.1
    • /
    • pp.37-43
    • /
    • 2015
  • At marine construction sites, there are problems with regard to dispute on the responsibility of safety management of chartered barge and its legal issues. In general, demise charter with crew is used for barge charterparty which is committed to the marine construction. Although Chapter 5 of the Korean Commercial Act enact provisions regulating a Time Chargerparty and a Bareboat Charterparty, it is difficult to clarify where the responsibility lies with regard to the safety control of the chartered barge. For this reason, disputes on accountability arise when accident occurs in effect. As a result, parties of the charterparty shift the responsibility on each other and there is increased risk for occurrence of similar accidents. There is no legally required qualification for a head of barge workers who is in charge of barge management. It is not possible to demand the head of barge workers to take charge of tasks which requires professional judgment as a marine technician considering his daily work scope. Furthermore, the barge committed to the marine construction as a form of bareboat charter or equipment charterage is an object which should be managed by safety supervisor of the charterer's marine construction. The charterer bears a duty to manage the safety of the barge. Therefore, the charterer is generally liable for the damage incurred in the course of using the chartered barge.

A Study on the Standard of Ship Hull Construction for Aluminium Alloys Fishing Boats (알루미늄 합금제 어선건조를 위한 선체구조기준 설정에 관한 연구)

  • Hong, Bong-Ki
    • Journal of Fisheries and Marine Sciences Education
    • /
    • v.12 no.1
    • /
    • pp.22-82
    • /
    • 2000
  • The ship hull construction materials of fishing boat has changed in order that wooden, steel, and fiber glass reinforced plastic(FRP). The fishing boat made from FRP has increased every year because that materials has proved excellent of the characteries for fishing boats construction members. Recently, FRP tend towards evasion for the pollution of air enviroment. Therefore. the materials of fishing boat construction must be exchanged by another one. Aluminium alloys must be recommended for fishing boats construction mateials because that is light weight and corrosion resisting in the sea water. Regulation of the standard of ship hull construction for aluminium alloys fishing boats did not enact laws in the interior now. Therefore, this regulation was studied by the following items. that is Rudder, Bottom construction, Side hull plate construction, Deck plate construction, piller. Water tight bulkhead, Deep tank, Fish tank, Stern construction, Superstructure, Deck house construction, Hatch, Engine room opening, Hatch opening, Bulwark, Welding and Rivet etc. A study on the regulation will be contributed to enact laws for fishing boat construction of aluminium alloys.

  • PDF

Repair Procedure and Structural Strength Analysis to Damage of Moon-Pool Structure for Drillship During Construction (드릴쉽 건조 중 문풀 구조 수정 작업 및 구조적 안정성 검토)

  • Yoo, In-Sang;Sohn, Sang-Young;Baek, Seung-Jung;Choi, Young-Lack;Yoo, Hae-Kun;Yoon, Ki-Jeong
    • Special Issue of the Society of Naval Architects of Korea
    • /
    • 2011.09a
    • /
    • pp.12-16
    • /
    • 2011
  • During the shipbuilding construction, the repair works will be occurred by various reasons such as the natural disaster, mistakes of engineers or workers, defect of material, and so on. The one of the engineer's responsibilities is to design considering every possibility and to prevent the repair works due to the mistakes during construction stages, but actually it is very difficult and impossible to avoid every mistake. However, it is also the responsibility of engineers to find the best solution for the unavoidable mistakes which is to maintain the capacity of vessel and guarantee the safety for the repair works considering the construction schedules and economic cost. In this paper, it will be introduced the brief of repair works to the structural damage of the moon-pool structure in drillship which is built in our shipyard. For the verification of the structural strength, the fatigue analysis has been carried out based on the guide of Classification society. Furthermore, the modifications of structure design and welding procedure have been applied to avoid the stress concentration in the moon-pool structure.

  • PDF

A Study on Environmental Impact Assessment Guidelines for Marine Environmentsin Construction Projects of Offshore Waste Disposal Landfills (해상최종처리장 건설사업의 해양환경 환경영향평가 가이드라인 개발 연구)

  • Lee, Haemi;Son, Minho;Kang, Taesoon;Maeng, Junho
    • Journal of Environmental Impact Assessment
    • /
    • v.28 no.3
    • /
    • pp.312-331
    • /
    • 2019
  • An offshore waste disposal facility refers to a landfill site for final landfilling of stabilized inorganic solid waste such as land and marine waste incineration materials, and the aim of such a facility is to solve the problem of insufficient waste disposal space on land and create and develop environmentally friendly marine spaces. The purpose of this study is to prepare guidelines for the construction of offshore waste disposal facilities, which reflect the need and importance of paying sufficient heed to environmental considerations from the initial stage of the project, in order to investigate, predict, and assess how such guidelines will affect the marine environment in relation to the construction of offshore waste disposal facilities, with the goal of minimizing the impact on and damage to the environment. For the purpose of this research, guidelines focusing on the construction of offshore waste disposal facilities were derived through an analysis of domestic cases and similar foreign cases and an assessment of their level of compliance with existing EIA guidelines through the operation of a discussion forum. In order to review the EIA report on similar cases in Korea, 17 EIA documents (2005~2016) for dredged soil dumping areas and ash ponds of thermal power plants were analyzed to investigate the status of marine organisms, marine physics, marine water quality, and marine sediment and to understand what types of problems can occur and what improvement measures can be taken. The purpose of these guidelines were to minimize damage to the marine environment by promoting EIA protocols in accordance with scientific and systematic procedures, to reduce the consultation period related to projects, to resolve social conflicts, and to reduce economic costs.

Construction Cost Estimation on the Initial Design Stage of Naval Ships based on a Product Configuration Model (Product Configuration Model 개념 기반의 함정 건조공수 추정 연구)

  • Oh, Dae-Kyun;Jeong, Yeon-Hwan;Shin, Jong-Gye;Choi, Yang-Ryul
    • Journal of the Society of Naval Architects of Korea
    • /
    • v.46 no.3
    • /
    • pp.351-361
    • /
    • 2009
  • Many manufacturers define the system of a new product flexibility, and take advantage of previous-product information using the product configuration concept. Product configuration is an approach that defines the system of a new product centered on the product structure by referring to the previous-product information. In this paper, it is established how to apply the concept of a product configuration utilizing previous-ships information in construction cost estimation process systematically and effectively. For this, we define the advanced-construction cost estimation process based on a naval ship product model, and design construction cost estimating model. It is validated that this process and model have the applicability through the case study of the construction cost estimating of the mine-warfare ship.