• 제목/요약/키워드: Manufacturing Cycle Time

검색결과 264건 처리시간 0.026초

조립생산에 있어서 주기시간과 라인평형 지연관계에 관한 연구 (A Study on the Relationship between Cycle Time and Balance Delay)

  • 박명규
    • 산업경영시스템학회지
    • /
    • 제5권7호
    • /
    • pp.17-24
    • /
    • 1982
  • Most line balancing technique widely used in manufacturing industry is done by balancing to a cycle or operator, time determined to provide the exact number of required units per day. No thought is given to benefit foregone by making slight changes to cycle time to achieve better distribution of the work among operators. This study provides a method to minimize balance delay by the choice of cycle time.

  • PDF

Conformal Cooling Channel 의 구조물 제작 (Conformal Cooling Channel Manufacturing for the Die)

  • 이창우;서정훈;우성식;김대중
    • 한국정밀공학회:학술대회논문집
    • /
    • 한국정밀공학회 2005년도 춘계학술대회 논문집
    • /
    • pp.1761-1765
    • /
    • 2005
  • The plastic injection molding industry is increasing pressure to reduce the cycle time in order to improve the productivity. The time of a cooling die is a large part of the cycle time. The conformal cooling channels can reduce the cooling time effectively as compared with conventional production die. It is hard to make the die with a conformal cooling channel by the conventional method. This paper introduces the method of a conformal cooling channel manufacturing by the DMT (Direct Metal Tooling) that is a new technology.

  • PDF

Applying a Life-Cycle Assessment to the Ultra Pure Water Process of Semiconductor Manufacturing

  • Tien, Shiaw-Wen;Chung, Yi-Chan;Tsai, Chih-Hung;Yang, Yung-Kuang;Wu, Min-Chi
    • International Journal of Quality Innovation
    • /
    • 제6권3호
    • /
    • pp.173-189
    • /
    • 2005
  • A life-cycle assessment (LCA) is based on the attention given to the environmental protection and concerning the possible impact while producing, making, and consuming products. It includes all environmental concerns and the potential impact of a product's life cycle from raw material procurement, manufacturing, usage, and disposal (that is, from cradle to grave). This study assesses the environmental impact of the ultra pure water process of semiconductor manufacturing by a life-cycle assessment in order to point out the heavy environmental impact process for industry when attempting a balanced point between production and environmental protection. The main purpose of this research is studying the development and application of this technology by setting the ultra pure water of semiconductor manufacturing as a target. We evaluate the environmental impact of the Precoat filter process and the Cation/Anion (C/A) filter process of an ultra pure water manufacturing process. The difference is filter material used produces different water quality and waste material, and has a significant, different environmental influence. Finally, we calculate the cost by engineering economics so as to analyze deeply the minimized environmental impact and suitable process that can be accepted by industry. The structure of this study is mainly combined with a life-cycle assessment by implementing analysis software, using SimaPro as a tool. We clearly understand the environmental impact of ultra pure water of semiconductor used and provide a promotion alternative to the heavy environmental impact items by calculating the environmental impact during a life cycle. At the same time, we specify the cost of reducing the environmental impact by a life-cycle cost analysis.

Direct 반송방식에 기반을 둔 300mm FAB Line 시뮬레이션 (Direct Carrier System Based 300mm FAB Line Simulation)

  • 이홍순;한영신;이칠기
    • 한국시뮬레이션학회논문지
    • /
    • 제15권2호
    • /
    • pp.51-57
    • /
    • 2006
  • 현재 반도체 산업은 200mm 웨이퍼에서 300mm 웨이퍼 공정으로 기술이 변화하고 있다. 300mm 웨이퍼 제조업체들은 Fabrication Line (FAB Line) 자동화를 비용절감 실현의 방책으로 사용하고 있다. 또한 기술의 확산, 시장 경쟁력의 격화 등으로 생산성 향상에 의한 원가절감이 반도체 산업 성장의 근본요인이 되고 있다. 대부분의 반도체 업체들은 생산성을 높이기 위해 average cycle time을 줄이는데 총력을 기울이고 있다. 본 논문에서는 average cycle time을 줄이는 데 중점을 두고, 300mm 반도체 제조공정을 시뮬레이션 하였다.

  • PDF

티타늄 난삭재의 탭핑 가공 특성 (Tapping Machining Characteristics of Titanium Hard-to-Cut Material)

  • 이호창;김해지;김남경
    • 한국기계가공학회지
    • /
    • 제10권1호
    • /
    • pp.80-86
    • /
    • 2011
  • This study compared and analyzed manual tapping and automatic tapping regarding tapping process characteristics of titanium hard-to-cut-material. Tapping process characteristics of titanium hard-to-cut-material are evaluated as the quality of a screw, wear of a tap, economic analysis, and cycle time etc. The type of screw threads after manual tapping is formed as an irregular type of screw threads, and perfect screw threads are created after automatic tapping. In addition, the chip type after manual tapping process is formed as the discontinuous chip due to work hardening, and the powder type of chip after automatic tapping process is created. In terms of cycle time, an automatic tapping process is shortened by 70% compared to manual tapping process. Insert tip wear of an automatic tapping shown in the process of 5-hole tapping is not found, but hand tap wear for finish cutting is most severe.

On optimal cyclic scheduling for a flexible manufacturing cell

  • Kise, Hiroshi;Nakamura, Shinji;Karuno, Yoshiyuki
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 제어로봇시스템학회 1990년도 한국자동제어학술회의논문집(국제학술편); KOEX, Seoul; 26-27 Oct. 1990
    • /
    • pp.1250-1255
    • /
    • 1990
  • This paper discusses an optimal cyclic scheduling problem for a FMC (Flexible Manufacturing Cell) modeled by a two-machine flowshop with two machining centers with APC's (Automated Pallet Changers), an AGV (Automated Guided Vehicle) and loading and unloading stations. Cyclic production in which similar patterns of production is repeated can significantly reduce the production lead-time and WIP (Work-In-Process) in such flexible, automated system. Thus we want to find an optimal cyclic schedule that minimizes the cycle time in each cycle. However, the existence of APC's as buffer storage for WIP makes the problem intractable (i.e., NP-complete). We propose an practical approximation algorithm that minimizes, instead of each cycle time, its upper bound. Performances of this algorithm are validated by the way of computer simulations.

  • PDF

차량용 플라스틱 혼 커버의 사출성형 싸이클 타임 개선을 위한 냉각 채널의 수치해석 연구 (Numerical Analysis of Cooling Channels for Injection Molding Cycle Time Improvement of Plastic Horn Cover for an Automobile)

  • 한성렬
    • 한국기계가공학회지
    • /
    • 제17권5호
    • /
    • pp.84-90
    • /
    • 2018
  • When producing a plastic horn cover for an automobile, since the interval between the ribs on the inner surface is narrow, conventional cooling channels cannot be applied and cooling of the mold is difficult. For this reason, the molding operation cannot be completed within a set cycle time. In this study, a conformal cooling channel was applied on the mold to solve the cooling problem. Injection molding simulation was carried out to confirm the effectiveness of the conformal cooling channel. In the analysis results, the mold temperature at the rib section decreased by 33%, and the mold temperature also decreased by 31%. This reduction in temperature allowed for molding within a set cycle time and demonstrated the effectiveness of the conformal cooling channel.

낮은 교통밀도 하에서 서버 고장을 고려한 복수 서버 대기행렬 모형의 체제시간에 대한 분석 (On the Exact Cycle Time of Failure Prone Multiserver Queueing Model Operating in Low Loading)

  • 김우성;임대은
    • 산업경영시스템학회지
    • /
    • 제39권2호
    • /
    • pp.1-10
    • /
    • 2016
  • In this paper, we present a new way to derive the mean cycle time of the G/G/m failure prone queue when the loading of the system approaches to zero. The loading is the relative ratio of the arrival rate to the service rate multiplied by the number of servers. The system with low loading means the busy fraction of the system is low. The queueing system with low loading can be found in the semiconductor manufacturing process. Cluster tools in semiconductor manufacturing need a setup whenever the types of two successive lots are different. To setup a cluster tool, all wafers of preceding lot should be removed. Then, the waiting time of the next lot is zero excluding the setup time. This kind of situation can be regarded as the system with low loading. By employing absorbing Markov chain model and renewal theory, we propose a new way to derive the exact mean cycle time. In addition, using the proposed method, we present the cycle times of other types of queueing systems. For a queueing model with phase type service time distribution, we can obtain a two dimensional Markov chain model, which leads us to calculate the exact cycle time. The results also can be applied to a queueing model with batch arrivals. Our results can be employed to test the accuracy of existing or newly developed approximation methods. Furthermore, we provide intuitive interpretations to the results regarding the expected waiting time. The intuitive interpretations can be used to understand logically the characteristics of systems with low loading.

절삭가공물의 생산 시간 추정 (Estimation of Manufacturing Time for Machined Parts)

  • 김강
    • 한국공작기계학회논문집
    • /
    • 제12권4호
    • /
    • pp.1-8
    • /
    • 2003
  • It is well known that design cost is only about 5% of final product cost but over 70% of it is determined during design stage. Earlier in the product design and development cycle the design changes occur, more economic they become. Therefore, it is recommended that the manufacturing time and cost of product are considered in steps involved in designing and manufacturing a product as early as possible. In this study, it is proposed a possible way that cm be available for estimating manufacturing time of parts, which are manufactured by conventional material removal processes (e.g. turning, milling and drilling). For it to be useful in the early design stage, the minimum number of informations on dimension shape, and design features of part will be used in this method.

쌍 체임버 기반 장비의 로드락 구성에 따른 생산성 분석 (Throughput Analysis of the Twin Chamber Platform Equipment according to the Load-lock Configuration)

  • 홍주표;이기석
    • 반도체디스플레이기술학회지
    • /
    • 제7권2호
    • /
    • pp.39-43
    • /
    • 2008
  • Productivity is one of the performance indices of the semiconductor equipment in manufacturing viewpoint. Among many ways tried and adopted for improvement of the productivity of the FAB equipment, variation of equipment configuration was considered and its effect on the throughput was analyzed. Parallel machine cycle charts that were generated based on the equipment log were used in the analysis. Efficiency of the equipment due to change of the structure and the probability of the usage in the manufacturing process were examined. The results showed that the modification of the control algorithm in the equipment and the redistribution of the process time for each process and transfer module along to the change in the structure enhance the throughput of the equipment.

  • PDF