• Title/Summary/Keyword: Management Failure

Search Result 2,514, Processing Time 0.028 seconds

An Exploratory Research for the Conceptualization Failure knowledge (실패지식의 개념화를 위한 탐색적 연구)

  • Shim, Hyungseok
    • Knowledge Management Research
    • /
    • v.12 no.4
    • /
    • pp.121-132
    • /
    • 2011
  • Failure, the research object, means situations when goals and their results are different, which has developed presenting various aspects from ancient times and modern times. Failure is a complex concept which essentially requires judgement, and also a relative concept which can be changed depending on how you set up time base and standard. There are four stages for failure study to have been developed from studying failure through historical facts to the approach of organizational theory and it has been studied by looking at the failure of an organization according to different categories such as a developmental stage, a type of business, a period and a course. Compared with success science, failure study has not been studied sufficiently and also the level of its analysis is low. Thus, since lessons of failure tend to repeat themselves instead of being didactically accumulated, there need more studies on this. This thesis identified the main cause of the failure through various studies regarding failure which have been conducted at home and abroad. What the main cause of the failure that more than three studies mentioned have in common was that it occurred because organizations concentrated on the inside without communicating with external environment. The key point of failure study is to analyze failure, utilize it as assets, and create a frame of failure management. This thesis focused on delivering fragmentary knowledge on failure study, but case studies regarding this subject should be done in the future.

  • PDF

A Risk Metric for Failure Cause in FMEA under Time-Dependent Failure Occurrence and Detection (FMEA에서 고장발생 및 탐지시간을 고려한 고장원인의 위험평가 척도)

  • Kwon, Hyuck Moo;Hong, Sung Hoon;Lee, Min Koo
    • Journal of Korean Society for Quality Management
    • /
    • v.47 no.3
    • /
    • pp.571-582
    • /
    • 2019
  • Purpose: To develop a risk metric for failure cause that can help determine the action priority of each failure cause in FMEA considering time sequence of cause- failure- detection. Methods: Assuming a quadratic loss function the unfulfilled mission period, a risk metric is obtained by deriving the failure time distribution. Results: The proposed risk metric has some reasonable properties for evaluating risk accompanied with a failure cause. Conclusion: The study may be applied to determining action priorities among all the failure causes in the FMEA sheet, requiring further studies for general situation of failure process.

FACTORS AFFECTING THE SUCCESS/FAILURE OF ROAD INFRASTRUCTURE PROJECTS UNDER PPP IN INDIA

  • Nallathiga, Ramakrishna;Shaikh, Haris D;Shaikh, Tauseef F;Sheik, Farhan A
    • Journal of Construction Engineering and Project Management
    • /
    • v.7 no.4
    • /
    • pp.1-12
    • /
    • 2017
  • India has accorded a high priority to road infrastructure development through Public-Private Partnership (PPP) and it has set a high target for investment inflows. Yet, it is widely held that road/highway infrastructure has not been developing at required pace and that the road infrastructure projects under PPP have been suffering from several hurdles and delays, thereby affecting project success/failure. This paper is an attempt to analyze the critical success/failure factors of road infrastructure projects under PPP in India. A questionnaire survey was conducted among a sample of the stakeholders of road infrastructure projects to identify the critical success/failure factors during all four major project stages using different approaches. Initially, the critical factors were identified through ranking based on the average/mean score. Later, the conventional RII score was used to identify the critical success/failure factors. Finally, the critical success/failure factors were also identified based on the stakeholder-wise ranking of the factors and their convergence. The assessment revealed that there was a greater convergence across the different methods and also that there was greater consensus among project stakeholder on the critical success/failure factors of road PPP projects.

PROPOSING MANAGEMENT OF WORK PRIORITY TO REDUCE CONSTRUCTION FAILURE CLAIMS

  • In-ho Kim;Moon-Seo Park;Hyun-Soo Lee
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.1171-1176
    • /
    • 2005
  • Dispute related to construction projects involving numerous persons is one of the biggest challenges faced by contractors today. It costs a substantial amount of money and time in resolving these kinds of claims. Recently, with the changes in the construction environment and thought of relation with owner, the number of construction claims has increased. But, a majority of these claims do not prevail, and in fact, frequently get dismissed in its entirety. The reasons for such dismissals include the ignorance about the claims, lack of clear and convincing evidence, and so on. But most of reasons are the claims are not managed well on construction process. This paper analyzes the failure causes by relying on past claim failure cases, and then drew works that have connection with failure causes through interview. It also presented importance degree of construction management works.

  • PDF

IDENTIFICATION OF SOME FAILURE COSTS AND THEIR PERCEIVED ROOT CAUSES IN CONSTRUCTION

  • Saad Al-Jibouri;Martijn Oude Vrielink
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.184-189
    • /
    • 2009
  • In 2008 the total estimated failure costs in the Netherlands was estimated to be 11.4% of the industry's turnover compared to 7.7% seven years earlier. Failure costs can be the consequence of rework as a result of failure to conform to the product requirements and specifications or due to inefficient processes and bad management practices. Many construction companies however are unaware of the exact nature of these costs, their root causes or how to control them. This paper describes work carried out in the Netherlands to identify the different types of failure costs in construction and their root causes. The research described builds on previous findings by another research institution and expands it to include information collected from project cases and a survey of a number of project managers in the construction industry. The paper describes the analysis of the results from cases and the survey to identify the root causes of failure costs. Research shows, for example, that many failure costs are related to the client taking late decisions and making changes to the project requirements.

  • PDF

Symptom Management to Predict Quality of Life in Patients with Heart Failure: A Structural Equation Modeling Approach (증상관리를 통한 심부전 환자의 삶의 질 예측모형)

  • Lee, Ja Ok;Song, Rhayun
    • Journal of Korean Academy of Nursing
    • /
    • v.45 no.6
    • /
    • pp.846-856
    • /
    • 2015
  • Purpose: The focus of this study was on symptom management to predict quality of life among individuals with heart failure. The theoretical model was constructed based on situation-specific theory of heart failure self-care and literature review. Methods: For participants, 241 outpatients at a university hospital were invited to the study from May 19 to July 30, 2014. Data were collected with structured questionnaires and analyzed using SPSSWIN and AMOS 20.0. Results: The goodness of fit index for the hypothetical model was .93, incremental fit index, .90, and comparative fit index, .90. As the outcomes satisfied the recommended level, the hypothetical model appeared to fit the data. Seven of the eight hypotheses selected for the hypothetical model were statistically significant. The predictors of symptom management, symptom management confidence and social support together explained 32% of the variance in quality of life. The 28% of variance in symptom management was explained by symptom recognition, heart failure knowledge and symptom management confidence. The 4% of variance in symptom management confidence was explained by social support. Conclusion: The hypothetical model of this study was confirmed to be adequate in explaining and predicting quality of life among patients with heart failure through symptom management. Effective strategies to improve quality of life among patients with heart failure should focus on symptom management. Symptom management can be enhanced by providing educational programs, encouraging social support and confidence, consequently improving quality of life among this population.

An Analysis of Critical Management Factors for Construction Failure on the Apartment Structural Framework using FMEA (FMEA 기법을 활용한 공동주택 골조공사의 건설실패 핵심관리요인 분석)

  • Oh, Chi-Don;Park, Chan-Sik
    • Korean Journal of Construction Engineering and Management
    • /
    • v.13 no.3
    • /
    • pp.78-88
    • /
    • 2012
  • Previous construction failure researches were focused on the utilization plan based on failure information and development of failure classification. However, it has limitation to set up the plan for prevention of construction failure due to the lack of the number of on-site staffs. In order to prevent effectively construction failure, a prevention plan should be established through quantitative evaluation of failure causes. The purpose of this study is to suggest the assessment method for selection Critical Management Factor(CMF) and to analyze the CMF on the apartment structural framework using FMEA(Failure Mode and Effective Analysis) which is one of the methods of quantitative evaluation. The element of risk evaluation separated degree of failure risk and prevention respectively. The assessment method for selection of CMF can be utilized for planning proactive solutions on the failure, and it can be also selected critical factors about each project phases, type of facility and construction work.

Strategic Cooperation and Failure in Innovation Processes: Empirical Evidence from the Korean Manufacturing Industry

  • Park, Ji-Hyun;Gwon, Seong-Hoon;Hong, Soon-Ki
    • Industrial Engineering and Management Systems
    • /
    • v.12 no.1
    • /
    • pp.63-72
    • /
    • 2013
  • The aim of this paper is to analyse the impacts of R&D cooperation and obstacles to technological innovation on the innovation failure of the Korean manufacturing firms. Two hierarchical regression models including interaction variables are employed for the analysis. Some interesting findings are: first, almost all the obstacles have positive and significant effects on the failure. Second, R&D cooperation positively or negatively moderates the impact of obstacles to technological innovation on the innovation failure, although R&D cooperation itself is not directly related to the failure. Third, the interaction effects between the cooperation and the obstacles influence the failure in various manners. This study is expected to help manufacturing firms which are under unfavourable environments to formulate their cooperation strategies successfully based on what they learn from the failure.

A Study of the Trait of Leadership Failure Using Failure Knowledge (실패지식을 활용한 리더십 실패 특성 도출에 관한 연구)

  • Shim, Hyung-Seok;Hong, Sun-Gwan
    • Knowledge Management Research
    • /
    • v.15 no.3
    • /
    • pp.1-12
    • /
    • 2014
  • It is tried to draw the failure traits of leadership by extracting leadership parts from previous failure studies and including some parts which mention failure leadership among leadership-related books. All of 5 patterns are drawn through total 13 types of study data. From 'insensitive to change' and authoritarianism which is mentioned 8 times in such 13 studies, to 'interpersonal problem', which is mentioned five times, traits which are mentioned at least five times are selected. There are drawn 5 traits including ${\Delta}$ authoritarianism ${\Delta}insensitive$ to change ${\Delta}lack$ of executive ability ${\Delta}populism$ and ${\Delta}interpersonal$ problem. As being examined in these 5 types of failure traits, the failure of leadership is ultimately happened because of communication heading for the inside without any communication(exchange) to the outside. That is, it is understood that authoritarian leaders don't perceive change correctly but make a wrong communication (populism) or break down communication. Additionally, the executive ability is to perform actually one's idea and to be achieved through incessant communication with members. Compared with other various studies to draw failure factors, these leadership traits have something in common. In the previous researches conducted the study of general failure factors, ${\Delta}adherence$ to preexisting business and resistance to change ${\Delta}unfeasible$ expansion strategy ${\Delta}blind$ faith in successful technology and innovation and ${\Delta}insufficiency$ to grasp competitor(consumer) are pointed out as the failure factors. It is deemed that these are happened because organizational management is headed for the inside without any communication (exchange) to the external environments. Matters unfolded through this paper until now are an attempt to apply the failure knowledge to a leadership part which is an individual field in business administration. It is considered that this study will be complemented through additional case study or quantitative analysis in the future.

  • PDF

Failure Management System for AREX's Signalling System (공항철도 신호시스템의 고장관리 체계)

  • Song, Mi-Ok;Lim, Sung-Soo;Lee, Chang-Hwan;Kim, In-Gyu
    • Proceedings of the KSR Conference
    • /
    • 2007.11a
    • /
    • pp.676-682
    • /
    • 2007
  • In this paper we introduce the Failure Management System for AREX's Signalling System which is applied by RAMS management. The corrective action report is classified into 3 group, scheduled maintenance, non-scheduled maintenance and the reported failure maintenance. The scheduled maintenance is for the failure detected by periodic inspection and it is concerned as the Preventive Maintenance. The reported failure maintenance is for the failure reported by non-maintenance staff and non-scheduled maintenance includes all corrective action except the works of the previous 2 group. RAMS analysis is based on the FRACAS data connected with the corrective action reports. AREX computerize the all process by the Facility Management System of Integrated Information System.

  • PDF