• Title/Summary/Keyword: Management Works on Site

Search Result 148, Processing Time 0.025 seconds

A Study on Productivity Analysis of Quality Management System in Construction Site (건설현장 품질관리 자동화 시스템의 생산성 분석에 관한 연구)

  • Choi, Yeongjun;Oh, Hyunchul;Baek, Kihyun;Kim, Seok
    • Korean Journal of Construction Engineering and Management
    • /
    • v.25 no.3
    • /
    • pp.17-26
    • /
    • 2024
  • Quality management work at construction sites demands substantial time and effort, involving the preparation of documents in Excel, approval processes, and the execution of quality tests. These Excel-based tasks include printing quality test reports, performing quality tests, generating and approving test reports, and preparing management ledgers. This division of processes extends the duration of work and diminishes efficiency. Accordingly, a cloud-based construction site quality management system was developed to enhance the productivity of quality management work. The purpose of this study is to analyze the productivity of the construction site quality management system, which is in the early stages of implementation at construction sites. This study implemented the construction site quality management system at a road construction site and scrutinized subsequent alterations in the quality management workflow before and after the implementation. Additionally, a survey was conducted among quality control engineers to collect data on work time both before and after the introduction of the construction site quality management system. Based on the collected data, the Monte-Carlo simulation method was applied to analyze the productivity improvement effect of the construction site quality management system, and the results were presented. The results of this study can serve as foundational data for future research endeavors focused on the automation of quality management works.

A Study on the Research & Analysis of the Health and Safety Managing's Understanding on the Applied Construction Work Site Risk Assessment - Focus on Site Manager & Manager - (건설업 위험성평가 적용사업장 종사자 안전보건 인식도 조사 연구 -사업장책임자 및 관리감독자를 중심으로-)

  • Choi, Soo-Hwan;Kim, Chi-Kyung
    • Journal of the Korean Society of Safety
    • /
    • v.27 no.4
    • /
    • pp.62-67
    • /
    • 2012
  • Risk Assessment, a basis of health and safety management system, is an calamity prevention activity which regularly measure the level of a risk to passively improve potential hazard. A problem, the assessment not being improved to be applied to the construction work site where requires diversity and complexity, causes the assessment to be inefficient to bring quality results. A study on the investigates and compares the surveyed degree of recognitions of workers who works in companies executing the risk assessment By the investigation and comparison, it is expected to bring the better solution for early and efficient application for those companies which are not taking the risk assessment.

Claim Management during Construction based on Key Claim Management Factors (클레임 핵심관리요인을 기반으로 한 건설공사 중의 클레임 관리)

  • Lee, Jun-Hyung;Lee, Hyun-Soo;Park, Moon-Seo;Kim, In-Ho
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.463-468
    • /
    • 2007
  • The disputes in construction projects are very important issue for stakeholders. However, many of presented claims have not received the compensation money required, and frequently turned down. The most cause is that the claims are not managed systemically on construction. Therefore, it is important to identify which management works are conducted on construction and how significantly do they relevant to construction claim. This research derives key claim management factors through analyzing causes for claim success and failure, and then presents management works relevant to them. This research also proposes the method for effective claim management and its expected effect through expert interview.

  • PDF

Productivity Measurement and Analysis on Factors in Steel Erection (철골세우기의 현장생산성 측정 및 영향요인 분석)

  • Lee, Ji-Yong;Huh, Young Ki;Ahn, Bang Ryul
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2008.11a
    • /
    • pp.123-127
    • /
    • 2008
  • As buildings becoming higher and more enormous the portion of steel works has been increased, which makes the schedule planning and management more significant. However, in actual construction sites, management is more based on a manager's construction experience than productivity data accumulated in previous projects. Moreover, most of the existing studies also featured a theoretical approach rather than an analysis of data straightforwardly collected in sites. In this study, a steel-erection site was visited to collect productivity data. The study found that there were significant disparities between aboveground work productivity and underground work. However, the productivities of 'first node on ground' and 'second node on ground' were estimated similar. The productivity data collected and factors affecting the productivity will help managers to plan and control their similar steel-erection works. This study will also be beneficial for those performing related studies.

  • PDF

Development of Unique Registration Number System for Construction Site Integrated DB (건설 통합DB 구축을 위한 시공현장등록번호 체계 개발)

  • Hur, Youn Kyoung;Lee, Seung Woo;Yoo, Wi Sung;Kim, Sung Hwan;Sung, Yookyung
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2023.05a
    • /
    • pp.367-368
    • /
    • 2023
  • Kiscon, Seumteo, KONEPS and CSI are representative construction-related DBs. All four DBs are operated by the public. However, the characteristics of data are different depending on the purpose. Therefore, it is difficult to utilize integrated data and it is only used sparingly. Creating and sharing a unique key that can identify a construction site will enable integrated accumulation and management of construction-related data for various purposes. At this point, it is most efficient to assign a unique key based on KISCON. KISCOn data conforms to the construction site definition and covers most of the public, private, architectural and civil works. In addition, there is an advantage in that DB construction is performed in the construction situation, which is a relatively preceding process. In the future, it is necessary to create a practical construction site integrated DB through the production of an integrated key table containing linkage information of unique keys for site management, performance indicators, and statistics production.

  • PDF

PRODUCTIVITY PREDICTION MODEL BASED ON PRODUCTIVION INFLUENCING FACTORS: FOCUSED ON FORMWORK OF RESIDENTIAL BUILDING

  • Byungki Kwon;Hyun-soo Lee;Moonseo Park;Hyunsoo Kim
    • International conference on construction engineering and project management
    • /
    • 2011.02a
    • /
    • pp.58-65
    • /
    • 2011
  • Construction Productivity is one of the most important elements in construction management. It is used in construction process scheduling and cost management, which are significant sector in construction management. It is important to make appropriate schedule and monitor how works are done within schedule. But construction project contains uncertainty and inexactitude, modifying construction schedule is being an issue to manage construction works well. Even though prediction and monitoring of productivity can be principal activity, it is hard to predict productivity with manager's experience and a standard of estimate. A large number of factors influencing productivity, such as drawing, construction method, weather, labor, material, equipment, etc. But current calculation of productivity depends on empirical probability, not consider difference of each influencing factor. In this research, the aim is to present a productivity predicting regression model of form work, which includes effectiveness of influences factors. 5 variables existed inside form work are selected by interview and site research based on literature review of existed various productivity influencing factors. The effectiveness and correlation of productivity influencing factors are analyzed by statistical approach, and it is used to make productivity regression model. The finding of this research will improves monitoring and controlling of project schedule in construction phase.

  • PDF

Waste Elimination in Construction Process using Value Stream Analysis - Focused on Waste Elimination of Re-bar Works (가치흐름 분석을 통한 건설프로세스의 낭비제거 방안)

  • Mun Jeong-Mun;Kim Chang-Duk;Park Dong-Sik
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.416-421
    • /
    • 2001
  • The domestic reinforcement concrete works have mainly worked the process of re-bar fabrication/assembly on site and re-bar works affected by structural safety, durability, and schedule with form work. Accordingly, This study analyzes the process of re-bar fabrication/assembly on site to apply lean production principles to construction Value Stream Analysis(VSA) is analyzed into value-adding activity and non-value-adding activity on construction process through value analysis and Value Stream Mapping(VSM). In the results, non-value-adding activity generates waste such as the activity steps, labors, equipments, materials, time, and so on. Additionally, push-driven production is investigated making low productivity from the overproduction and so on. To resolve the problems in the process, The purpose of this paper eliminates waste factor through maximizing the value-adding activity generating value added and minimizing non-value adding activity. Particularly, it makes flow production and pull-driven production through minimizing work-in-process(WIP ).

  • PDF

Development of a PMIS Emphasizing On-Site Management Functions (현장 중심의 건설사업 관리시스템의 개발)

  • Shin Seung-Sik;Chun Jin-Yong;Kim Dae-Jin;Woo Sung-Kwon
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.545-548
    • /
    • 2003
  • In the past, there were problems in managing construction due to the lack of effective communication and sharing information between a constructor and an owner during construction works. To solve those problems, several major construction companies made great efforts to get a higher productivity through the systematic management, cumulating construction know-how. As a result of the endeavor, some of those companies developed the foundation of PMIS(Project Management Information System). However, it is thought that PMIS on the construction site was not effectively used in performing construction. Therefore, through the case of contractor's management system which is being used in 1-4 out field construction site in Incheon International Airport Rail of P construction company, this paper deals with the development of system supporting to the practical work of construction site and it'll provide to be the foundation of making effective PMIS.

  • PDF

Development of Web-based Mold manufacturing process monitoring & control system using G-code control (G-code control 을 이용한 웹 기반 금형 가공 공정 모니터링 &컨트롤 시스템 개발)

  • 김건희;최진화;전병철;조명우
    • Proceedings of the Korean Society of Precision Engineering Conference
    • /
    • 2004.10a
    • /
    • pp.269-272
    • /
    • 2004
  • The target of this paper is the development of Web-based monitoring & control system which is for effective and economic management of mold manufacturing process. This system has three module; G-code Control, Monitoring Module and Result analysis module. Also, as the environment of development is based on internet, this system which is possible to the remote site management of manufacturing process works on Web. To be possible to control the manufacturing monitoring by client, each module is made ActiveX control and is based on socket communication. This system makes the foundation which is possible to manage the mold manufacturing process efficiently from remote site by matching real-time monitoring with manufacturing process in factory using G-code control and displaying the result of manufacturing using Ch-CGI.

  • PDF

A study on hazard rate decrease plan in plant construction site by improving foreman's role (플랜트 건설현장의 작업반장 역할개선을 통한 위험율 저감방안 연구)

  • Eun, Nam-Gwon;Kim, Chang-Eun
    • Journal of the Korea Safety Management & Science
    • /
    • v.17 no.3
    • /
    • pp.33-44
    • /
    • 2015
  • Domestic plant construction sites have a tendency to become bigger, more various and complicated. Moreover frequency of industrial incident is increasing due to short project period, coexistence work condition and using heavy construction equipment. Installing safety facilities and safety training contribute to prevent incident. But mostly incident happens due to workers' unsafe action and wrong work method. Technically, it is very difficult for us to closely manage workers preventing incident. Therefore, the role of foreman who ordinarily works together with his workers is considered more important. Specific execution plan was drawn through industrial incident statistics from Ministry of Labor and questionnaire survey to interest parties(supervisor, safety staff and foreman). If foreman has raised sense of belonging and responsibility by conducting practical safety training for his workers, manages job site and receives proper compensation for these roles, it will be expected that it fully influences incident decrease.