Maintenance Priority Index of Overhead Transmission Lines for Reliability Centered Approach

  • Heo, Jae-Haeng;Kim, Mun-Kyeom;Kim, Dam;Lyu, Jae-Kun;Kang, Yong-Cheol;Park, Jong-Keun
    • Journal of Electrical Engineering and Technology
    • /
    • v.9 no.4
    • /
    • pp.1248-1257
    • /
    • 2014
  • Overhead transmission lines are crucial components in power transmission systems. Well-designed maintenance strategy for overhead lines is required for power utilities to minimize operating costs, while improving the reliability of the power system. This paper presents a maintenance priority index (MPI) of overhead lines for a reliability centered approach. Proposed maintenance strategy is composed of a state index and importance indices, taking into account a transmission condition and importance in system reliability, respectively. The state index is used to determine the condition of overhead lines. On the other hand, the proposed importance indices indicate their criticality analysis in transmission system, by using a load effect index (LEI) and failure effect index (FEI). The proposed maintenance method using the MPI has been tested on an IEEE 9-bus system, and a numerical result demonstrates that our strategy is more cost effective than traditional maintenance strategies.

Suggestion of Priority Decision Method for Performance Evaluation Based on Risk Index for Small and Medium Sized Bridges (위험도 지수 기반 중소규모 교량 성능평가 우선순위 결정 방안 제안)

  • Lee, Hee-Hyun;Shin, Byoung-Gil;Lee, Yeong-Il;Kim, Young-Min
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.23 no.6
    • /
    • pp.70-76
    • /
    • 2019
  • This paper presents a methodology for priority decision of performance evaluation of small-and-medium-sized highway bridges. This methodology could be used for establishing a maintenance strategy of those bridges which are not liable to the law of the Special Act on the Safety Control and Maintenance of Establishments and are thought laid under blind spot. The risk index are calculated considering vulnerability and social influence, then the bridges are classified as three types, one requiring immediate evaluation, the other one requiring evaluation within next year, and the third one observing, according to the index. The suggested method was applied to a small bridge under service and its field applicability verified. From this study, it was judged that this methodology could be used appropriately for establishing maintenance strategy and saving the maintenance budget.

Decision of Maintenance Priority Order for Substation Facility through Structural Importance and Fault Analysis (변전설비의 구조적 중요도와 고장 분석을 통한 유지보수 우선순위 선정)

  • Lee, Sung-Hun;Lee, Yun-Seong;Kim, Jin-O
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.27 no.4
    • /
    • pp.23-30
    • /
    • 2013
  • Reliability Centered Maintenance(RCM) is one of most widely used methods in the modern power system to schedule a maintenance cycle and determine the priority of inspection. A precedence study for the new structure of rearranged system should be performed due to introduction of additional installation. This paper proposes a new method to evaluate the priority of maintenance and inspection of the power system facilities. In order to calculate that risk index, it is required that the reliability block diagram should be analyzed for the power system. Additionally, a fault cause analysis is also performed through the event-tree analysis.

Critical Criteria Based on Facility Condition Index for Supporting Priority Decision-making in Educational Facilities

  • Shin, Seung Woo;Yi, June Seong
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.687-688
    • /
    • 2015
  • The objective of identifying the cause of inconsistency in determining priority of educational facility maintenance, any related factors were thoroughly identified and tested, to see if it has any effect on decision-making process in resource allocation for educational facilities. On the assumption that 'the more there are to be repaired/maintained and deferred, the higher the relevant cost will be, this will lead to a significant social loss. Accordingly, this study established a framework of determining resource allocation priority based on deferred maintenance and its related expenses. For doing so, it was required to determine relative ranking in terms of resource allocation within a pre-assigned school district, in consideration of the criticality of each deferred maintenance attribute/variable.

  • PDF

Review of the Priority Index for Selection between Repair and Reinforcement Methods of Dam Facilities (댐 시설물 보수·보강공법 선정을 위한 우선순위지수에 대한 고찰 )

  • Dong Hyun Kim;Hyung Jun Park;Hee Jung Youn;Seung Oh Lee
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.27 no.3
    • /
    • pp.1-11
    • /
    • 2023
  • After the collapse of the Seongsu Bridge in the 1990s in Korea, attention was focused on the maintenance of facilities. The government has established various policies since the enactment of the Act in 1995 until recently. In general, safety inspections are performed to evaluate the safety grade of facilities, and facilities are maintained and managed by performing repairs and reinforcements for defects. However, since the budget is limited, it is impossible to carry out repair and reinforcement projects for all defects. It is necessary to prioritize repair and reinforcement measures. Then, the priority index (PI) is presented considering the importance of members, the seriousness of defects, and economic feasibility. In this index, the degree of influence can be adjusted within the range of 50 to 100% according to the expert's subjective judgment, and the same weight is set for some specific members. Also, the effect through repair and reinforcement is not taken into account decisively, and most of them have a limit in which priority is determined by economic feasibility. Therefore, in this study, through several case studies, problems with the priority index were reviewed and an equation was presented to improve them.

A Study of Improvement of Urban Pavement Maintenance Technique based on Pavement Condition Evaluation and FWD Data (도로포장 표면조사와 FWD정보에 기반한 도심지 도로포장 유지보수 기법 개선방안 연구)

  • Lee, Sangyum
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.17 no.12
    • /
    • pp.532-541
    • /
    • 2016
  • The objective of this paper is to support accurate pavement condition assessment and decision of proper maintenance method and time by conducting visual inspection and calculating the remaining life of pavement from falling weight deflectometer(FWD) data. Each was implemented in the same long-term performance pavement(LTPP) sections. Visual inspection was executed to measure pavement condition indices such as crack, rutting and international roughness index(IRI) and the Seoul Pavement Index(SPI) was calculated based on these results. The dynamic modulus was back-calculated from the FWD data. The remaining pavement lives were determined from equivalent single axle loading(ESAL) and FWD data. Correlation of maintenance priority by each result value was examined. Consequently, the correlation between remaining life to Crack and Rutting was higher than the other factors or indicesbecause IRI is not related to FWD value and SPI value consists with IRI value and other indices. The R-square value of correlation of FWD with Crack and Rutting was 0.65, which indicated an insufficient correlation. Consequently, when decision of maintenance of method, time, etc. is determined, FWD data have to be considered with Crack and Rutting because of those relations.

Analysis of the Priority of Evaluation Criteria and Detailed Index for Selecting Street Trees (가로수 선정 평가기준과 세부지표의 중요도 분석)

  • Kim, Min Kyung
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.49 no.1
    • /
    • pp.42-53
    • /
    • 2021
  • Street trees improve the cityscape and air quality, reduce heat islands, and create wildlife habitats. Hence, they are essential parts of a city's green infrastructure. Therefore, several trees that are well adapted to the urban environment were planted. However, this caused the problem of simple trees being planted around the world. This study is to select more various street trees. To accomplish this, evaluation criteria and detailed indexes were created. The importance was indicated through the Analytic Hierarchy Process. For commercial roads, the priority of landscape characteristics is 0.2640, and among detailed indicators, the priority of shape is 0.1245. For work roads, the priority of landscape characteristics is 0.2496, and among detailed indicators, the priority of shape is 0.1177. For work roads, the priority of characteristics of civil service is 0.2250, and among detailed indicators, the priority of shape is 0.1177. For general roads, the priority of maintenance characteristics is 0.2479, and among detailed indicators, the priority of shape is 0.1062. For historical and cultural roads, the priority of regional characteristics is 0.3488, and among detailed indicators, the priority of regional characteristics is 0.1643. For ecological roads, the priority of ecosystem characteristics is 0.3488, and among detailed indicators, the priority of the diversity of species is 0.1643. For automotive-only roads, the priority of the ecosystem characteristics is 0.4639, and among detailed indicators, the priority of reducing emissions is 0.1643. This study will provide objective criteria for the selection of street trees.

A Study on Algorithm for Determining Seismic Improvement Priority of Highway Bridges (도로교 내진보강 우선순위 결정을 위한 알고리즘에 관한 연구)

  • Kim, Hyung-Gyu;Jang, Il-Young
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.22 no.6
    • /
    • pp.138-147
    • /
    • 2018
  • With the recent series of damage caused by earthquakes in Korea, such as Gyeongju and Pohang, we know that Korea is no longer a safe zone for earthquakes and that we need to be prepared for them. In addition, bridges built prior to the introduction of seismic design concepts remain without adequate seismic reinforcement measures, and earthquake reinforcement should be performed efficiently considering economic and structural safety. Preliminary assessment of seismic performance of existing bridges is divided into four seismic groups, taking into account seismicity, vulnerability and Impact, considering the magnitude of the existing bridge's seismic, and prioritization for further evaluation of seismic performance. In this study, unlike the existing anti-seismic reinforcement priority method, scores are calculated based on the seismic design criteria applied to bridges, importance coefficient of the bridge including the zone coefficient and the Importance, vulnerability index of the bridge including the soil condition and the elapsed years, detail coefficient of the bridge including the superstructure form, the span length, the width, the height, the design load, and the daily traffic volume. The calculated score items will be weighted and grouped according to the results. Using this, a simpler and more efficient algorithm was proposed to determine the priority of seismic reinforcement on a bridge.

An Improved Facility Management System for Public Facility Management Corporations (공공 시설관리기관의 시설관리시스템 개선에 관한 연구)

  • Kim, ChangDuk;Lee, HyunChul
    • Korean Journal of Construction Engineering and Management
    • /
    • v.19 no.1
    • /
    • pp.32-42
    • /
    • 2018
  • The importance of facility maintenance management cannot be overemphasized in that not only the value but also the performance of the facility is determined by the level of maintenance. The maintenance cost of the facility ranges from 3 to 10 times the initial construction cost depending the type and use of the facility over the life span. This maintenance importance is increased for the group of facilities and even more critical when the facilities compete for the limited budget with the limited resources such as manpower and equipment. This study analyzed sixteen public facility management corporations primarily for three items: 1) facility management system, 2) long-term rehabilitation plan, 3) the rehabilitation selection system. This paper provides and recommends the key elements of the facility maintenance management system based on the analysis of the sixteen corporations.

Large-scale Generator Maintenance Scheduling via Sensitivity Analysis Method (민감도 분석에 기초한 대규모 전력계통의 예방정비계획 방법론 개발)

  • Jung, Man-Ho;Park, Jong-Bae
    • Proceedings of the KIEE Conference
    • /
    • 1998.07c
    • /
    • pp.1020-1023
    • /
    • 1998
  • This paper presents a new approach to large-scale optimal generator maintenance scheduling. To do this, we developed a kind of discrete sensitivity index of each generator by using difference of objective fuction when it is on and off status. Based on the sensitivity value, we applied the conventional priority approach as an optimization method in the order of each generator's sensitivity measure. By applying the developed method, we can efficiently search the state space and dramatically reduce the computation time in a large scale power system.