• Title/Summary/Keyword: Maintenance Interval

Search Result 205, Processing Time 0.021 seconds

Channel-forming Discharge Evaluation for Rivers with High Coefficients of River Regime (하상계수가 큰 하천의 하도형성유량 산정)

  • Ji, Un;Jang, Eun Kyung;Yeo, Woon Kwang
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.31 no.4B
    • /
    • pp.361-367
    • /
    • 2011
  • The channel-forming discharge, which is a standard and single flow for the river maintenance and restoration project, should be estimated necessarily in the stable channel design. It is difficult to produce the specific pattern for the channel-forming discharge in the domestic rivers due to the insufficient researches and case studies. Also, it is improper to adopt the foreign cases for the domestic rivers and streams which have the high coefficients of river regime. Therefore, the channel-forming discharge possible to use for rivers with high coefficients of river regime is suggested in this study through analyzing the bankfull, specified recurrence interval, and effective discharges of Mangyeong River, Cheongmi Stream, and Hampyeong Stream for the abandoned channel restoration project. The bankfull discharge was calculated with geometric data using the HEC-RAS modeling and the flow, bed materials, and sediment data for the study reaches were used to estimate the specified recurrence interval and effective discharges. As a result for calculating the channel-forming discharge, the effective discharge was greater than the bankfull discharge in the river with high coefficient of river regime and the effective discharge was greater than the bankfull and there was no correlation between the coefficient of river regime and the characteristics of the specified recurrence interval discharges.

Calculation of Sediment Volume of the Agriculture Reservoir Using DGPS Echo-Sounder (DGPS 음향 측심기를 이용한 농업용 저수지의 퇴적량 산정)

  • Park Seung-Ki;Jeong Jae- Hoon
    • Spatial Information Research
    • /
    • v.13 no.3 s.34
    • /
    • pp.297-307
    • /
    • 2005
  • This study was performed to get the basic data for the dredging project and logical maintenance of the Yaedang reservoir. The survey of reservoir capacity for calculation of sediment volume carried out using DGPS Echo-Sounder during November $25\~30$ in 2004. The latitude and longitude signal from GPS satellite was received a second interval with the UTM coordinate system. Water depth was measured 0.2 second interval by Echo-sounder sensor in MIDAS Surveyor. The UTM coordinate datum were transformed into standard coordinate datum of Korean(TM coordinate datum) using Arc Info System. Mapping of contour was used Sufer, Arc View and Auto CAB Program Storage capacity of Yaedang reservoir was estimated by average contour area method. Result of this time investigation for useful storage determination of Yaedang reservoir was showed 4,601.585 ha-m and was differenced less 5.425ha-m the bygones useful storage.

  • PDF

Fatigue life prediction based on Bayesian approach to incorporate field data into probability model

  • An, Dawn;Choi, Joo-Ho;Kim, Nam H.;Pattabhiraman, Sriram
    • Structural Engineering and Mechanics
    • /
    • v.37 no.4
    • /
    • pp.427-442
    • /
    • 2011
  • In fatigue life design of mechanical components, uncertainties arising from materials and manufacturing processes should be taken into account for ensuring reliability. A common practice is to apply a safety factor in conjunction with a physics model for evaluating the lifecycle, which most likely relies on the designer's experience. Due to conservative design, predictions are often in disagreement with field observations, which makes it difficult to schedule maintenance. In this paper, the Bayesian technique, which incorporates the field failure data into prior knowledge, is used to obtain a more dependable prediction of fatigue life. The effects of prior knowledge, noise in data, and bias in measurements on the distribution of fatigue life are discussed in detail. By assuming a distribution type of fatigue life, its parameters are identified first, followed by estimating the distribution of fatigue life, which represents the degree of belief of the fatigue life conditional to the observed data. As more data are provided, the values will be updated to reduce the credible interval. The results can be used in various needs such as a risk analysis, reliability based design optimization, maintenance scheduling, or validation of reliability analysis codes. In order to obtain the posterior distribution, the Markov Chain Monte Carlo technique is employed, which is a modern statistical computational method which effectively draws the samples of the given distribution. Field data of turbine components are exploited to illustrate our approach, which counts as a regular inspection of the number of failed blades in a turbine disk.

Reliability Evaluation of Compressive Strength of Reinforced Concrete Members (철근 콘크리트 구조 부재의 압축강도 추정 신뢰도 평가)

  • Hong, Seong-Uk;Park, Chan-Woo;Lee, Yong-Taeg;Kim, Seung-Hun
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.23 no.6
    • /
    • pp.132-140
    • /
    • 2019
  • In this study, a specimen composed of columns, walls, beams, and slabs was fabricated to investigate the estimated reliability using nondestructive test method for the location of structural members of reinforced concrete single layer structures. And for accurate analysis in the comparison process with the existing estimation formula, we try to analyze the reliability through statistical approach by using error rate comparison and Confidence interval estimation. As a result, The average error rate of the core test was 18.8% compared with the result of estimating the compressive strength using the ultrasonic pulse velocity method. The average error rate of the core test results compared with the result of estimating the compressive strength using the rebound hardness method was 20.1%, confirming the field applicability. it is judged that the reliability of the compressive strength estimation can be derived from the wall member to make a quick and efficient structure safety diagnosis using the ultrasonic pulse velocity method. In addition, it is judged that the reliability of the compressive strength estimation can be derived from the beam member to make a quick and efficient structure safety diagnosis using the rebound hardness method.

Punching Shear Performance Evaluation of Foundation by Enforcement-length of Shear Head Reinforcement (전단 보강재의 보강길이에 따른 기초판의 뚫림전단 성능평가)

  • Lee, Yong-Jae;Yi, Waon-Ho;Yang, Won-Jik
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.21 no.2
    • /
    • pp.60-68
    • /
    • 2017
  • This study was made to examine the motion characteristics according to the reinforcement of the reinforcement length and stiffener reinforcement for shear reinforcement to the foundation structure reinforced with shear reinforcement steel plate. Experimental study was made after specimen was installed on the ground as the same as in the practical site. Reinforcement lengths of the steel for shear reinforcement are divided into 1,000 mm, 1,200 mm and 1,400 mm in the specimen and as for reinforcement method of the stiffener, 4 stiffeners with interval of 100mm reinforced with the same materials as the shear reinforcement were manufactured for the experiment. Considering result of the experiment, it is expressed that no effect of the stiffener reinforcement was found and regarding the reinforcement length of shear reinforcement material the crossed point of the two converted lines of the value that the shear force is expressed in the bearing power in the expanded dangerous section and the value that the shear capacity receivable by the reinforcement materials in the dangerous section is proposed as effective reinforcement length.

A Study for Determining the Rehabilitation Method Group using NHPCI on Asphalt Concrete Pavement of National Highway (국도 아스팔트 포장의 NHPCI(National Highway Pavement Condition Index)를 활용한 보수공법그룹 결정에 관한 연구)

  • Son, Hyeon Jang;Kwon, Soo-Ahn;Lee, Jae Jun;Baek, Cheolmin;Lim, Jae Kuy;Sin, Hyun Jin
    • International Journal of Highway Engineering
    • /
    • v.15 no.2
    • /
    • pp.1-9
    • /
    • 2013
  • PURPOSES : The PMS(Pavement Management System) has been utilized in order to efficiently allocate the limited budget for the maintenance of national highway system. In the PMS of national highway, surface pavement condition is evaluated by using the VI (Visual Index). However, the VI is determined only by considering the cracking rate (%) and rut depth (mm), which is not reflecting the IRI (International Roughness Index) that is known as an important factor of pavement performance. In this study, the NHPCI (National Highway Pavement Condition Index) which includes the cracking rate (%), rut depth (mm), and IRI (m/km) is suggested for determining the rehabilitation methods group. METHODS : First, the rehabilitation methods performed between 2008 and 2010 on the national highway is classified and then, NHPCI is determined for each rehabilitation method. Next, the NHPCI for each rehabilitation method is grouped through the interval estimation of the population mean and T-test analysis. RESULTS : According to NHPCI range, the rehabilitation methods are divided into four categories: Not Required, Preventive Maintenance, Overlay Treatment (with or without cutting), and Full-scale Treatment (i.e., reconstruction). CONCLUSIONS : Based on this study, it is recommended that the appropriate NHPCI range should be determined through the combination of the rehabilitation categories and Decision Procedure of Pavement Distress Condition Visual Index.

Effect of Repeated Addition of Admixture on Mechanical Properties of Concrete (혼화제의 반복된 추가가 콘크리트의 역학적 특성에 미치는 영향)

  • Lee, Si-Woo;Yi, Seong-Tae
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.14 no.4
    • /
    • pp.148-153
    • /
    • 2010
  • Concrete used as structural materials in construction fields is supplied as a type of carry and placement by ready-mixed concrete (RMC) truck after proportioning in batch plant. However, during conveying of concrete to the field, due to traffic jam, weather, etc., it is not easy to maintain adequate slump. In this case, we think that the insert of an admixture to concrete has no problem in concrete. For RMC, when the slump is not sufficient, the truck driver insert water additionally without any considerations. After that, concrete is placed after re-mixing and this leads to serious reasons such as strength reduction less than design strength considered in the structural design. Accordingly, in this study, to solve the problem to insert water without realistic reasons in RMC, basic experimental studies were performed. Admixtures used frequently in fields were selected and addition's repeated time and elapsed time interval after initial addition of the admixture were selected as main variables. Authors want that the results of this study is used as basic data to resolve the question.

Early radiographic diagnosis of peri-implantitis enhances the outcome of peri-implantitis treatment: a 5-year retrospective study after non-surgical treatment

  • Chang, Hee-Yung;Park, Shin-Young;Kim, Jin-Ah;Kim, Young-Kyun;Lee, Hyo-Jung
    • Journal of Periodontal and Implant Science
    • /
    • v.45 no.3
    • /
    • pp.82-93
    • /
    • 2015
  • Purpose: This retrospective study evaluated the relationship between the timing of peri-implantitis diagnosis and marginal bone level after a 5-year follow-up of non-surgical peri-implantitis treatment. Methods: Thirty-three patients (69 implants) were given peri-implantitis diagnosis in 2008-2009 in Seoul National University Bundang Hospital. Among them, 31 implants from 16 patients were included in this study. They were treated non-surgically in this hospital, and came for regular maintenance visits for at least 5 years after peri-implantitis treatment. Radiographic marginal bone levels at each interval were measured and statistical analysis was performed. Results: Timing of peri-implantitis was one of the significant factors affecting initial bone loss and total bone loss not additional bone after peri-implantitis diagnosis. Patients with cardiovascular disease and diabetic mellitus were positively influenced on both initial bone loss and total bone loss. Patients who needed periodontal treatment after implant placement showed a negative effect on bone loss compared to those who needed periodontal treatment before implant placement during entire periods. Implant location also significantly influenced on amounts of bone loss. Mandibular implants showed less bone loss than maxillary implants. Among surgical factors, combined use of autogenous and xenogenic bone graft materials showed a negative effect on bone loss compared to autogenous bone graft materials. Use of membrane negatively affected on initial bone loss but positively on additional bone loss and total bone loss. Thread exposure showed positive effects on initial bone loss and total bone loss. Conclusions: Early peri-implantitis diagnosis led to early non-surgical intervention for peri-implantitis treatment, which resulted in the maintenance of the bone level as well as preservation of the implant.

A Parametric Study on Effects of Column Shortening Analytical Correction Using Measured Results in RC Tall Buildings (RC 고층 건물에서 계측 결과를 이용한 기둥축소 해석보정의 효과에 대한 변수 연구)

  • Song, Eun-Seok;Kim, Jae-Yo
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.24 no.4
    • /
    • pp.38-47
    • /
    • 2020
  • A parametric study for analytical correction using measurement results was performed to minimize errors in the predictions of column shortening in RC tall building. The parameters of the column shortening analytical correction are the execution standard of analytical correction, the value of the analytical correction, and the measurement location, and the analytical correction models with the parameters were applied to the construction sequence analysis of a 41-story RC building to compare and analyze the correction effect according to the parameter. The reduction ratio of the error value for each floor was compared with the number of corrections and the total corrected value, and it was confirmed that the error tended to be minimized when the execution standard of analytical correction was performed based on a regular interval, when the analysis correction value was corrected by the error value, and when the measurement position was measured every floor. From this, it was confirmed that the most appropriate analytical correction model can be derived by applying multiple analytical correction models to the actual analysis model.

Risk Factors and Clinical Outcomes of Unplanned Reintubation after Planned Extubation in Adult Patients admitted to the Intensive Care Unit after Cardiac Surgery (성인 심장수술 후 중환자실에 입실한 환자의 계획된 발관 후 비계획적 기관 재삽관 위험요인과 임상결과)

  • Lee, Ju-Hee;Choi, Hye-Ran
    • Journal of Korean Critical Care Nursing
    • /
    • v.15 no.3
    • /
    • pp.88-100
    • /
    • 2022
  • Purpose : This study aimed to identify risk factors for unplanned reintubation after planned extubation and to analyze the clinical outcomes in patients admitted to the intensive care unit after cardiac surgery. Methods : The study examined patients who underwent intubation and planned extubation admitted to the intensive care unit after cardiac surgery between January 1, 2017, and December 31, 2021. The reintubation group comprised 58 patients underwent unplanned reintubation within 7 days of planned extubation. The maintenance group comprised 116 patients who did not undergo reintubation and were matched with the reintubation group using the rational for matching criteria. Data were collected retrospectively from electronic medical records. We used the independent t-test, Mann-Whitney U test, 𝑥2-test, Fisher's exact test, and logistic regression analysis with SPSS/WIN 27.0. Results : The multivariate logistic regression analysis demonstrated that albumin (odds ratio [OR]=0.38, 95% confidence interval [CI]=0.20-0.72), surgery time (OR=1.54, 95% CI=1.20-1.97), PaO2 before extubation (OR=0.85 per 10 mmHg, 95% CI=0.75-0.97), postoperative arrhythmia (OR=2.82, 95% CI=1.22-6.51), reoperation due to bleeding (OR=4.65, 95% CI=1.27-17.07), and postoperative acute renal failure (OR=2.97, 95% CI=1.09-8.04) were risk factors for unplanned reintubation. The reintubation group had a higher in-hospital mortality rate (𝑥2=33.74, p<.001), longer intensive care unit stay (Z=-7.81, p<.001), and longer hospital stay than the maintenance group (Z=-8.29, p<.001). Conclusion : These results identified risk factors and clinical outcomes of unplanned reintubation after planned extubation after cardiac surgery. These findings should be considered when developing and managing an intervention program to prevent and reduce the incidence of unplanned reintubation.