• 제목/요약/키워드: Maintenance equipment

검색결과 1,087건 처리시간 0.027초

시스템의 상태를 고려한 발전설비의 예방 유지보수 계획 수립 (Scheduling of Preventive Maintenance for Generating Unit Considering Condition of System)

  • 신준석;변융태;김진오;김형철
    • 전기학회논문지
    • /
    • 제57권8호
    • /
    • pp.1305-1310
    • /
    • 2008
  • Traditional maintenance planning is based on a constant maintenance interval for equipment life. In order to consider economic aspect for time based preventive maintenance, preventive maintenance is desirable to be scheduled by RCM(Reliability-Centered Maintenance) evaluation. The main objective of RCM is to reduce the maintenance cost, by focusing on the most important functions of the system and avoiding or removing maintenance actions that are not strictly necessary. So, Markov state model is utilized considering stochastic state in RCM. In this paper, a Markov state model which can be used for scheduling and optimization of maintenance is presented. The deterioration process of system condition is modeled by the stepwise Markov model in detail. Also, because the system is not continuously monitored, the inspection is considered. In case study, simulation results about RCM will be shown using the real historical data of combustion turbine generating unit in Korean power systems.

원격 유지보수용 다관절 조작기의 순차 탐색에 의한 장애물 회피 경로계획 (Collision Free Path Planing of Articulated Manipulator for Remote Maintenance Using Sequential Search Method)

  • 이종열;송태길;김성현;박병석;윤지섭
    • 한국정밀공학회:학술대회논문집
    • /
    • 한국정밀공학회 1997년도 추계학술대회 논문집
    • /
    • pp.519-522
    • /
    • 1997
  • In this study, the collision free path planning method of the articulated manipulator using sequential search is proposed. This method is to find the joint path of the manipulator with many degrees of freedom from the distal joint to the proximal one. To do this, the initial work space of the gantry manipulator, which is a remote maintenance equipment of the radioactive environment, is defined from the condition that the distal joint configuration is determined by the posture of maintenance. Then, 2-dimensional configuration space with the obstacle area is represented and the collision free path of manipulator is searched in the configuration space. And, this method is verified using the graphic simulation in virtual workcell for the spent fuel disassembling processes. The result of this study can be effectively used in implementing the maintenance processes for the hot cell equipment and enhance the reliability of the spent fuel management.

  • PDF

막장력 측정을 통한 막구조물의 장력 유지관리 시스템 검토 (Review of Membrane Tension Maintenance System for Membrane Structures through Membrane Tension Measurement)

  • 진상욱;손수덕;이승재
    • 한국공간구조학회논문집
    • /
    • 제16권2호
    • /
    • pp.39-45
    • /
    • 2016
  • Membrane structure is a system that is stabilized by maintaining a tensile state of the membrane material that originally cannot resist the bending or pressure. Also, it is a system that allows the whole membrane structure to bear external loads caused by wind or precipitation such as snow, rain and etc. Tension relaxation phenomenon can transpire to the tension that is introduced to the fabric over time, due to the innate characteristics of the membrane material. Thus, it is important to accurately understand the size of the membrane tension after the completion of the structures, for maintenance and management purposes. The authors have proposed the principle of theoretically and indirectly measuring the tension by vibrating the membrane surface with sound waves exposures against the surface, which is compartmentalized by a rectangular boundary, and by measuring the natural frequency of the membrane surface that selectively resonates. The authors of this paper measured the tension of preexisting membrane structure for its maintenance by using the developed portable measurement equipment. Through analyzing the measurement data, the authors review the points that should be improved and the technical method for the new maintenance system of membrane tension.

청정실내의 공기 필터 시스템의 보전 (Maintenance of air filter system in clean room)

  • 구자항;고명훈
    • 산업경영시스템학회지
    • /
    • 제19권40호
    • /
    • pp.341-349
    • /
    • 1996
  • In this paper, we deal with the problem of maintenance policies for an air filter system in clean room. Two types of maintenance policies are considered, one based on the reliability of equipment and the other one determined by the total cost including minimal repair cost. For these models, we obtain the structure of the optimal maintenance Policy which minimize the total cost. Finally we give the numerical example.

  • PDF

RCM 치명도 분석을 통한 유지보수 개선 절차 (Procedure for Maintenance Improvement by RCM Criticality Analysis)

  • 이창환;송미옥;박병노;이정모
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2010년도 춘계학술대회 논문집
    • /
    • pp.2209-2214
    • /
    • 2010
  • The purpose of Reliability Centered Maintenance(Hereafter, RCM) is to enhance the effectiveness and efficiency of preventive maintenance by applying the improvement plan after analysis of existing preventive maintenance. To accomplish this, it is required to collect the failure data for equipments during operation, and to carry out the quantitative criticality analysis for each equipment. This paper shows that the case study of RCM criticality analysis based on the accumulative failure data and following improvement activity for KORAIL AIRPORT RAILROAD's E&M system.

  • PDF

고속철도 귀선전류 및 차축 온도 검측을 위한 검측장치 구현 (Implementation of the Measurement Equipment to Measure Return Current and Axle Temperature of High Speed Railway)

  • 이영수;이병곤;황인광;한승훈
    • 전기학회논문지
    • /
    • 제65권4호
    • /
    • pp.695-703
    • /
    • 2016
  • The maintenance method for the electrical facility of high speed railway has been evolved from inspection by personnel to the automated way by the detection devices. In particular, the signalling equipment in order to increase the safe and efficient operation of the trains is required to maintain normal operation by periodic maintenance. Because the return current gives the most important effects to the wayside equipment in case of the failures, a method is needed to measure the unbalanced rate of return current on the train at high speed driving. The Hot Box Detector(HBD) device that is installed at track-side has a function to recognize the abnormal axle box by detecting the temperature that occurs in the axle of train passing over its device. In order to implement the measurement equipment for unbalanced rate of return current and axle temperature, the design method is proposed and the experimental test results by test bed are included in the paper.

CVD 장비 Up Time 향상을 위한 기판 지지대의 재질 및 구조 최적화 (Material and Structure Optimization of Substrate Support for Improving CVD Equipment Up Time)

  • 우람;김원경
    • 한국재료학회지
    • /
    • 제29권11호
    • /
    • pp.670-676
    • /
    • 2019
  • We study substrate support structures and materials to improve uptime and shorten preventive maintenance cycles for chemical vapor deposition equipment. In order to improve the rolling of the substrate support, the bushing device adopts a ball transfer method in which a large ball and a small ball are mixed. When the main transfer ball of the bushing part of the substrate support contacts the substrate support, the small ball also rotates simultaneously with the rotation of the main ball, minimizing the resistance that can be generated during the vertical movement of the substrate support. As a result of the improvement, the glass substrate breakage rate is reduced by more than 90 ~ 95 %, and the equipment preventive maintenance and board support replacement cycles are extended four times or more, from once a month to more than four months, and the equipment uptime is at least 15 % improved. This study proposes an optimization method for substrate support structure and material improvement of chemical vapor deposition equipment.

의료기기 QI 활동 개선방안에 대한 연구 (A Study on Quality Improvement of Medical Equipments)

  • 강훈희;주라형;김종순;김서확;허수진
    • 한국의료질향상학회지
    • /
    • 제5권2호
    • /
    • pp.190-201
    • /
    • 1998
  • Background : Medical equipments take a very important role in diagnosis and treatment of disease in modern medicine and effective maintenance of the equipments is a necessary to provide a good health care to the public. After developing a new QC program for effective maintenance of medical equipments and practicing it for a year, we report the results of the new program. Methods : The maintenance data of 9 equipments in 8 categories including a CT Scanner were analyzed with regard to the parts responsible for most frequent failure and cause of the failure. After learning the most frequent failure part and cause of the failure, we developed a new QC program that emphasizes preventive maintenance of the most frequent failure part. We compared the number of failure per year and active rate of each equipment before and after the adoption of the new QC program. Results : The average number of failure per year per equipment was 20.7 before and it decreased by 43% to 11.9 after adoption of the new QC program. The average active rate of the equipments was 92.6% before and it increased by 3.2% to 95.8% after adoption of the new program. Conclusions : The practice of the new QC program appears very useful as it decreased the failure rate and increased the active rate of the equipments.

  • PDF

반도체장비유지보수 자격개발에 관한 연구 (A Study on the Development of Qualification for Semiconductor Machine Maintenance)

  • 강석주
    • 한국산학기술학회논문지
    • /
    • 제13권6호
    • /
    • pp.2472-2478
    • /
    • 2012
  • 본 연구는 반도체 산업에서 반도체장비 유지보수에 사용되어지는 반도체장비 유지보수 분야의 전문기술인력을 효과적으로 양성할 수 있는 반도체장비 유지보수의 자격종목을 개발하고자 하는데 그 목적이 있다. 연구의 목적을 달성하기 위하여 반도체장비 유지보수 분야의 국내외 실태 조사, 문헌조사를 통하여 반도체장비 유지보수 관련 교육훈련기관 및 검정 수요 예상 인력을 파악했으며, 유사자격제도(전자부품장착기능사, 전자부품장착산업기사, 생산자동화기능사, 생산자동화산업기사)를 분석하였고, 직무분석을 통하여 반도체장비유지보수기능사의 직무 및 교육내용을 분석하였다. 또한 반도체장비 유지보수 자격종목 신설에 대한 설문조사를 실시했으며, 반도체장비유지보수기능사 자격종목의 출제기준 및 채점 방법을 제시했고, 필기시험과 실기시험에 대한 모의 검정시험도 실시하였다. 이러한 결과를 토대로 반도체장비유지보수기능사에 대한 교육프로그램을 만들었으며, 자격검정을 실시할 수 있는 출제기준을 제시하였다.

해군 무기체계 한국형 상태진단시스템 발전방향 연구 (Development of Korean Condition Based Maintenance Systems to Monitor Naval Weapon Systems)

  • 오경원
    • 항공우주시스템공학회지
    • /
    • 제10권4호
    • /
    • pp.67-74
    • /
    • 2016
  • 한국형 상태기준정비는 현재 한국해군 함정에 설치된 ICAS를 최대한 활용하여 전투준비태세를 완비하고, 선제적 정비/보급 지원과 군수자산의 경제적 운용, 데이터 기반 장비수명관리를 위한 것이다. 이러한 목적을 달성하기 위해서는 장비상태의 기준을 설정해야 하는데 이는 제작사에서 원천적인 기술을 제공하고 있지 않아 각 장비별 성능 맵 확보가 필요하고 고장패턴 등의 자료 축적이 필요하다. 본 연구에서는 소형 가스터빈엔진을 활용하여 가스터빈 성능 맵을 확인하고 고장정보를 축적하여 실시간으로 장비성능 확인과 성능 경향을 나타내게 하였고 이를 통해 운용자의 행동지침과 정비자의 검사 절차등을 명시하여 최적의 장비상태가 유지 될 수 있도록 솔루션을 개발하였다. 본 연구를 기반으로 실제 함정의 데이터를 이용한 상태진단기법 발전에 활용할 예정이다.