• Title/Summary/Keyword: Management Assessment

Search Result 6,291, Processing Time 0.041 seconds

Risk Assessment of High Reliability Products - Focused on Motorcycle Helmets - (고신뢰성 제품 리스크평가 -오토바이 헬멧 중심으로 -)

  • Kim Jong-Gurl;Kwon Yeong-il;Kim Jin-kuk;Bin Sung-uk
    • Proceedings of the Korean Society for Quality Management Conference
    • /
    • 2004.04a
    • /
    • pp.266-271
    • /
    • 2004
  • Recently, consumers require products with high-reliability and high-safety. Risk management system and product safety become more important issue In view of product liability. This paper aims to propose a risk assessment system which can be applied to product with high-reliability and high-safety, and also show an empirical application of the proposed risk assessment system for the development of motorcycle helmets.

  • PDF

Assessment of Risk of Exposure to Chemicals in the Analysis Centers of Organizations for measuring the Working Environment, using CHARM (CHARM을 이용한 작업환경측정기관 분석실의 화학물질노출 위험성 평가 연구)

  • Park, Hyun-A;Choi, Seo-Yeon;Woo, In-Sung;Rie, Dong-Ho
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.18 no.4
    • /
    • pp.660-668
    • /
    • 2017
  • In this study, we conducted an assessment of the risks posed by the noxious chemicals often handled at the analysis centers of organizations involved in Work Environment Measurement (WEM) using the Chemical Hazard Risk Management (CHARM) system. For this purpose, six organizations involved in WEM located in Seoul and Gyeonggi, which conducted the risk assessment, were selected and, as a result, 29 materials were selected as chemical substances presenting a risk of exposure. In terms of their physical properties, there were 16 liquid and 10 solid materials, and for the special management materials (CMR), the findings were as follows: 'Carcinogenic' 1A - 11 and 1B - 1 (2 - 8); 'Mutagenic' 1A - 4 and 1B - 3 (2 - 8); and 'Repro-toxic' 1A - 0 and 1B - 1 (2 - 6). In the risk estimation, 30.4%, 66.1% and 3.6% of the materials presented 'low', 'average' and 'high' risks, respectively. In addition, two of these six institutions had materials presenting a 'high' risk. This study is significant in that the risk assessment was conducted using CHARM, a chemical substance assessment tool. It is expected that the results will be utilized as the basic data for safety assessment, the establishment of a plan for emergency measures and drawing up a safety management manual, and the institutional and legal management of accidents and risks in the analysis centers of organizations involved in WEM and the management of chemicals by drawing attention to the risks involved.

Insurance Claims Review and Assessment Task Effects on the Insurance Claims Reviewer and Evaluator in Hospitals (병원 급 보험심사자의 업무 특성에 따른 효과 분석)

  • Lee, Ko-Eun;Kim, Kyung-Hwa
    • The Korean Journal of Health Service Management
    • /
    • v.11 no.1
    • /
    • pp.27-42
    • /
    • 2017
  • Objectives : This study analyzes the characteristics of hospital organization structures, insurance claims reviews and assessment tasks and their effects on hospitals in Pusan. Methods : The data for this study were collected through interview and self-administered surveys in 109 hospitals. The study included only - hospitals with a minimum of 50beds and excluded those providing only dental, psychiatric, or long-term care. Results : The findings of this study state that the number of beds has an influence on the organizitional structure. Conclusions : Hospital managements should seek human resources management(the insurance claims reviewer and evaluator) schemes that take into account the characteristics of the medical institution. In addition, insurance claims review and assessment tasks in hospitals require considerable knowledge and experience, and hospitals should be equipped with staff that have the relevant expertise. Therefore, to further deepen knowledge, comprehensive training should be continuously carried out in order to produce specialists in claims review and assessment.

Fabrication Assessment Method for Dimensional Quality Management of Curved Plates in Shipbuilding and Offshore Structures (선박 및 해양 구조물 곡부재 치수 품질 관리를 위한 가공완성도 평가)

  • Kwon, Ki-Youn;Lee, Jaeyong
    • Journal of Ocean Engineering and Technology
    • /
    • v.32 no.2
    • /
    • pp.106-115
    • /
    • 2018
  • The forward and afterward parts of ships and offshore structures are designed to improve the fuel consumption performance. These are made of curved plates with a large thickness. If a fabricated curved plate has some dimensional errors, a lot of additional cost is incurred in the assembly process. Thus, an accurate dimensional assessment is very important for fabrication. In this paper, we propose an assessment method for the dimensional quality management of curved plates. This can be applied to data measured using a variety of three-dimensional instruments, with boundary measurement points automatically classified and sorted to create a measurement surface. The assessment is evaluated after matching the CAD surface and the measured surface considering constrained conditions. The fabrication assessment is evaluated as a probability of how much the tolerance is satisfied.

A Study on the Linkage between Environmental Imact Assessment and Environmental Management System in Korea (한국에서의 EIA와 EMS의 연계방안 연구)

  • Kim, Im-Soon;Han, Sang-Wook;Kim, Hea Sam;Kang, Seon-Hong;Kim, Dae-Kwon
    • Journal of Environmental Impact Assessment
    • /
    • v.15 no.3
    • /
    • pp.165-178
    • /
    • 2006
  • Environmental Impact Assessment (EIA) and Environmental Management Systems (EMS) are perceived by many to be separate environmental tools. EIA serves as a systematic and predictive tool for assessing the potentially significant impacts of developments on the environment. An EMS, on the other hand, is used to consider the key impacts of operational businesses on the environment. The main difference to note is that during the EIA process impacts on developments are predicted. A proposed development has yet to be built and therefore an element of uncertainty is associated with these assessments. With an EMS, the business or organization's processes are already in operation. Even though there is also an element of prediction involved, it is a comparatively easier task to investigate what the environmental impacts of these processes are. However, in contrast with the orientation of EIA to further development actions, EMS involves the review, assessment and incremental improvement of an existing organization's environmental effects. EMS can thus be regarded as a continuation of EIA principles into the operational stage of a policy, plan, program and project. EIA may be carried out without fully supporting necessary informations to EMS.

A Quantitative Assessment Model for Data Governance (Data Governance 정량평가 모델 개발방법의 제안)

  • Jang, Kyoung-Ae;Kim, Woo-Je
    • Journal of the Korean Operations Research and Management Science Society
    • /
    • v.42 no.1
    • /
    • pp.53-63
    • /
    • 2017
  • Managing the quantitative measurement of the data control activities in enterprise wide is important to secure management of data governance. However, research on data governance is limited to concept definitions and components, and data governance research on evaluation models is lacking. In this study, we developed a model of quantitative assessment for data governance including the assessment area, evaluation index and evaluation matrix. We also, proposed a method of developing the model of quantitative assessment for data governance. For this purpose, we used previous studies and expert opinion analysis such as the Delphi technique, KJ method in this paper. This study contributes to literature by developing a quantitative evaluation model for data governance at the early stage of the study. This paper can be used for the base line data in objective evidence of performance in the companies and agencies of operating data governance.

Case Analysis of Risk Assessment for Steel and Iron Works (제철 사업장 위험성평가 사례 분석)

  • Hong, Sung-Man;Park, Peom;Kim, Kwang-Hyoun
    • Journal of the Korea Safety Management & Science
    • /
    • v.12 no.1
    • /
    • pp.11-18
    • /
    • 2010
  • In the steel industry, steel is manufactured and processed to produce a variety of steel products. The industry provides fundamental materials to the whole range of industries including car, ship, electric appliance and construction industries, so that it is very important as an infrastructure industry. The steel manufacture process involves aerial work, many danger factors caused by the treatment with hazardous gases including BFG and COG and by high pressure gases including $H_2$, $O_2$, $N_2$ and LPG. It requires the management over the large area because many workers work in a plant. The potential dangers in the steel plant were identified and the effect of the danger assessment was verified through the analysis of the danger assessment for the steel plant. The allowed degree of danger was lowered after the improvement through the danger assessment in the plant where the case studies were conducted, which indicates that the danger assessment is highly effective.

Use of Environmental Geospatial Information to Support Environmental Impact Assessment Follow-Up Management (환경영향평가의 사후관리 지원을 위한 환경공간정보 활용 방안)

  • Cho, Namwook;Maeng, Jun Ho;Lee, Moung Jin
    • Korean Journal of Remote Sensing
    • /
    • v.33 no.5_3
    • /
    • pp.799-807
    • /
    • 2017
  • Environmental impact assessment is a regulation that is implemented to reduce harmful environmental impacts of development projects. However, The environmental value is difficult to quantify and the uncertainty, There is a problem of objectivity and reliability of the system is consistently pointed out. Therefore, the necessity of the data-based environmental impact assessment system is gradually increasing. Especially, environmental impact assessment is highly applicable to environmental spatial information because it contains about the development of a particular area. Also with the introduction of EIA Follow-up management system, there is a demand for a system for providing and utilizing environmental information in a time series. This study derives the necessity of information provision system and analyz existing environmental information utilization system based on the institutional characteristics of environmental impact assessment. And suggest ways to provide environmental spatial information to find policy implications for improving the limit of environmental impact assessment system.

Review of International Cases for Managing Input Data in Safety Assessment for High-Level Radioactive Waste Deep Disposal Facilities (고준위방사성폐기물 심층처분시설 안전성평가 입력자료 관리를 위한 해외사례 분석)

  • Mi Kyung Kang;Hana Park;Sunju Park;Hae Sik Jeong;Woon Sang Yoon;Jeonghwan Lee
    • Economic and Environmental Geology
    • /
    • v.56 no.6
    • /
    • pp.887-897
    • /
    • 2023
  • Leading waste disposal countries, such as Sweden, Switzerland, and the United Kingdom, conduct safety assessments across all stages of High-Level Radioactive Waste Deep Geological Disposal Facilities-from planning and site selection to construction, operation, closure, and post-closure management. As safety assessments are repeatedly performed at each stage, generating vast amounts of diverse data over extended periods, it is essential to construct a database for safety assessment and establish a data management system. In this study, the safety assessment data management systems of leading countries, were analyzed, categorizing them into 1) input and reference data for safety assessments, 2) guidelines for data management, 3) organizational structures for data management, and 4) computer systems for data management. While each country exhibited differences in specific aspects, commonalities included the classification of safety assessment input data based on disposal system components, the establishment of organizations to supply, use, and manage this data, and the implementation of quality management systems guided by instructions and manuals. These cases highlight the importance of data management systems and document management systems for securing the safety and enhancing the reliability of High-Level Radioactive Waste Disposal Facilities. To achieve this, the classification of input data that can be flexibly and effectively utilized, ensuring the consistency and traceability of input data, and establishing a quality management system for input data and document management are necessary.

Environmental Impact Assessment and Environmental Monitoring: Monitoring Factors and Organization (환경영향평가와 측정 : 환경처 업무 중심으로)

  • Kang, In-Goo;Chang, Chun-Ki;Han, Eui-Jung;Kim, Myung-Jin
    • Journal of Environmental Impact Assessment
    • /
    • v.3 no.2
    • /
    • pp.69-75
    • /
    • 1994
  • Environmental Impact Assessment is composed of screening, scoping, inventory survey, prediction, assessment, alternative assessment, mitigation measure, and post management. Environmental monitoring data is applied to EIA process such as prediction and post management. It must he collected and managed systematically for effective applying in EIA process. This article explains factors such as air quality, water quality, soil, ocean, odor, noise & vibration, ecosystem, etc. and organizations of environmental monitoring managed by Ministry of Environment.

  • PDF