• Title/Summary/Keyword: Maintenance Result Data

Search Result 781, Processing Time 0.032 seconds

Failure Analysis of Train Control System for Hign Speed Line by CAMS (CAMS에 의한 고속선 열차제어시스템의 장애 분석)

  • Kim, Yong-Kyu;Baek, Jong-Hyun;Kim, Jong-Ki;Shin, Duck-Ho
    • Proceedings of the IEEK Conference
    • /
    • 2006.06a
    • /
    • pp.973-974
    • /
    • 2006
  • In this paper, Computer-aided Maintenance Equipments, which are being used in maintenance, are applied to analyze failures in train control systems, resulting in long time delays of trains. It can be expected to extend and apply CAMS (Computer Aided Maintenance System) in the hereafter efficient operation and maintenance of high-speed railway train control systems, by comparison between the analysis result of fundamental causes, from high-speed railway train control system failures occurred during the operational process, and predictive result of failure causes, based on the recording data of CAMS when failures were occurred.

  • PDF

A Study of Analysis Method for the Track Geometry Measuring Data on High Speed Railway (고속철도 궤도검측 자료 분석기법에 관한 연구)

  • 강기동
    • Journal of the Korean Society for Railway
    • /
    • v.7 no.4
    • /
    • pp.291-295
    • /
    • 2004
  • The Track geometry measuring on High-speed railway is the most important subject for the track construction and track maintenance work. Also the measuring accuracy is so significant part because it provides principle data for the maintenance plan and the assesment of working quality and can control the train speed limitation. From this point of view, it is very important to verify for the track recording coach(EM120) in KNR. According to the result of spectrum analysis, the noise near 1m waveband was found on the track recording data from EM120. So, New filter has been applied to remove the noise form track recording data. and it makes possible to acquire resembling result to real track geometry.

A Study on the DB-IR Integration: Per-Document Basis Online Index Maintenance

  • Jin, Du-Seok;Jung, Hoe-Kyung
    • Journal of information and communication convergence engineering
    • /
    • v.7 no.3
    • /
    • pp.275-280
    • /
    • 2009
  • While database(DB) and information retrieval(IR) have been developed independently, there have been emerging requirements that both data management and efficient text retrieval should be supported simultaneously in an information system such as health care, customer support, XML data management, and digital libraries. The great divide between DB and IR has caused different manners in index maintenance for newly arriving documents. While DB has extended its SQL layer to cope with text fields due to lack of intact mechanism to build IR-like index, IR usually treats a block of new documents as a logical unit of index maintenance since it has no concept of integrity constraint. However, In the DB-IR integrations, a transaction on adding or updating a document should include maintenance of the posting lists accompanied by the document. Although DB-IR integration has been budded in the research filed, the issue will remain difficult and rewarding areas for a while. One of the primary reasons is lack of efficient online transactional index maintenance. In this paper, performance of a few strategies for per-document basis transactional index maintenance - direct index update, pulsing auxiliary index and posting segmentation index - will be evaluated. The result shows that the pulsing auxiliary strategy and posting segmentation indexing scheme, can be a challenging candidates for text field indexing in DB-IR integration.

A Study on the Existing State of Preventive Maintenance and the Improvement Measures for a Point Machine (선로전환기 예방정비 현황 및 개선 방안에 관한 연구)

  • Lee, In-Hyun;Kim, Dae-Hyun;Kim, Min-Ho;Seo, Jung-Wook;Kim, Du-Ill;Jung, Ho-Hung
    • Proceedings of the KSR Conference
    • /
    • 2011.05a
    • /
    • pp.1174-1181
    • /
    • 2011
  • This paper investigates the current established preventive maintenance and its corresponding data on a point machine among railway signalling facilities and suggests a part of considerable plans when the policy of the preventive maintenance is modified. It is not appropriated to apply the optimized preventive replacement period considered with the cost simply. In that case, it is suggested that the reliability should be analyzed failure mode and effects through collecting the on-site failure data sufficiently. Then, that result can be proposed to adjust the proper criteria into the rational way by comparing the initial maintenance criteria. In this paper, the alternative way to determine the feasibility of the inspection period using failure probability is introduced.

  • PDF

Practical setup time implementation in the roll-based manufacturing practice having print operations (인쇄공정이 있는 Roll 기반 제조업에서의 실용적 Setup Time 적용 방안)

  • Bae, Jae-Ho;Wang, Gi-Nam
    • IE interfaces
    • /
    • v.22 no.1
    • /
    • pp.85-94
    • /
    • 2009
  • Nowadays, most of the major manufacturing companies prepare their manufacturing schedule using package based solutions. Even though the accuracy of the detail scheduling result is high at implementation, however, it is low during maintenance period. The main cause of low accuracy during maintenance period is due to difficulties in maintaining the accurate level of master data. In this paper, we propose to easily maintain setup time, which is one of the most important factors required in master data to achieve good scheduling result, after changing job. This paper is mainly focused on how to deduce the factors that influence the setup time in a roll-based manufacturing field with print operations. For this purpose, we employed rule based algorithm and applied for deciding setup time for the existing product items. Likewise, it can be applied to new items without any complex setup procedures, and, finally, it displays the result of the real setup-time and calculated setup-time.

Reliability Evaluation of Power Distribution System Considering Maintenance Effects (유지보수 영향을 고려한 배전계통 신뢰도 평가)

  • Moon, Jong-Fil;Shon, Jin-Geun
    • The Transactions of the Korean Institute of Electrical Engineers P
    • /
    • v.59 no.2
    • /
    • pp.154-157
    • /
    • 2010
  • In this paper, the Time-varying Failure Rates(TFR) of power distribution system components are extracted from the recorded failure data of KEPCO(Korea Electric Power Corporation) and the reliability of power distribution system is evaluated using Mean Failure Rate(MFR) and TFR. The TFR is approximated to bathtub curve using the exponential and Weibull distribution function. In addition, Kaplan-Meier estimation is applied to TFR extraction because of incomplete failure data of KEPCO. Also the reliability of the real power distribution system of Korea is evaluated using the MFR and TFR extracted from real failure data, respectively and the results of each case are compared with each other. As a result, it is proved that the reliability evaluation using the TFR is more realistic than MFR. In addition, it is presented that the application method at power distribution system maintenance and repair using the result of TFR.

A Study on Maintenance of Deteriorated Bridge By Long-Term Displacement Monitoring (장기처짐계측에 의한 노후교량의 유지관리에 관한 연구)

  • Kyung, Kab Soo;Lee, Young Il;Lee, Hee Hyun;Park, Yong Jin
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.2 no.3
    • /
    • pp.194-204
    • /
    • 1998
  • This study was performed to suggest the proper maintenance method for the deteriorated gerber type PC box girder bridge by using the long term displacement monitoring data. For this study, the monitoring system which can measure the long term displacement and the concrete surface temperature was designed and operated. From the measurement and structural analysis results, the cause of the permanent deformation which the bridge has already was estimated, and based on this result, the allowable permanent displacement value at the hinge was suggested. From this study, it was known that the long term monitoring system can be applied to the active maintenance of the deteriorated bridge and the suggested allowable permanent displacement could be used for the maintenance of the bridge.

  • PDF

A Concept of Probabilistic Maintenance Cost Analysis Considering Risk Factors of Aged Multi-Family Housing (노후 공동주택의 위험요인을 고려한 확률적 유지관리비 분석 개념)

  • Park, Moon-Sun;Won, Seo-Kyung
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2019.05a
    • /
    • pp.246-247
    • /
    • 2019
  • This study was conducted to provide useful information to enable planned repair and cost planning during the operation and maintenance phase of aged multi-family housing. For this purpose, The concept of probabilistic maintenance cost analysis considering the risk factors of the aged multi-family housing is presented in the following six steps. 1. Risk factor investigation and analysis 2. Classification and deriving of maintenance cost 3. Investigation and deriving cost maintenance cost of old apartment house 4. Analysis of expert questionnaire 5. Analysis of Monte -Carlo simulation 6. Probabilistic maintenance cost Deriving the result. This study has limitations that need to be verified by applying actual data.

  • PDF

Estimation for Failure Rate of Railway Power Facility and Determination of Maintenance Priority Order using Fuzzy Theory and Expert System (퍼지이론과 전문가 시스템을 이용한 철도 전력 설비의 고장률 평가와 유지보수 우선순위의 결정)

  • Lee, Yun-Seong;Kwon, Ki-Ryang;Kim, Jin-O;Kim, Hyung-Chul
    • Proceedings of the KSR Conference
    • /
    • 2009.05a
    • /
    • pp.495-504
    • /
    • 2009
  • As the Reliability Centered Maintenance(RCM) is being studied, maintenance tasks can be performed effectively through the Risk Priority Number(RPN) evaluation about the components in the system. The RPN is usually calculated through arithmetical operations of three values, Severity, Occurrence, and Detection for each facility. This RPN provides information that includes risk level of the facility and the priority order of maintenance tasks for facility. However, if there is no sufficient historical failure data, it is difficult to calculate the RPN. In this case, historical failure data from other sources can be used and apply this data to korean railway system. In this paper, it is proposed that a new methodology to model the failure rate as a fuzzy membership function. This method is based on failure data from other sources by means of the fuzzy theory and the expert opinion system. And considering assessment tendency of each expert, distortions that happened when the failure rate of facilities is estimated were minimized. This results determine Occurrence values of facilities. Taking advantage of this result., the RPN can be calculated with Severity and Detection of facilities by using the fuzzy operation. The proposed method is applied the rail-way power substation.

  • PDF

Economic Assesment for Track Ballast Structures based on Proper Maintenance Level (적정 유지관리수준에 기초한 궤도도상구조에 대한 경제성 검토)

  • Baek, Jae-Wook;Joo, Hwan-Joong;Song, Yoo-Seob;Park, Tae-Hyo
    • Journal of the Korean Society for Railway
    • /
    • v.10 no.2 s.39
    • /
    • pp.167-178
    • /
    • 2007
  • In general, it is known that the concrete ballast track is possible to reduce a cost of maintenance activities cause of maintenance free by restrictive maintenance in application of track ballast structures. However, if deteriorations and fracture mechanism of a material are considered, proper maintenance activities and repairing are continually required. For the problems, we evaluated an economical efficiency of the gravel ballast and the concrete ballast on a proper level of maintenance activities. As the method based on history path is difficult to obtain sufficient reliabilities cause of an absence of real data for maintenance activities, we chose the delphi survey method by professional group, and we obtained the appropriate index and profiles for maintenance activities. As a result, we founded that effects for cost reduction can be expected by preventive maintenance management, and we proposed economical restrictions and life cycle cost for track ballast structures in a life cycle.