International conference on construction engineering and project management
/
2015.10a
/
pp.738-739
/
2015
The main objective of this study, "Spatial Downscaling of Precipitation from GCMs for Assessing Climate Change over Han River and Imjin River Watersheds", is to carry out over Han River and Imjin River watersheds. To this end, a statistical regression method with MOS (Model Output Statistics) corrections at every downscaling step was developed and applied for downscaling the spatially-coarse Global Climate Model Projections (GCMPs) from CCSM3 and CSIRO with respect to precipitation into 0.1 degree (about 11 km) spatial grid over study regions. The spatially archived hydro-climate data sets such as Willmott, GsMap and APHRODITE datasets were used for MOS corrections by means of monthly climatology between observations and downscaled values. Precipitation values downscaled in this study were validated against ground observations and then future climate simulation results on precipitation were evaluated for the projections.
Journal of the Korean association of regional geographers
/
v.20
no.2
/
pp.176-188
/
2014
Since the late 1990s, a nationwide movement against dam and river-mouth weir plans in Japan has been promoted with a movement against a river-mouth weir for the Nagara river(長良川). This movement has been a catalyst for institutional frameworks on the central government's dam and river-mouth weir plans. Subsequently, water resource and river management policies have entered a new phase, with provinces governors's participation in "Statements on withdrawal from dam and river-mouth weir" as well as the seizing of power by the Democratic Party. However, problems with dams and river-mouth weirs have been confused due to poor countermeasures from the Democratic Party and to the Liberal Democratic Party(LDP)'s return to power. The fundamental causes on this situation are the non-establishment of fiscal norms for public projects and the rigidity of the water-right allocation system in Jananese policy-making processes. To successfully settle future policy on water resources and rivers, the first priority is to prepare specific institutional frameworks on finance of public projects and to organize a practical policy coordination system among government organizations. These policy tasks provide implications for river and water management policy in Korea.
The Tumen River basin is relatively small(${\approx}33,000km^2$), it has many potential conflicts between the riparian countries. Especially, until recently, it could have not drawn the socio-potitical attention from its central governments because of the geopolitical unique characteristics as edges of mainlands. since 1990's the various plans have been suggested for resolving the problems in this area as an international attention from, e.g UNDP, began to be given. However, the international cooperative structure has not been established in systematic way which has paramount importance. In the research, based on the problems identified in the previous paper, the necessities for independent unit, so called 'Tumen River Watershed Management Commission' were suggested for holistic and hierarchical resolution in accordance with integrated management and international river based on 'limited territory sovereignty' which is a general principle in international river management. For this purposes, hierarchical problem solving approach which consists of 3 phases were developed. They include major objectives and behavioral guidelines for achieving equity between riparian countries based on international cooperation and integrated watershed management as fundamental concept. In conclusion, rational plan for future water use, management and primary framework of Tumen River for international cooperation were composed and strategic approach for the North-East Asian community foundation was suggested.
Jung, Kang-Young;Lee, In Jung;Lee, Kyung-Lak;Cheon, Se-Uk;Hong, Jun Young;Ahn, Jung-Min
Journal of Environmental Science International
/
v.25
no.2
/
pp.217-229
/
2016
The government has conducted a plan of total maximum daily loads(TMDL), which divides with unit watershed, for management of stable water quality target by setting the permitted total amount of the pollutant. In this study, BOD concentration trends over the last 10 years from 2005 to 2014 were analyzed in the Geumho river. Improvement effect of water quality throughout the implementation period of TMDL was evaluated using the seasonal Mann-Kendall test and a LOWESS(locally weighted scatter plot smoother) smooth. As a study result of the seasonal Mann-Kendall test and the LOWESS smooth, BOD concentration in the Geumho river appeared to have been reduced or held at a constant. As a result of quantitatively analysis for BOD concentration with exploratory data analysis(EDA), the mean and the median of BOD concentration appeared in the order of GH8 > GH7 > GH6 > GH5 > GH4 > GH3 > GH2 > GH1. The monthly average concentration of BOD appeared in the order of Apr > Mar > Feb >May > Jun > Jul > Jan > Aug > Sep > Dec > Nov > Oct. As a result of the outlier, its value was the most frequent in February, which is estimated 1.5 times more than July, and was smallest frequent in July. The outlier in terms of water quality management is necessary in order to establish a management plan for the contaminants in watershed.
KSCE Journal of Civil and Environmental Engineering Research
/
v.34
no.1
/
pp.155-165
/
2014
In this study, using a complex of physical, chemical, and biological evaluation factors, the ecological vulnerability to climate change were evaluated at each river in the Nakdong river basin. First, runoff, sediment rate, and low flow discharge changes according to AIB climate change scenario using the SWAT model were simulated. Also, for the assessment of chemical and biological factors, 48 points that water quality monitoring sites and ecological health measurement points are matched with each other was selected. The water quality data of BOD and T-P and the biological data of IBI and KSI in each point were reflected in the assessment. Also, the future rise in water temperature of the rivers in Nakdong river basin was predicted, and the impact of water temperature rise on the fish habitat was evaluated. The top 10 most vulnerable points was presented through a summary of each evaluation factor. This study has a contribution to river restoration or management plan according to the characteristics of each river.
Journal of Korean Society of Environmental Engineers
/
v.38
no.10
/
pp.558-565
/
2016
Water quality data including flow rates and BOD/COD/T-N/T-P/SS/TOC concentrations in Nakdong river tributaries were analyzed to determine priority management areas using 699 data sets from 195 locations in 2015. It was pointed out that the coefficients of variation, the ratio of the standard deviation to the mean, for the concentrations and loading rates of BOD, T-P, and TOC in each monitoring location were so large that average values of water quality monitoring data might be not appropriate to determine the priority management areas among all 195 monitoring stations in Nakdoing river. Therefore we suggested two evaluation methods using each water quality data independently. In the first method the excess numbers of the BOD, T-P, and TOC concentrations comparing to the water quality standards in the medium-sized management areas in Nakdong river was evaluated for each monitoring station. In the second method the percentile ranks of the loading rates of the BOD, T-P, and TOC were obtained for each monitoring data. The two groups of the priority management areas determined by each method were compared and the water quality characteristics in Nakdoing river were investigated.
Proceedings of the Korea Water Resources Association Conference
/
2008.05a
/
pp.389-394
/
2008
The purpose of this research was to develop a methodology to determine whether conjunctive surface water and groundwater management could significantly reduce deficits in a river basin with a relatively limited alluvial aquifer. The Geum River basin is one of major river basins in South Korea. The upper region of the Geum River basin is typical of many river basins in Korea where the shape of river basin is narrow with small alluvial aquifer depths from 10m to 20m and where most of the groundwater pumped comes quickly from the steamflow. The basin has two surface reservoirs, Daecheong and Yongdam. The most recent reservoir, Yongdam, provides water to a trans-basin diversion, and therefore reduces the water resources available in the Geum River basin. After the completion of Yongdam reservoir, the reduced water supply in the Geum basin resulted in increasing conflicts between downstream water needs and required instream flows, particularly during the low flow season. Historically, the operation of groundwater pumping has had limited control and is administered separately from surface water diversions. Given the limited size of the alluvial aquifer, it is apparent that groundwater pumping is essentially taking its water from the stream. Therefore, the operation of the surface water withdrawals and groundwater pumping must be considered together. The major component of the conjunction water management in this study is a goal-programmin g based optimization model that simultaneously considers surface water withdrawals, groundwater pumping and instream flow requirements. A 10-day time step is used in the model. The interactions between groundwater pumping and the stream are handled through the use of response and lag coefficients. The impacts of pumping on streamflow are considered for multiple time periods. The model is formulated as a linear goal-programming problem that is solved with the commercial LINGO optimization software package.
In order to establish water quality management planning in some watershed, water quality of the future of the watershed should be predicted first. The Yongsan river various pollutant sources ; sewage, industry, livestock, farming and so on. And pollutants from these sources are likely to increase even though a number of publicly owned treatment works(POTWs) are founded. Therefore, it is estimated that water quality if the river would be even worse than now in near future. In this study, water quality of the future(2001, 2006) on the Yongsan river was simulated with QUAL2E model. Concentration of three water quality parameters(BOD, T-N, T-P) was predicted according to dry season, low flow season, average flow season of the river with and without POTWs. The results of this study showed the significant contrast in concentration between with and without POTWs, specially in terms of T-N and T-P. Therefore, POTWs must be founded around the Yongsan river and more advanced treatment should be considered. And because these parameters are mostly affected by polluants from upper watershed, including Kwangiudcheon, water quality management planning on the Yongsan river might be focused on this area.
Journal of the Korean Society of Hazard Mitigation
/
v.2
no.4
s.7
/
pp.69-75
/
2002
In this paper the development of a real time river water quality management system is described. This system can manage a river water quality fluctuation by finding out abnormal conditions quickly and exactly. The GIS based monitoring system collects various properties of river water quality through the wireless real time network. Tanchun, the first branch of the Han River was selected as the target basin of the system development. This system is composed of three parts - wireless real time field measuring system with a GPS receiver, a server computer and a GIS platform. After the first field test in Tanchun basin, the result showed the many possibilities of measuring various water quality properties in real time and storing the data and analyzing them within the GIS environment in real time in very efficient manners. It is expected that the developed system will contribute to the efficient management of a river water quality control and water quality related disaster prevention purposes.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.