• Title/Summary/Keyword: Maintenance of land boundaries

Search Result 6, Processing Time 0.024 seconds

A Fundamental Study on the Maintenance of Administrative Boundaries based on Spatial Information (공간정보기반의 행정경계 정비를 위한 기초연구)

  • Yun, Ji-Ye;Park, Hong-Gi;Choi, Yun-Soo;Nam, Dae-Hyun
    • Spatial Information Research
    • /
    • v.20 no.1
    • /
    • pp.47-57
    • /
    • 2012
  • An Administrative Boundary is the basic of spatial information to cover geographical and regional area. Its importance has arisen in our society at the Smart world era. However, it is difficult to serve exact boundary's lines as administrative boundaries are based on the cadastre lines of land register ; these partly are overlay each other or has gaps. So, it Should be adjusted. But, the maintenance work of administration boundaries causes a conflict or confusion unless we offer concrete procedures and detailed plans previously. Therefore, a rational method is required to prevent side-effects such as confusion, disagreem ent and a conflict etc. In this Study, we present a method and 5 step procedures to make better use in a practical maintenance work. we researched on basic studies of Administrative boundary's concept, history. And we performed a field survey as well as analysis of current problems. considering these results, we suggest usage of various spatial data sources, stake-holders' participation, a method of Nearest district's boundaries to maintain administrative boundaries. Throughout the method, we expect it to serve correct boundary-data to various fields without a big confusion. it is also useful to apply its results not only for re-surveying our land but for recording appropriate boundary-data as rational lines.

Study on the Basic Ways for Propulsion of Land Consolidation Project -Laying Stress on Rural Integral Development (耕地整理事業의 推進 基本方向에 관한 調査硏究 -農村整備를 中心으로-)

  • Kim, Choul-Kee
    • Magazine of the Korean Society of Agricultural Engineers
    • /
    • v.34 no.2
    • /
    • pp.21-39
    • /
    • 1992
  • Many problems were found out the remarkable unbalance between paddy fields and up-land areas, or between plain and mountainous areas, unreasonable establishing of land consolidaton boundaries without consideration of rural development, lower leverl of construction technology of the roads and canals for agricultral use ad operation and maintenance of them by human power far apart from the ages of high technology, high information and free internationalisation, and too slow progress to overcome the weak agricultural circumstances etc. through the survey in the past executed land consolidation projects. The basic ways for solution of these problems for propulsion of land consolidation project through investigation are summarized as follows : 1. Land consolidation project should be executed to the direction of balanced regional development, laying stress on the upland and mountainous areas in order to carry out the agriculture effectively. 2. the acreage of land consolidation project to be conducted anually should be increased to overcome the serious underdeveloped agricultural development. 3. It should be developed to the way in accordance with the order of land use from the view point of rural integral development including the rural readjustment. 4. The level of the structures of road and canal, the size of standard lot and the grouping of land substitution should be to incraese the productivity of land and labour more than ever and reached to a degree in cope with the age of industrialization, information and free internationalisation. 5. The level of the management of agricultural water use and the maintenace of the various facilities should be developed to be automatization, remote control, central control and information processing instead human work. 6. Land substitution should take a measure of grouping method in accordance with the agricultural plan and farming organization, which can overcome high industrialized society in place of the substition by origin land. 7. Land consolidation project should be planned in order to fulfil a conservative function of ecosystem and resources together with improvement of land and labour productivity.

  • PDF

Present State of Community Forestry (Hutan Kemasyarakatan/HKm) Program in a Protection Forest and Its Challenges: Case Study in Lampung Province, Indonesia

  • Kaskoyo, Hari;Mohammed, Abrar Juhar;Inoue, Makoto
    • Journal of Forest and Environmental Science
    • /
    • v.30 no.1
    • /
    • pp.15-29
    • /
    • 2014
  • This article discusses the state of a community forestry program in a protection forest in Indonesia, which has been running for almost two decades. We found that the program did not achieve its objective mainly because of frequent changes in regulations. There are also activities such as: measuring and mapping working area boundaries, drawing up a work plan, planting, maintenance and security, paying royalties to those who harvest forest resources, and submitting annual reports on land use to the district government head, which have not worked as expected. We also found that the major incentives for local people to participate in the program are getting certificates of management and the program's effectiveness in minimizing land-use conflicts. Participants perceived that their major role on the program is to follow farmer-group directives or government rules. To achieve the program's purposes, farmer groups need technical assistance related to protection-forest management and opportunities for financing.

Applications of Digital Orthophoto in Cadastre (지적분야에서의 수치정사사진 활용방안에 관한 연구)

  • 박병욱;김상수;최윤수;차영수
    • Journal of the Korean Society of Surveying, Geodesy, Photogrammetry and Cartography
    • /
    • v.17 no.3
    • /
    • pp.233-243
    • /
    • 1999
  • In this study, sample sites are chosen where digitalized cadastral maps are available, and boundaries of forestry, farming lands, and residence are clearly distinguishable. Digital orthophotos, produced from aerial photographs, are overlaid with digitalized cadastral maps to grope for applications of digital orthophoto in cadastre. The conclusions and applicable fields of this study are as follows. The first. digital orthophoto is applicable to solve problems such as discordance and duplication of boundary produced in the process of digitizing cadastral maps. The second, using digital orthophoto, it is possible to extract regions where a trouble of ownership would exist and so the necessity of cadastral resurveying can be brought. The third, by overlaying digital orthophoto and cadastral map, it can be used effectively for the present situation maintenance of buildings. The fourth, because it is possible to examine current land use of each lot, digital orthophoto may contribute to decide the validity of land category on cadastral map.

  • PDF

Analysis on Pilot Survey for Cadastral Non-correspondence Arrangements (지적불부합지의 정리를 위한 실험측량 분석 연구)

  • 강태석;권규태
    • Journal of the Korean Society of Surveying, Geodesy, Photogrammetry and Cartography
    • /
    • v.21 no.3
    • /
    • pp.269-275
    • /
    • 2003
  • The cadastral system which accomplishes the base of national land administration with accuracy of proper data and the cadastral maintenance quickly is agreeing with the actual place in information ages in Inundation. But even in spite of many efforts, various Problems are exposed in accuracy of the data on the cadastral maps and local situation must agree accurately from the process which propels cadastral information systems. Therefore, it must be carried out the cadastral non correspondence arrangement first of all in link of the plan which it corrects the error of existing data and computerization quickly. It summarizes the research as follows ; Cadastral non correspondence of the land boundaries on the map and actual circumstance does not agree with cadastral maps accurately, The lands which exceed the standards with the position error excess of 50cm on lil ,200 and 240cm on 1/6,000 areas on the map scale are the registration correction objectives. It is investigated that the cadastral non correspondence parcels occur in various cause and long period, the area error corrections are mainly objectives, and about 80% of the test area comes to reveal within permitted the limit of the measurement of planimetric area for cadastral survey, so it is not difficult with the fact that the compensation back which it follows in area increase and decrease and the location error correction becomes the important object fer the cadastral non correspondence arrangement projects.

A Study on the Problem Analysis of Designation and Management of the Zone of Urban Nature Park (도시자연공원구역 지정 및 관리상의 문제점 분석)

  • Lee, Jeoung-Suk;Cho, Se-Hwan
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.39 no.3
    • /
    • pp.98-106
    • /
    • 2011
  • This study was performed with the purpose of providing basic data for the improvement of zoning regulations of urban nature park by analyzing the present problem which occurred during last 6 years from the year of 2005 when the program was introduced for the first time. The study was processed first by the analysis of the cases of problems evoked by citizens, second the other problems was delineated by interviews of officials, at last the validity of all of the problems was verified by a group of professionals through delphi method. The results can be summarized as follows. 1. In relation to the designation and management of urban national park areas, designation criteria, designation process, maintenance, laws and regulations and 20 other items were found to be problematic. After Delphi method, 5 items were removed and 2 added. The results showed that there were 17 problematic items in total. 2. Regarding the problem of criteria for designation, which are, lack of priority(weights), lack of objectivity due to the difficulty to use quantitative evaluation method, incompatibility for contaminated land environmental impact assessment, incompatibility of land suitability assessment, lack of detailed field survey standards, lack of national park area standards, and 6 other items. 3. Regarding the problem of designation process, which are, the occurrence of civil appeals for designating a new national park, the needs of feasibility study on the urban national park areas constructed before urban national park guidelines came out, lack of a comprehensive review of the boundaries set when determining national park area management plan, poor temporal and financial conditions for an accurate field survey, and 4 other items. 4. Regarding the problem of maintenance management, which are, lack of management system in each space, lack of effectiveness of Urban Nature Park Area Management Plan among master plans for park and green areas, the occurrence of dual managers due to dual natures such as purpose area and city park, lack of professional manpower to manage park areas, and 4 other items. 5. Regarding the problems of regulation guidelines, which are, lack of separate urban park area management plan, incompatibility of the permitted facilities in the park to the park area standards, lack of feasibility study on urban park areas, and 3 other items.