• Title/Summary/Keyword: Management Assessment

Search Result 6,291, Processing Time 0.035 seconds

Case Analysis of Risk Assessment for Steel and Iron Works (제철 사업장 위험성평가 사례 분석)

  • Hong, Sung-Man;Park, Peom;Kim, Kwang-Hyoun;Sun, Su-Bin
    • Proceedings of the Safety Management and Science Conference
    • /
    • 2009.11a
    • /
    • pp.209-221
    • /
    • 2009
  • In the steel industry, steel is manufactured and processed to produce a variety of steel products. The industry provides fundamental materials to the whole range of industries including car, ship, electric appliance and construction industries, so that it is very important as an infrastructure industry. The steel manufacture process involves aerial work, many danger factors caused by the treatment with hazardous gases including BFG and COG and by high pressure gases including H2, O2, N2 and LPG. It requires the management over the large area because many workers work in a plant. The potential dangers in the steel plant were identified and the effect of the danger assessment was verified through the analysis of the danger assessment for the steel plant. The allowed degree of danger was lowered after the improvement through the danger assessment in the plant where the case studies were conducted, which indicates that the danger assessment is highly effective.

  • PDF

A Cost-Optimization Scheme Using Security Vulnerability Measurement for Efficient Security Enhancement

  • Park, Jun-Young;Huh, Eui-Nam
    • Journal of Information Processing Systems
    • /
    • v.16 no.1
    • /
    • pp.61-82
    • /
    • 2020
  • The security risk management used by some service providers is not appropriate for effective security enhancement. The reason is that the security risk management methods did not take into account the opinions of security experts, types of service, and security vulnerability-based risk assessment. Moreover, the security risk assessment method, which has a great influence on the risk treatment method in an information security risk assessment model, should be security risk assessment for fine-grained risk assessment, considering security vulnerability rather than security threat. Therefore, we proposed an improved information security risk management model and methods that consider vulnerability-based risk assessment and mitigation to enhance security controls considering limited security budget. Moreover, we can evaluate the security cost allocation strategies based on security vulnerability measurement that consider the security weight.

A Study of Reasonable Improvement of Economical Value Assesment Method of Railway (철도의 경제적 가치평가방법의 합리적인 개선방안에 관한 연구)

  • Jeon, Seong-Moon;Sung, Deok-Yong;Go, Dong-Choon;Park, Yong-Gul
    • Proceedings of the KSR Conference
    • /
    • 2008.11b
    • /
    • pp.750-761
    • /
    • 2008
  • The social and economical value assessment of railway facilities implies unaccountable values such as: reduction of travel time, reduction of car accident, reduction of air pollution. However, the value of railway facilities has been evaluated as the transportation and management results. The investment and management results of railway need to be considered objectively. Therefore, this study established the economical value assessment method of railway facilities composed of 10 items of economical value through the existing a preliminary assessment investigation, a manual of railway investment assessment, paper study. In addition, this study proposed the strategy for the value assessment of railway facilities before and after.

  • PDF

The development of CAMBRA; Updated CRA (Caries management by risk assessment (CAMBRA)의 발전; CRA 업데이트)

  • Lee, Su-Young
    • Journal of Korean society of Dental Hygiene
    • /
    • v.21 no.4
    • /
    • pp.321-336
    • /
    • 2021
  • The aim of this study was to investigate the caries management by risk assessment (CAMBRA) development process and the latest updated caries risk assessment for the domestic settlement of the CAMBRA program and the activation of dental clinics. A system for CAMBRA was published in California Dental Association (CDA) in 2007. To investigate whether CAMBRA can be successfully implemented outside a university setting, a practice-based research network (PBRN) was created in the San Francisco Bay Area. Based on the CAMBRA-PRAN clinical studies, the caries risk assessment (CRA) tool was updated for patients aged 6 through adults in 2019. The CAMBRA system is expected to be widely and actively used in the dental field in Korea to contribute to oral health care.

The Advancement of Conformity Assessment Scheme in Korea (국내 적합성평가제도 선진화 방안)

  • Yoon, In-Chan;Woo, Tae-Hee
    • Journal of the Korea Safety Management & Science
    • /
    • v.10 no.2
    • /
    • pp.113-121
    • /
    • 2008
  • Recently Conformity Assessment Scheme has greatly played a role in development of domestic industry. But it has limits in responding to change of environment surrounding standard. Therefore management environment has been changed, standard has been more important, and new treaties as like WTO/TBT have been appeared. In these respects this research tries to analyze the policy trends of developed countries and problems of domestic institutions. And it tries to propose seven plans to progress Conformity Assessment Scheme including improvement of domestic standard system on the basis of analytical implications.

Development of Quality Assessment Tool and Application to Customer-Oriented Hospital Foodservice Management (고객지향적 병원 급식서비스 운영을 위한 질 평가 도구 개발 및 적용)

  • 이해영;장승희;양일선
    • Journal of Nutrition and Health
    • /
    • v.37 no.4
    • /
    • pp.329-338
    • /
    • 2004
  • The purposes of this study were to : a) develop the quality assessment tool of hospital foodservice management, b) evaluate the S hospital's foodservice quality by this tool, and c) do the feasibility study about this tool in hospital food-service field by establishing quality management strategies. The developed quality assessment tool of hospital food-service management was consisted of 20 items for quality evaluation by Likert 5 point scale and two additional questions with the most satisfactory item and the most unsatisfactory item. As a result of evaluation, S hospital's foodservice quality was somewhat high, on the factor 'personnel attitude', especially. The IPA technique proved nine items including Q5, Q7, Q8, Q11, Q12, Q13, Q15, Q16, Q17 were in 'Doing Great, Keep It Up' and seven items such as Q1, Q2, Q3, Q6, Q9, Q18, Q19 that got high expectation and low perception needed to be focused in quality management strategy.

Selection of Influencing Factors for Human Reliability Analysis of Accident Management Tasks in Nuclear Power Plants (원자력 발전소 사고관리 직무의 인간신뢰도분석을 위한 수행영향인자의 선정)

  • Kim, Jae-Hwan;Jeong, Won-Dae
    • Journal of the Ergonomics Society of Korea
    • /
    • v.20 no.2
    • /
    • pp.1-28
    • /
    • 2001
  • This paper deals with the selection of the important Influencing Factors (IFs) under accident management situations in nuclear power plants for use in the assessment of human errors. In order to achieve this goal, we collected two types of IF taxonomies, one is the full set IF list mainly developed for human error analysis. and the other is the IFs for human reliability analysis (HRA) in probabilistic safety assessment (PSA). Five sets of IF taxonomy among the full set IF list and ten sets of IF taxonomy among HRA methodologies were collected in the study. From the review and analysis of BRA IFs, we could obtain some insights for the selection of HRA IFs. By considering the situational characteristics of the accident management domain, candidate IFs are chosen. Finally, those IFs are structured hierarchically to be appropriate for the use in the assessment of human error under accident management situation. Three nuclear accidents such as TMI. Chernobyl and JCO were analysed to validate the proposed taxonomy.

  • PDF

A Proposed Self-assessment Framework for Measuring and Benchmarking Organizational Performance

  • Pun, Kit-Fai;Ho, Karis-Ka-Yan;Sun, Hong-Yi
    • International Journal of Quality Innovation
    • /
    • v.3 no.2
    • /
    • pp.57-73
    • /
    • 2002
  • Recent interests in total quality management (TQM) and business excellence (BE) had been fuelled with a range of national and regional awards. These awards are being increasingly used by organisations as part of the business improvement process and strategic benchmarking. This paper reviews the concepts and approaches of performance measurement (PM) and discusses the integration of PM with the TQM and BE philosophies. A TQM-BE-PM framework with a set of self-assessment checklists was developed. In order to complement the literature base with empirical evidence, an industry survey was conducted and a trial implementation of the framework was carried out in a leading manufacturing firm in Hong Kong. The self-assessment performance data of the fm was evaluated and then benchmarked with the industry averages obtained from the survey. This paper presents the empirical findings and discusses the applicability of the framework in measuring and benchmarking organisational performance toward continual improvement.

A Study on the Determining Factors For Assessment Criteria of Project Performance Capability of CM(Constuction Management) Considering Safety (안전을 고려한 건설사업관리 용역업자(CM) 사업수행능력 평가기준 요인 도출 연구)

  • Kim, Do-Su;Shin, Yoon-Seok
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2019.11a
    • /
    • pp.52-53
    • /
    • 2019
  • The construction industry has the most safety accidents among domestic industries. Special care must be taken because disasters in the construction industry lead to social problems caused by huge property losses and casualties. As a result of this, there is a growing awareness of disasters occurring in the construction industry, and government departments are tightening regulations on safety management. In particular, the OSHA(Occupational Safety and Health Agency) focuses on the expansion of protection targets and the clarification of responsibility in the full amendment OSHA. As a result, a study that focuses on safety management by client's responsibility is needed. In this study, the project performance capability assessment of construction project management contractors, which is being carried out with uniform assessment criteria without considering the characteristics of the construction project, is considered and all the amendments to the OSHA are considered, and the factors were derived for improvement measures.

  • PDF

RISK ASSESSMENT USING BIM BASED SAFETY MANAGEMENT SYSTEM

  • Hongseob Ahn;Hyunjoo Kim;Wooyoung Kim
    • International conference on construction engineering and project management
    • /
    • 2011.02a
    • /
    • pp.107-110
    • /
    • 2011
  • The key role in safety management is to identify any possible hazard before it occurs by identifying any possible risk factors which are critical to risk assessment. This planning/assessment process is considered to be tedious and requires a lot of attention due to the following reasons: firstly, falsework (temporary structures) in construction projects is fundamentally important. However, the installation and dismantling of those facilities are one of the high risk activities in the job sites. Secondly, temporary facilities are generally not clearly delineated on the building drawings. It is our strong belief that safety tools have to be simple and convenient enough for the jobsite people to manage them easily and be flexible for any occasions to be occurred at various degrees. In order to develop the safety assessment system, this research utilizes the BIM technology and collects important information by importing data from BIM models and use it in the planning stage.

  • PDF