• 제목/요약/키워드: Maintenance Planning

검색결과 832건 처리시간 0.027초

지하철 터널에서 유지관리계측의 문제점 분석 및 개선방안 (Analysis for the Problem and Improvement of Maintenance Monitoring in Subway Tunnel)

  • 우종태;김종수;이송
    • 한국구조물진단유지관리공학회 논문집
    • /
    • 제5권4호
    • /
    • pp.161-167
    • /
    • 2001
  • By means of analyzing the problems in monitoring plan, design, installation, operation based on maintenance monitoring system installed in subway tunnel section, the improved methods of were proposed for applying to subway monitoring maintenance effectively in the future. The choice of the better monitoring system, the operating method of monitoring system, the confidence and continuity of maintenance monitoring, the performance of responsible monitoring supervision in the phase of the planning of monitoring and design were proposed. The problem and developed plan in the different monitoring systems, the calibration and correction of monitoring system, the analysis for the results and plan for maintenance in the phase of installation of monitoring system and operation were also proposed.

  • PDF

장래교통수요예측을 고려한 도로 유지관리 방안 (Road Maintenance Planning with Traffic Demand Forecasting)

  • 김정민;최승현;도명식;한대석
    • 한국도로학회논문집
    • /
    • 제18권3호
    • /
    • pp.47-57
    • /
    • 2016
  • PURPOSES : This study aims to examine the differences between the existing traffic demand forecasting method and the traffic demand forecasting method considering future regional development plans and new road construction and expansion plans using a four-step traffic demand forecast for a more objective and sophisticated national highway maintenance. This study ultimately aims to present future pavement deterioration and budget forecasting planning based on the examination. METHODS : This study used the latest data offered by the Korea Transport Data Base (KTDB) as the basic data for demand forecast. The analysis scope was set using the Daejeon Metropolitan City's O/D and network data. This study used a traffic demand program called TransCad, and performed a traffic assignment by vehicle type through the application of a user equilibrium-based multi-class assignment technique. This study forecasted future traffic demand by verifying whether or not a realistic traffic pattern was expressed similarly by undertaking a calibration process. This study performed a life cycle cost analysis based on traffic using the forecasted future demand or existing past pattern, or by assuming the constant traffic demand. The maintenance criteria were decided according to equivalent single axle loads (ESAL). The maintenance period in the concerned section was calculated in this study. This study also computed the maintenance costs using a construction method by applying the maintenance criteria considering the ESAL. The road user costs were calculated by using the user cost calculation logic applied to the Korean Pavement Management System, which is the existing study outcome. RESULTS : This study ascertained that the increase and decrease of traffic occurred in the concerned section according to the future development plans. Furthermore, there were differences from demand forecasting that did not consider the development plans. Realistic and accurate demand forecasting supported an optimized decision making that efficiently assigns maintenance costs, and can be used as very important basic information for maintenance decision making. CONCLUSIONS : Therefore, decision making for a more efficient and sophisticated road management than the method assuming future traffic can be expected to be the same as the existing pattern or steady traffic demand. The reflection of a reliable forecasting of the future traffic demand to life cycle cost analysis (LCCA) can be a very vital factor because many studies are generally performed without considering the future traffic demand or with an analysis through setting a scenario upon LCCA within a pavement management system.

철도급전시스템의 신뢰도기반 점검주기 산정 (The Evaluation of Inspection Period based on Reliability in Railway Traction Power Systems)

  • 김형철
    • 전기학회논문지
    • /
    • 제62권8호
    • /
    • pp.1177-1183
    • /
    • 2013
  • In this paper, the analysis of inspection period bases on reliability is suggested in the field of traction power system. Even though there are several maintenance models, the most commonly used maintenance assessment has been focused on time based maintenance in real traction power systems. The maintenance intervals are selected on the basis of long-time experience. It ensures high availability and exact planning of staff. Reliability centered maintenance, which evaluates criticality and severity of each failure mode, achieves the operation, maintenance, and cost-effective improvement that will manage the risks of equipment. This paper deals with electrification in railway inspection frequency and applied reliability based inspection frequency instead of constant intervals. The distribution function of failure rate in traction power system belongs to Weibull function. Also, the fault data and the number of installed equipments for electrifications are collected. The failure history is investigated and classified in detail. Though these complicated procedures, it contribute to extend equipment lifetime and to reduce maintenance costs.

BIM기반 제주 공공청사 통합 유지관리 시스템 구축 방안 (A Study on BIM based the Establishment of Integrated Maintenance System for Government Office Building in Jeju)

  • 김한준;장명훈
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2020년도 가을 학술논문 발표대회
    • /
    • pp.57-58
    • /
    • 2020
  • Recently, government office buildings have become important in reducing maintenance costs. However, the loss of information raised a problem for maintenance work that could not meet the needs of users. Therefore, this study proposed a BIM-based integrated maintenance system for public offices in Jeju to efficiently maintenance work. The system can be integrated with IoT sensors, big data and artificial intelligence technologies to integrate information that occurs throughout the building's entire life cycle to exchange information. This system is also scalable to buildings, plants, region and urban infrastructure facilities as well as single buildings. It is expected that the system will provide reliable, high-quality, real-time information for efficient maintenance work, thereby supporting decision making and appropriate budget planning.

  • PDF

M&S기법을 활용한 장보고 II급 잠수함 수명주기비용 추정 (Life Cycle Cost Estimation for Jangbogo-II Submarines based on Modeling and Simulation Methodologies)

  • 안재경;최봉완;이용규
    • 산업공학
    • /
    • 제23권3호
    • /
    • pp.221-228
    • /
    • 2010
  • With the development of science and technology, modern submarines are equipped with high technology devices and multi-functioned precise armaments, consequently, acquisition cost as well as maintenance cost of the submarines are getting higher and higher. However, tight defense budget forces navy to significantly reduce military operating and maintenance costs. In this study, the maintenance and operating costs of submarine Jangbogo-II are estimated through M&S (Modeling and simulation) methodologies in order to reasonably and consistently work out the requirement verification system of Jangbogo-II. The maintenance and operating costs of Jangbogo-II along the next 25 years are estimated as 312.65 billion won via engineering analysis methods while 312.69 billion won from PRICE Model, which shows only 0.04 billion won differences as a whole. This study is expected to be able to provide meaningful decision making data for not only short and/or mid term operating planning but military budgeting.

지역주민 특성이 친수공간의 유지관리 활동에 미치는 영향 - 일본 치바현 카즈사지구의 사례 - (Effect of Personal Character of Rural Residents on Management Activities for Amenity Oriented Waterside Area - A Case of Kazusa District, Chiba Pref, Japan -)

  • 양용석;김선주;센가유타로
    • 농촌계획
    • /
    • 제11권4호
    • /
    • pp.1-8
    • /
    • 2005
  • For the purpose of finding correlation between the characteristics of the rural residents and the maintenance activities of naturally favorable waterside spaces, this paper has conducted a research with the focus on the three model case regions in Japan. The methods of the research included surveys, interviews, and documents. The research confirmed that the three regions in focus have characteristics distinct from one another. The rate of participation in group activities was high in a region, with members that belong to groups most active in the maintenance activities. Reasons for their participation included: to manage the local area themselves; and to promote cooperation and friendships among the residents. This proves that participation in the maintenance activities has also attributed to the formation of close communities in the regions. According to the analytic conclusion of the factors related to participation, the residents' experience to have been involved in a professional education program which induces communal participation, acted more as the major factor than the individual ones.

Built-in guide 타입 다중 로봇의 고층 빌딩 외벽 청소를 위한 센서 기반 운동 계획 알고리즘 (Sensor-based Motion Planning Algorithm for High-rise Building Facade Cleaning of Built-in Guide Type Multi-Robot)

  • 이승훈;김동형;강민성;길명수;김영수;백성훈;한창수
    • 제어로봇시스템학회논문지
    • /
    • 제18권5호
    • /
    • pp.445-452
    • /
    • 2012
  • With the increasing number of high-rise and large-scale buildings, modern buildings are becoming intelligent, and are incurring high construction costs and requiring careful maintenance. Maintenance works for high-rise buildings significantly depend on human labor, unlike other construction processes that are gradually being automated. The resulting accidents may produce very high social and economic losses. To address this problem, herein, this paper proposes robotic building maintenance system using multi-robot concept, in specific, cleaning a building facade which is directly subjected to minimize human labor; that improves the process efficiency and economic feasibility. The sensor for detecting contamination of building's outer-wall glass is proposed; Kalman filter was used for estimating robots' status with the contamination of the window glass. Task allocation of the sensor based multi-robots for an effective way of task execution is introduced and the feasibility was verified through the simulations.

고혈압노인의 신체활동 유지 예측요인 (Predictors of Maintenance of Physical Activity among Hypertensive Older Adults in Korea)

  • 최진이;장애경;이은주
    • 근관절건강학회지
    • /
    • 제22권3호
    • /
    • pp.228-235
    • /
    • 2015
  • Purpose: The purpose of this study was to examine factors related with the maintenance of physical activity in Korean old adults with hypertension based on the social cognitive theory. Methods: A cross-sectional survey of 300 old adults with hypertension from five public health centers in Korea was conducted using a self-reported questionnaire. Participants were designated as "maintainer" or "discontinuer" based on the reports to the Stages of Readiness to exercise Questionnaire. Results: One hundred seventeen participants (39%) were designated as maintainers. The predictors of the maintenance of physical activity were gender (OR=3.19, p=.049), education (OR=3.50, p=.049), outcome expectation (OR=1.21, p<.001), self-efficacy (OR=.22, p=.007), and physical activity planning (OR=1.19, p=.002). Conclusion: Findings from this study suggest that nursing interventions to improve the maintenance of physical activity in the hypertensive elderly should focus on increasing outcome expectation, self-efficacy, and physical activity planning strategies especially on the female elderly with lower education level.

국도 포장의 장기 공용성 추정 및 유지관리 방안 (Performance Estimation and Maintenance Method for Road Pavement Sections)

  • 이영욱;도명식;이종달;장민균
    • 한국방재학회:학술대회논문집
    • /
    • 한국방재학회 2007년도 정기총회 및 학술발표대회
    • /
    • pp.125-129
    • /
    • 2007
  • In this paper, a PMS(Pavement Management System) application is presented to control the LCC(Life Cycle Cost) of road pavement. The aim of this paper is to provide the decision makers with the planning information regarding maintenance strategies for efficient road pavement management. The validity of PMS application presented in this paper is investigated through case studies for conducted for 22 national highway road sections in Korea.

  • PDF

Hedging point in the production control of failure prone manufacturing systems

  • 엄완섭
    • 한국경영과학회:학술대회논문집
    • /
    • 대한산업공학회/한국경영과학회 1996년도 춘계공동학술대회논문집; 공군사관학교, 청주; 26-27 Apr. 1996
    • /
    • pp.377-380
    • /
    • 1996
  • Most manufacturing systems are large and complex. It is natural to divide the control into a hierarchy consisting of a number fo different levels. Each levels is characterized by the length of the planning horizon and the kind of data required for the decision making process. This paper describes an approach for the incorporation of Maintenance times into a hierachical scheduling for a failure prone flexible manufacturing system. The Maintenance should not be performed too often because of the resulting reduction of capacity. The machine failure and preventive maintenance are considered simultaneously.

  • PDF