With the growth of economy, the esthetic values of bridges become significant points in the decision process of a type of new bridges. So, it is common that a long-span bridge or a multi-purpose bridge are selected as the type of new bridges. Also, the economic growth derives increase in traffic and then the increased traffic derives multi purpose bridges from the decision process of bridge types. In the multi-purpose bridges with private fund, the construction cost is simply alloted to several organizations according to the percentage of participation and usage. But the allotment of the maintenance cost is not simple. Because the loads and safety factors in design are different between the criterion of design of highway bridges and that of railway bridges. In this study, we verify the possible problems in case of allotment method of maintenance cost in foreign examples as well as domestic example. As one of the method of determination of allotment ratio in maintenance cost, the method based on the stress of structural analysis is presented and it can be an example in the similar problem later.
Kim, Hyun Hwan;Humphries, Evan;Hu, Jiong;Lee, Soon Jae;Lee, Moon Sup
International Journal of Highway Engineering
/
v.17
no.3
/
pp.1-12
/
2015
PURPOSES : This paper presents a description of the current issues facing road managers regarding the surface-type conversion of low-volume roads for cost savings. METHODS: The paper reviews previous works conducted toward this end, acknowledges gaps in the current research, and lays out what information is needed for further studies. RESULTS : If the cost to maintain an unsurfaced road is less than the cost of maintaining a surfaced road, then there is potential for cost savings for the management agency. However, the problem is bigger than simply maintaining the roads that already exist. If unsurfaced roads prove to be more economical than surfaced roads, then the cost to convert from a surfaced to an unsurfaced roadway, and vice versa, when necessary, must also be examined. CONCLUSIONS : No other studies have addressed the un-surfacing of a road for cost savings, and it is therefore unknown whether substantial savings can be realistically obtained by converting from a surfaced to an unsurfaced road. To determine whether a conversion policy would be a viable option, additional data and research are needed.
Journal of the Korean Institute of Educational Facilities
/
v.26
no.6
/
pp.29-37
/
2019
The research institute has a function to get the research outcome through the various experiments, data collection and analysis. Therefore, research building is important to keep the research condition or experiment environment. But buildings would be deteriorated and leaded into the deterrence of research. Maintenance is planned to protect the research building condition through various general repair or heavy repair. The heavy repair is generally conducted in massive repair scope or main components preparation. In this paper, it aimed at analyzing the effect of the massive or main components repair with inputted cost and its resulted output. In order to analyze the effect of a massive repair, it used the Benefit/Cost analysis and sensitivity analysis. Results of this study are as follows : The benefit/cost analysis shows that research building whose researcher continuously live and study has good effect. On the contrary, pace of the the experimental function is not good effect in benefit/cost analysis. But the experimental function is indispensible to get the research outcom for the research goal. Therefore, the experimental function will be planned to repair and get the historical repair data because the proper repair time would be prepared to cut down the repair cost.
Park, Miyun;Lee, Jeonghun;Park, Sangwoo;Lim, Jonggwon
Journal of the Society of Disaster Information
/
v.16
no.2
/
pp.276-290
/
2020
Purpose: The construction history of domestic port facilities has been more than 100 years, and until recently, modern facilities have been continuously built and expanded. However, it is not easy to keep the required performance conditions at the time of initial construction due to changes in the marine environment and increase in volume. In particular, in the case of harbor structures that have a long service life, safety performance and function management are becoming very important due to the increase in the size of ships, the increasing frequency of use, and the increase in the scale of natural disasters. Method: Therefore, this study investigates the state change by structural type of port facilities and analyzes the rehabilitation activities and the history that contribute to the performance improvement and life extension activities. Result: Through this, we distinguished between performance improvement cost (CAPEX) and repair maintenance activity (OPEX) that can be used to establish port facility maintenance strategy, and suggested cost model that can be used to establish maintenance strategy. Conclusion: These studies are expected to contribute greatly to mid- to long-term investment decisions.
Journal of the Korea Institute of Building Construction
/
v.17
no.5
/
pp.473-481
/
2017
With the barracks modernization project, the Ministry of National Defense has been operating 60 projects of the 75 that have been announced. It was difficult to investigate and analyze the data in the past because data could not be obtained while it was much easier to do that since data can be obtained from private companies. With the aim of increasing the usability of the facilities, the objective of this study is to present a reasonable alternative for repair and maintenance costs by investigating and analyzing the budget and the actual expenses of repair and maintenance of military facilities for the past 3 to 5 years, and then identifying the problems with these. To accomplish this, a theoretical review of previous studies and legal grounds related to repair and maintenance costs was performed, and data on the estimates and the actual expenses data used in BTL projects carried out by private companies were analyzed. First, one of the problems was that there are some items omitted, including consumables, and these items should be included in order to secure their budget. Second, in terms of the items for divided payments, two improvements had been presented: a short-term payment plan for the operation period of 3 to 5 years and a long-term payment plan for an additional and complemented period other than the operation period. The repair and maintenance costs should be further studied at the point of time in a future when the actual data on the costs and operation period of military facilities can be secured. This study is expected to serve as empirical data that will form the basis for a reasonable calculation of the construction cost for military facilities.
In this paper, studied condenser operating management which is affecting power plants efficiency considering the cost of poor quality. Sea water temperature and condenser pressure have clear correlation in S power plants. As the sea water temperature changes, condenser pressure changed -1.7~+20 mmHg from design condenser pressure(38.1 mmHg). Use the heat rate correction curve from manufactory company, realized that efficiency and cost of poor quality changed 0.0201%, 12,830 won/h at Unit #1,2 but 0.0155%, 9,832 won/h when condenser pressure 1 mmHg rise. Also, checked that it is changed depend on seasonal corresponding operation, plant ageing and the point of preventive maintenance like overhaul maintenance. This study said if we considered complying with management range and planning overhaul maintenance, then it could help reducing operating maintenance losses minimum 2.5 billion won per 1 year (case : Unit #1, forty days maintenance).
Purpose: In this paper, we propose the output model of the optimal inventory requirements of the Maintenance Float (M/F). Weapon systems were modernized and increased costs. Thus, the complexity increases with. Alternatives to achieve the goal of availability of weapon systems and to reduce life-cycle cost are required. Especially, securing spare parts is more effective than adding the amount of equipment or maintenance facilities to achieve the goal of availability and reduce life cycle costs. However, securing spare parts and repair costs are directly related, so exact requirements are needed. Methods: Three kinds of methods (Calculation method of applying the Poisson distribution, Calculation method of considering the number of CSP, and Calculation method of applying M&S program) that this paper proposed compare the influence of the availability and the amount of spare parts. Result: We calculate the cost of M/F when the operational availability is over than 80% and compare that result. The biggest cost was calculated from the Poisson distribution method. We found that requirements and unit price is the key factor that gives a significant effect. Conclusion: These three kinds of methods can be used as a basis for Maintenance Float calculation. Among them, the calculation method based on CSP is optimal replacement equipment requirements calculation method.
Journal of the Korea institute for structural maintenance and inspection
/
v.15
no.1
/
pp.226-234
/
2011
The service life of concrete structures exposed to a marine environment can be extended by controlling the amount of chloride in cover concrete. Patching is one of the appropriate maintenance techniques for chloride contamination. Chloride-contaminated cover concrete is removed and replaced with sound one. It can provide less risk of corrosion of steel, so that the structure can be maintained for required service life. In this study, a quantitative assessment of the service life subjected to the chloride attack is proposed to determine the effective repair options such as repair depth, repair material and timing of repair. The Crank-Nicolson based finite difference formulation from Fick's second law is proposed to predict the profiles of chloride ion in a repaired concrete structure, considering ingress of chloride from outer and redistribution of residual chloride from the substrate concrete. Therefore, the repair application times and maintenance cost for the target service life can be estimated. Finally, the numerical examples are presented to ensure its applicability.
Journal of the Korea institute for structural maintenance and inspection
/
v.23
no.2
/
pp.10-19
/
2019
Management plan with repairing is essential for RC structures exposed to chloride attack since durability problems occur with extended service life. Conventionally deterministic method is adopted for evaluation of service life and repair cost, however more reasonable repair cost can be obtained through continuous repair cost from probabilistic maintenance technique. Unlike the previous researches considering only normal distribution of life time, PLTFs (Probabilistic Life Time Function) which can be capable of handling log and normal distributions are attempted for initial and repair service life, and repair cost is evaluated for OPC and GGBFS concrete. PLTF with log distributions in initial service life is more effective to save repair cost since it is more dominant after average than normal distribution. Repair cost in GGBFS concrete decreases to 30% of OPC concrete due to longer initial service life and lower repairing event. The proposed PLTF from the work can handle not only normal distributions but also log distributions for initial and repair service life, so that it can provide more reasonable repair cost evaluation.
Mun Hyeong-Seok;Jang Chang-Du;Ha Yun-Seok;Jo Yeong-Cheon
Proceedings of the Korean Society of Precision Engineering Conference
/
2005.06a
/
pp.331-336
/
2005
A lot of manufacturing knowledge and method have applied to increase manufacturing efficiency in industry field. DES(Discrete Event Simulation) is one of solution to deal with manufacturing problems in factory. Beginning of research, old maintenance system of KNR ( Korea National Railroad) and its technical problems are basically investigated. KNR has maintained railway vehicle with their own solution based on experience. Very advanced railway vehicles such as KTX (Korea Train Express) and TTX(Tilting Train Express) will be difficult to maintain with their old maintenance method. In order to apply knowledge of DES, maintenance field of railway must be considered. Imaginary maintenance machine are selected to variable of DES. Maintenance capability of each machine will be evaluated base on imaginary data from imaginary machine. The machine could be very expensive as well as difficult to replace. Target of research is minimization of number of machine in railway workshop. So basic knowledge of discrete event simulation is introduced. Then five essential stages of discrete event simulation are provided. Each maintenance case defined as event. Each event is discrete and simulated base on different case such as one maintenance line with one machine and one maintenance line with two machines in railway workshop. simple maintenance method, discrete event simulation, will be come out very powerful in complicate maintenance system and will be helpful to reduce maintenance cost as well as maintenance labor.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.