• Title/Summary/Keyword: Maintenance Simulation

Search Result 798, Processing Time 0.031 seconds

An Experience-Type Car Maintenance Training System based on Logic Simulation (논리 시뮬레이션을 기반으로한 체험형 자동차 정비 훈련 시스템)

  • Park, Gil-Sik;Park, Dae-Sung;Park, Ki Hyun;Kim, Juntae
    • Journal of the Korea Society for Simulation
    • /
    • v.23 no.2
    • /
    • pp.73-84
    • /
    • 2014
  • Recently, researches on the application of IT technology to various fields including traditional industries are becoming more popular. One challenge in the field of education is to understand the way how technology may support learning, and research on self-directed learning has been accelerated by integrating education and IT technology. The process of self-directed learning in e-learning applications such as Car Maintenance Training is very difficult and complicated. Previous studies on car maintenance training applications provided simple training scenarios with predetermined action sequences. To incorporate self-directed learning in car maintenance training, however, trainees must be able to perform various maintenance operations himself and experience various situations. To provide such functionality, it is necessary to obtain an accurate response for various operations of trainees, but it requires complicated calculations with respect to varieties in the electrical and mechanical processes of a car. In this paper, we develop a logic simulation agent using JESS inference engine in which self-directed learning is achieved by capturing the behavior of trainees and simulating car operations without complicated physical simulations in car maintenance training.

Optimization for the Design Parameters of Electric Locomotive Overhaul Maintenance Facility (전기 기관차 중수선 시설의 설계 변수 최적화)

  • Um, In-Sup;Cheon, Hyeon-Jae;Lee, Hong-Chul
    • Journal of the Korean Society for Railway
    • /
    • v.13 no.2
    • /
    • pp.222-228
    • /
    • 2010
  • In this paper, we propose a optimization approach for the Electric Locomotive Overhaul Maintenance Facility (ELOMF), which aims at the simulation optimization so as to meet the design specification. In simulation design, we consider the critical path and sensitivity analysis of the critical (dependent) factors and the design (independent) parameters for the parameter selection and reduction of the metamodel. Therefore, we construct the multi-objective non-linear programming. The objective function is normalized for the generalization of design parameter while the constraints are composed of the simulation-based regression metamodel for the critical factors and design factor's domain. Then the effective solution procedure based on the pareto optimal solution set is proposed. This approach provides a comprehensive approach for the optimization of Train Overhaul Maintenance Facility(TOMF)'s design parameters using the simulation and metamoels.

Application of the Digital Mockup to Preliminary Analysis the Remote Maintainability of ACP

  • Song, Tai-Gil;Kim, Sung-Hyun;Park, Byung-Suk;Yoon, Ji-Sup;Lee, Sang-Ho
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 2004.08a
    • /
    • pp.363-366
    • /
    • 2004
  • KAERI is developing the Advanced Spent Fuel Conditioning Process (ACP) as a pre-disposal treatment process for spent fuel. In this process, the management process must operate in intense radiation fields as well as in a high temperature. Therefore, remote maintenance has played a significant role in this process. Hence suitable remote handling and maintenance technology needs to be developed along with the design of the process concepts. To do this, we developed the digital mockup for the ACP. The digital mockup provides the capability of verifying the remote operability of the process without fabrication of the process equipment. In other words, by applying virtual reality to the remote maintenance operation, a remote operation task can be simulated in the digital mockup. Through utilizing this graphic simulation in this digital mockup, general guidelines can be established for designing equipment intended for remote handling and maintenance. Also, the designer of the equipment that must be remotely maintained should ensure that there is adequate access to the process equipment. The graphic simulator will substantially reduce the cost of the develo363pment of the remote handling and maintenance procedure as well as the process equipment.

  • PDF

Analysis of Remote Operation involved in Spent Nuclear Fuel Conditioning Process using its Virtual Mockup

  • Yoon, Ji-Sup;Kim, Sung-Hyun;Song, Tai-Gil
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 2004.08a
    • /
    • pp.840-845
    • /
    • 2004
  • The remote operation of the Advanced Spent Fuel Conditioning Process (ACP) is analyzed by using the 3D graphic simulation tools. Since the spent nuclear fuel, which is a high radioactive material, is processed in the ACP, the ACP equipment is operated in intense radiation fields as well as in a high temperature. Thus, the equipment is operated in a remote manner and should be designed with consideration for the remote handling and maintenance. Also suitable remote handling technology needs to be developed along with the design of the process concepts. For this we developed a graphic simulator, which provides the capability of verifying the remote operability of the ACP without the fabrication of the process equipment. In other words, by applying virtual reality to the remote maintenance operation, a remote operation task can be simulated in the graphic simulator, not in the real environment. The graphic simulator will substantially reduce the cost of the development of the remote handling and maintenance procedure as well as the process equipment, while at the same time developing a remote maintenance concept that is more reliable, easier to implement, and easier to understand.

  • PDF

Simulation Training for Inactive Nurses with 360 VR content

  • Park, Jung-Ha;Lee, Yun-Bok
    • International Journal of Internet, Broadcasting and Communication
    • /
    • v.13 no.1
    • /
    • pp.116-122
    • /
    • 2021
  • This study evaluated the effect of simulation training on cardiac arrest in hospitals for inactive nurses with 360 VR content, and attempted to prepare basic data for simulation training for inactiv nurses in the future. The design of this study is an experiment study before and after a single group. The study period was from October 13, 2020 to December 17, 2020. The subjects of the study were a total of 21 nurses who participated in the education program for inactive nurses. For simulation training for inactive nurses, Microsoft Powerpoint, hybrid simulation, high-fidelity simulation, and 360 VR content were applied for theories education and practical education. As a result of the study, the satisfaction level of the curriculum for the cardiac arrest situation in the hospital for inactive nurses was 4.78±0.36 points out of 5 points. Understanding of education was 4.71±0.46 points out of 5 points. Usefulness of education was 4.80±0.40 points out of 5 points. Confidence in airway maintenance before and after training, BLS review, manual defibrillator, emergency medication administration, airway maintenance, emergency situation simulation, and debriefing were all significant. According to the results of this study, simulation training of the situation of cardiac arrest in the hospitals for inactive nurses was effective. In future studies, it will be necessary to develope and verify specific teaching and learning methods by applying various cases of cardiac arrest situations in consideration of the type of hospitals.

An Evaluation of Development Plans for Rolling Stock Maintenance Shop Using Computer Simulation - Emphasizing CDC and Generator Car - (시뮬레이션 기법을 이용한 철도차량 중정비 공장 설계검증 - 디젤동차 및 발전차 중정비 공장을 중심으로 -)

  • Jeon, Byoung-Hack;Jang, Seong-Yong;Lee, Won-Young;Oh, Jeong-Heon
    • Journal of the Korea Society for Simulation
    • /
    • v.18 no.3
    • /
    • pp.23-34
    • /
    • 2009
  • In the railroad rolling stock depot, long-term maintenance tasks is done regularly every two or four year basis to maintain the functionality of equipments and rolling stock body or for the repair operation of the heavily damaged rolling stocks by fatal accidents. This paper addresses the computer simulation model building for the rolling stock maintenance shop for the CDC(Commuter Diesel Car) and Generator Car planned to be constructed at Daejon Rolling Stock Depot, which will be moved from Yongsan Rolling Stock Depot. We evaluated the processing capacity of two layout design alternatives based on the maintenance process chart through the developed simulation models. The performance measures are the number of processed cars per year, the cycle time, shop utilization, work in process and the average number waiting car for input. The simulation result shows that one design alternative outperforms another design alternative in every aspect and superior design alternative can process total 340 number of trains per year 15% more than the proposed target within the current average cycle time.

A Study on the Verification of Heavy Overhaul Maintenance Allowances for the Maintenance Shop (시뮬레이션과 BPR을 응용한 Layout 기반의 철도차량기지 중정비 검수 여유율 검증)

  • Choi, Sung-Hwan;Lee, Hi-Sung
    • Journal of the Korean Society for Railway
    • /
    • v.13 no.1
    • /
    • pp.9-15
    • /
    • 2010
  • When designing the size of a heavy maintenance shop for rolling stock, it is required to arrange buildings and facilities in the minimum site so as to improve the maintenance efficiency. However, the fluctuation rate (hereinafter "allowance rate") on which factors such as service and maintenance fluctuation should be applied when estimating the size of the maintenance shop has been used without verification. The objective of the study is to calculate a reasonable allowance rate and to review its appropriateness through the analysis of the facilities layout and process simulation to absorb the above elements into the staying time in the heavy maintenance shop. Since the working time, in this study, is assumed to be average working time, 10~20% was given to the standard deviation of working time in consideration of difference between workers, and possible allowance rate was drawn by analysis of the simulation results. In the future, it is required to optimize the size of the shop by applying appropriate allowance rate through scientific review of such factors as O&M plan, R/S reserve rate, capability of the shop, outsourcing rate, standard work amount, and so on.

Application Markov State Model for the RCM of Combustion Turbine Generating Unit (Markov State Model을 이용한 복합화력 발전설비의 최적의 유지보수계획 수립)

  • Lee, Seung-Hyuk;Shin, Jun-Seok;Kim, Jin-O
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.56 no.2
    • /
    • pp.248-253
    • /
    • 2007
  • Traditional time based preventive maintenance is used to constant maintenance interval for equipment life. In order to consider economic aspect for time based preventive maintenance, preventive maintenance is scheduled by RCM(Reliability-Centered Maintenance) evaluation. So, Markov state model is utilized considering stochastic state in RCM. In this paper, a Markov state model which can be used for scheduling and optimization of maintenance is presented. The deterioration process of system condition is modeled by a Markov model. In case study, simulation results about RCM are used to the real historical data of combustion turbine generating units in Korean power systems.

Ant Colony Optimization Approach to the Utility Maintenance Model for Connected-(r, s)-out of-(m, n) : F System ((m, n)중 연속(r, s) : F 시스템의 정비모형에 대한 개미군집 최적화 해법)

  • Lee, Sang-Heon;Shin, Dong-Yeul
    • IE interfaces
    • /
    • v.21 no.3
    • /
    • pp.254-261
    • /
    • 2008
  • Connected-(r,s)-out of-(m,n) : F system is an important topic in redundancy design of the complex system reliability and it's maintenance policy. Previous studies applied Monte Carlo simulation and genetic, simulated annealing algorithms to tackle the difficulty of maintenance policy problem. These algorithms suggested most suitable maintenance cycle to optimize maintenance pattern of connected-(r,s)-out of-(m,n) : F system. However, genetic algorithm is required long execution time relatively and simulated annealing has improved computational time but rather poor solutions. In this paper, we propose the ant colony optimization approach for connected-(r,s)-out of-(m,n) : F system that determines maintenance cycle and minimum unit cost. Computational results prove that ant colony optimization algorithm is superior to genetic algorithm, simulated annealing and tabu search in both execution time and quality of solution.

A graphic Simulator of Manipulators for Remote Maintenance (원격유지보수용 조작기 시뮬레이터 개발)

  • 이종열;김성현;송태길;박병석;윤지섭
    • Proceedings of the Korean Society of Precision Engineering Conference
    • /
    • 2002.10a
    • /
    • pp.772-775
    • /
    • 2002
  • The remote handling and maintenance devices in the nuclear hot ceil should be checked prior to the hot operation in view of reliability and operability. In this study, the digital mock-up is implemented to analyze and define the process equipment maintenance processes instead of real mock-up, which is very expensive and time consuming. To do this, the parts of equipment and maintenance devices are modeled in 3-D graphics, assembled, and kinematics is assigned. Also, the virtual workcell of the spent fuel management process is implemented in the graphical environment which is the same as the real environment. This simulator has the several functions for verification such as analyses for the manipulator's working area, the collision detection, the path planning and graphic simulation of the processes etc. This graphic simulator of the maintenance devices can be effectively used in designing of the maintenance processes for the hot cell equipment and enhance the reliability of the spent fuel management.

  • PDF