• Title/Summary/Keyword: Manufacturing Site

Search Result 465, Processing Time 0.024 seconds

Manufacturing Technology of a Set of Iron Bit from Eonnam-ri Site (언남리유적 철제재갈의 제작기술)

  • Chung, Kwang-Yong;Yi, Su-Hee;Seong, Hee-Won
    • 보존과학연구
    • /
    • s.26
    • /
    • pp.41-56
    • /
    • 2005
  • A set of horse bit from the Eonnam-ri site consists of three parts, pyo , ham , andinsu , and each part takes a shape of a piece of bar. According to current typological study, the pyo is S type, the insu is two-braided line type, and the outer rim of the ham is double rim type, respectively. According to X-ray test, inlaid design seems to have been decorated on the whole surface of the iron bit, originally. However, inlaid pattern partially remained. While the part of bit stopper is designed with flame pattern, the part of rein joint is designed with cloud pattern. According to XRF and XGT analysis of inlaid material, the content of silver is not more than 50%. The line inlay method making grooves on the surface of iron, then in laying a silver thread into them, and grinding the surface in a direction was adoptedin the manufacture of the iron bit.

  • PDF

Analysis of Technical Requirement for Implementation of Multi-trade Prefabrication (Multi-trade Prefabrication 기법 적용을 위한 기술적 요구사항 분석)

  • Jang, Se-Jun;Lee, Ghang
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2016.05a
    • /
    • pp.113-114
    • /
    • 2016
  • This paper proposes a technical requirements analysis of implementation of multi-trade prefabrication. Recently, there has been a rise in the use of prefabrication to minimize on-site work for time reduction to increase productivity. Prefabrication technique is evolved into multi-trade prefabrication combining other trades from single-trade prefabrication. For implementation of new technique, not only itself but complementary techniques have to be prepared. In this paper, MEP corridor rack, a major item of multi-trade prefabrication, was implemented in the test bed and its process was analyzed to find out technical requirements. As a result, comparatively high level of IT technique was required for efficient use of multi-trade prefabrication in design, lifting and construction phase. In design phase, component level of BIM library was needed for manufacturing; and in lifting phase, BIM-based site logistics process was required. Also in construction phase, laser scanning was implemented for gathering shape and geometry of the wall and slab that were attached to multi-trade prefabrication module.

  • PDF

Application of Logistic Simulation for Transport of SFs From Kori Site to an Assumed Interim Storage Facility

  • Kim, Young-Min;Kim, Chang-Lak
    • Journal of Nuclear Fuel Cycle and Waste Technology(JNFCWT)
    • /
    • v.19 no.1
    • /
    • pp.61-74
    • /
    • 2021
  • A paradigm shift in the government's energy policy was reflected in its declaration of early closure of old nuclear plants as well as cancellation of plans for the construction of new plants. To this end, unit 1 of Kori Nuclear Power Plant was permanently shut down and is set for decommission. Based on these changes, the off-site transport of spent fuels from nuclear power plants has become a critical issue. The purpose of this study is to develop an optimized method for transportation of spent fuels from Kori Nuclear Power Plant's units 1, 2, 3, and 4 to an assumed interim storage facility by simulating the scenarios using the Flexsim software, which is widely used in logistics and manufacturing applications. The results of the simulation suggest that the optimized transport methods may contribute to the development of delivery schedule of spent fuels in the near future. Furthermore, these methods can be applied to decommissioning plan of nuclear power plants.

Nonlinear Behavior Analysis of Connections Between Modular Units Using Connecting Steel Plate (연결 강판을 이용한 모듈러 유닛 간 접합부의 비선형 거동 해석)

  • Kim, Hyeon-Gu;Yoo, Jung-Han
    • Journal of Korean Association for Spatial Structures
    • /
    • v.23 no.2
    • /
    • pp.45-52
    • /
    • 2023
  • Modular construction is an economical and efficient construction that reduces time and costs by manufacturing units in factories and constructing them on site. Currently, the demand for modular construction is increasing not only abroad but also domestically. As the demand for modular construction increases, a lot of development and research on connections between modular units are being conducted. Connections between modular units should be quick and simple to assemble when assembling units on site, and should be in a form that allows each unit to be connected regardless of direction. In addition, it must be able to exert sufficient strength against external loads. In this study, a connection between modular units using connecting steel plates and bolts was proposed, and the nonlinear behavior of the connection to external lateral force was analyzed through finite element analysis, and resistance performance was evaluated.

A Study on the Proposal of Passive Precast Concrete Modular Housing Development Plan in the Middle East such as Saudi Arabia (사우디 등 중동지역의 패시브형 PC모듈러 주택개발 방안 제안)

  • Lim, Seok-Ho;Chung, Joon-Soo;Yang, Hyeon-Jeong
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2023.05a
    • /
    • pp.121-122
    • /
    • 2023
  • Existing modular research has been mainly focused on S (shelter structure) and I (infill interior finishing material), and considerable research has been conducted, and the results are being proposed. However, in the case of the rest (exterior materials and windows, etc.), existing construction methods and materials are borrowed, and supporting hardware members and insulation materials are constructed on site, which acts as a factor hindering overall shortening of the construction period. That is, since the advantages and characteristics of modularity cannot be utilized in the absence of modular cladding, manufacturing of cladding is required. Therefore, it is necessary to develop a cladding system that can drastically reduce the construction period in factories while considering the structural characteristics of PC modulars.

  • PDF

OFF-SITE MANUFACTURE OF APARTMENT BUILDINGS

  • Neville Boyd
    • International conference on construction engineering and project management
    • /
    • 2011.02a
    • /
    • pp.304-310
    • /
    • 2011
  • The populations of major cities in Australia are increasing rapidly and facing an acute housing shortage. Traditional apartment procurement techniques involve lengthy lead-times and factory-based, or offsite manufactured (OSM) multi-storey apartment buildings may offer the opportunity to help fulfill the need by significantly reducing build times. Other advantages of OSM may include superior quality, low weight ratios, economies of scale achieved through repetition of prefabricated units, use on infill sites, sustainable design standards and better occupational health and safety. There are also positive labour and training implications, which may help to alleviate an industry-wide shortage of skills through use of semi-skilled labour. Previous uncertainties about the adoption of offsite due to the high capital costs and perception issues were generally based on pre-cast concrete structures, which are quite a different building type in terms of flexibility, construction, delivery and finishes. Identification of drivers and constraints assists in the determination of current industry status, allows for a benchmark to be established and future opportunities and directions for OSM to be determined.

  • PDF

Comparison of Relative Risk before and after SEMI S2-93A Implementation: Using a Semiconductor Plant in a Taiwan's Science Park as an Example

  • Tien, Shiaw-Wen;Chung, Yi-Chan;Tsai, Chihj-Hung;Hwang, Guo-Ji
    • International Journal of Quality Innovation
    • /
    • v.6 no.1
    • /
    • pp.58-73
    • /
    • 2005
  • The objective of this study is to evaluate the equipment risk before and after SEMI S2-93A implementation, thus providing a guideline for safety improvement. Semiconductor Plant A located in Taiwan's Hsinchu Science Based Industrial Park with 147 manufacturing machines was used for risk assessment. This study was carried out in three steps. First, a preliminary hazard analysis was conducted. A detailed process safety evaluation was conducted (Hazard and Operability Study, HAZOP); and finally, the equipment risk comparison before and after Semiconductor Equipment Manufacturing Instruction (SEMI S2-93A) implementation. The preliminary hazard analysis results showed high risk in 21.77% of the manufacturing machines under risk assessment at Plant A. The largest percentage existed in the Diffusion Department. The machine types specified by the hazardous work site review and inspection according to Article 26 of Labor Inspection Regulation (the machines that use such chemicals as, $SiH_4$, HF, HCL, etc. and that are determined to be highly hazardous through preliminary hazard analysis) were added to the detailed process analysis and evaluation. In the third part of this evaluation, the machines at Plant A used for detailed process safety assessment were divided into two groups based on the manufacturing data before and after 1993. The severity, possibility, and actual accident analysis before and after SEMI S2-93A implementation were compared. The Semiconductor Equipment Manufacturing Instruction (SEMI S2-93A) implementation can reduce the severity and possibility of hazard occurrence.

The Case of CM as Applied to the Pre Design Phase - Focused on the Case of YongJu New Tobacco Manufacturing Plant - (설계 전 단계에서의 CM 적용 사례 - 영주 신 제조창 CM 사례를 중심으로 -)

  • Park Yong-Jun
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.19-26
    • /
    • 2003
  • In the face of the deterioration of tobacco manufacturing plant, we've got the plan for now manufacturing factory for the competitiveness, modernization, rationalization and environment. To achieve the goals, it was necessary to plan and investigate in the early stage of project. Consequently. We determined to introduce the CM in the early stage. We Performed the whole phase of CM services front the pre design phase services like feasibility analysis of site and building, plant master plan, selection of manufacturing facilities and drawing up the RFP, to maintenance management phase after the completion of a construction work. Contrary to the another CM projects, YongJu New Tobacco Manufacturing Plant CM organized the CM team with expert in field before the design development. This study analyze and evaluate the CM services of YongJu project which performed on the pre design phase. The purpose of this study is to emphasize the importance of pre design phase CM and support that CM services will start from the pre design phase.

  • PDF

Ecotoxicity Assessment of Industrial Effluent in Korea (산업폐수 방류수의 생태독성 평가)

  • Oh, Kyung Taek;Kim, Ji Won;Kim, Woo Kun;Lee, Soon Ae;Yun, Hong Gil;Lee, Sung Kyu
    • Journal of Korean Society on Water Environment
    • /
    • v.22 no.1
    • /
    • pp.37-44
    • /
    • 2006
  • Ecotoxicity assessments of 90 selected effluents of 22 industry types from 2002 to 2004 in Korea were evaluated by a toxic battery of bioassay test using fish Oryzias latipes, invertebrate Daphnia magna, algae Selenastrum capricornutum and bacteria Vibrio fischeri with the physicochemical measurement items and permit concentrations on the present Water Quality Conservation Act in Korea. Total toxic unit (${\Sigma}TU$) of 8 industry types of 22 industry types by the toxic battery appeared in order of the value site as follows; Pigment Dye Manufacturing (${\Sigma}TU$ 217.1) > Textile and Dye (${\Sigma}TU$ 39.3) > Semiconductor Electronic Manufacturing (Small) (${\Sigma}TU$ 25.6) > Wastewater and Sewage Treatment Plants (${\Sigma}TU$ 25.4) > Coating (${\Sigma}TU$ 23.8) > Leather Skin Manufacturing (${\Sigma}TU$ 18.0) > Synthetic Resin Manufacturing (${\Sigma}TU$ 15.6) > Assemble Metal Manufacturing (${\Sigma}TU$ 10.7). Our results demonstrate that ecotoxicity assessment, by bioassay test, is effective and practical for industrial wastewater management for 90 selected effluents with the limitation of the physicochemical permit. Among 90 effluents, 9 samples failed physicochemical permit limitation and 81 passed it. In result of ecotoxicity assessment of 90 effluents by the toxic battery, 76 effluents exhibited ecotoxicity and the others did not. The physicochemical measurement items and permit concentrations on the present Water Quality Conservation Act in Korea were low related to the ecotoxicity value by the toxic battery and appeared limited for water quality management to water-ecosystem and environment-friendly management of water.

Design and Implementation of Smart Factory System based on Manufacturing Data for Cosmetic Industry (화장품 제조업을 위한 제조데이터 기반의 스마트팩토리 시스템의 설계 및 구현)

  • Oh, Sewon;Jeong, Jongpil;Park, Jungsoo
    • The Journal of the Institute of Internet, Broadcasting and Communication
    • /
    • v.21 no.1
    • /
    • pp.149-162
    • /
    • 2021
  • This paper established a new smart factory based on manufacturing data for an introductory company focusing on the personalized cosmetics manufacturing industry. We build on an example of a system that collects, manages, and analyzes documents and data that were previously managed by CGMP-based analog for data-driven use. To this end, we have established a system that can collect all data in real time at the production site by introducing artificial intelligence smart factory platform LINK5 MOS and POP system, collecting PLC data, and introducing monitoring system and pin board. It also aims to create a new business cluster space based on this project.