• Title/Summary/Keyword: Mainline Section

Search Result 12, Processing Time 0.039 seconds

Integrated Traffic Management Strategy on Expressways Using Mainline Metering and Ramp Metering (본선미터링과 램프미터링을 이용한 고속도로 통합교통관리 전략)

  • Jeong, Youngje;Kim, Youngchan;Lee, Seungjun
    • The Journal of The Korea Institute of Intelligent Transport Systems
    • /
    • v.12 no.2
    • /
    • pp.1-11
    • /
    • 2013
  • This research proposed integrated expressway traffic management strategy using ramp metering and toll mainline metering. This research suggested a traffic signal optimization model for integrated operation of ramp and mainline metering based on Demand-Capacity Model that is used to optimize allowable input volume for ramp metering in FREQ model. The objective function of this model is sectional throughput volume maximization, and this model can calculate optimal signal timings for mainline metering and ramp metering. This study conducted an effectiveness analysis of integrated metering strategy using PARAMICS and its API. It targeted Seoul's Outer Ring Expressway between Gimpo and Siheung toll gate. As a simulation result, integrated operation of mainline and ramp metering provided more smooth traffic flow, and throughput volume of mainline increased to 14% in congested section. In addition, a queue of 400 meter was formed at metering point of toll gate. This research checked that integrated traffic management strategy facilitates more efficient traffic operation of mainline and ramp from diffused traffic congestion.

The Effectiveness Analysis on Set of Ramp Metering STOP-line Using Traffic Simulation Model (교통시뮬레이션 모형을 이용한 램프미터링 정지선 설정에 따른 효과분석)

  • Kim, In Su;Yang, Choong Heon
    • International Journal of Highway Engineering
    • /
    • v.16 no.1
    • /
    • pp.111-118
    • /
    • 2014
  • PURPOSES : This study performs fundamental research on ramp-metering design criteria. METHODS : We carefully review previous studies in terms of ramp-metering design criteria and then consider applicability in Korea. For this, traffic simulation model is employed to analyze actual effect according to specific location of stop-line when implementing ramp-metering. RESULTS : When a stop-line moving forward with a 50m interval, travel speed at mainline relative to current stop-line location tends to decrease. However, traveling speed at approach roads increase about 5~18% under the same condition. When a stop-line location moving backward with a 50m interval, mainline travel speed increase approximately 17~32% whereas traveling speed at approach roads decrease. All cases are compared with the current stop-line location. CONCLUSIONS : We believe that both cases are useful with respect to freeway management. For example, moving forward a stop-line case can be used management for queuing area at ramp section and approach roads. Moving backward a stop-line case can be used for traffic control, focusing on mainline of freeways.

A Mainline Metering Strategy at Toll Plaza Considering Queue Imbalance Among Lanes (차로간 Queue 불균형을 고려한 Toll Plaza 본선미터링 전략)

  • Jang, Sunghoon;Lee, Yong-Gwan;Kho, Seung-Young;Lee, Chungwon
    • Journal of Korean Society of Transportation
    • /
    • v.33 no.1
    • /
    • pp.1-13
    • /
    • 2015
  • This study aims to develop a mainline metering strategy considering queue imbalance among lanes that can reduce congestion at a toll plaza section by managing queue caused by mainline metering. The suggested strategy considers simultaneously optimizing the number of cars in merging area and managing queue by lane. This study analyzes the effectiveness of the strategy with respect to the average travel time and the occurrence rate of spillback using the PARAMICS. The results show that the suggested strategy has an effect on reducing congestion and improving operation efficiency at toll plaza. In particular, the congestion become more intensified when the length of waiting space is shorter; however, this study shows that the suggested strategy can relieve the congestion in that condition.

Constructing the Models Estimated for Speed Variation on the Merge Section in the Freeway (고속도로의 합류구간내 속도변화 추정모형 구축에 관한 연구)

  • 신광식;김태곤
    • Journal of Korean Port Research
    • /
    • v.13 no.1
    • /
    • pp.113-122
    • /
    • 1999
  • Congestion and traffic accidents occur on the merge and diverge sections in the interchange of the freeway. Studies have been conducted to reduce the traffic delay and accidents on the merge section in the freeway since 1960s. but a study was not conducted to estimate the speed variation on the merge section construct models estimated for the speed variation and suggest the appropriate measures. The purpose of this study was to identify the traffic flow characteristics on the merge section in the freeway construct the models estimated for the speed variation on the merge section in the freeway and finally establish the appropriate measure for reduction of traffic delay and accidents on the merge section in the freeway. The following results were obtained: I) Speed variations in the urban freeway appeared to be about 3.2mph, 6.5mph and 7.4mph based on the morning peak period, afternoon peak period and 24-hours period but those in the suburban freeway appeared to be about 8.0mph, 11.1mph and 10.1mph based on the same periods respectively. So different speed reduction signs need be installed to reduce delay and accidents on the merge section in the freeway based on the areas and periods as the freeway traffic management system(FTMS). ii) These models estimated for speed variation need to be studied with the changeable message sign(CMS) technique based on the real-time data so that the traffic flow could be maximized and the traffic delay and accidents be on the merge section in the freeway as more efficient freeway traffic management system(FTMS) in the near future.

  • PDF

The Ramp Metering System Construction of Urban Freeway by the Intelligent Transportation System (ITS) Technology (첨단교통체계(ITS)에 의한 도시고속도록의 Ramp Metering 시스템 구축에 관한 연구)

  • 김태곤
    • Journal of Korean Port Research
    • /
    • v.13 no.2
    • /
    • pp.333-350
    • /
    • 1999
  • Today freeway is thought to be a very important transportation facility carrying tremendous traffic flow as the main corridor within the area of between the areas. However freeway is experiencing severe congestion and accidents by increased entrance ramp flow especially at peak time period. Ramp meters on the freeway entrance ramps that supply traffic to the freeway in a measured or appropriately regulated amount are needed for alleviating freeway congestion. Because ramp meters can be operated to discharge traffic at a measured or regulated rate thus maintaining more uniform speed on the mainline section maximizing the throughput to the freeway within the capacity of a downstream bottleneck and reducing the congestion related accidents. Thus the objectives in this study were to analyze the traffic characteristics on the freeway I-94 with ramp metering system before/after ITS technology in Detroit (Michigan) area compare shifts of the traffic characteristics on the freeway I-94 before/after ITS technology and finally suggest a better ramp metering strategy for the freeway system The following results were obtained: i)Flow occupancies and speeds on the mainline merge section of freeway were shown to be a big difference depending on the peak periods areas and directions based on the distribution of traffic flow characteristics on the freeway. ii)Reduced speed was shown to be more than 5 mph and ramp flow was also shown to be more than 240 vph at peak periods if there was the ramp metering system constructed on the freeway. iii)Ramp metering system was shown to be optimally operated on the freeway if ramp flow could be maximized within the range of over 900 vph and reduced occupancy could be also maximized by no more than 2 percent at peak periods. iv)The average flows on the freeway after the ITS technology were shown to be a decrease of over 20% depending on the peak periods areas and directions when compared with those flow on the freeway before the ITS technology. over 20% depending on the peak periods areas and directions when compared with those speeds on the freeway before the ITS technology. vi)The average metering rates on the freeway after the ITS technology were shown to be an increase of over 10% depending on the peak periods areas and directions when compared with those metering rates on the freeway before the ITS technology.

  • PDF

Analysis of Lane-Changing Distribution within Merging and Weaving Sections of Freeways (고속도로 합류 및 엇갈림구간에서의 차로변경 분포 분석에 관한 연구)

  • Kim, Yeong-Chun;Kim, Sang-Gu
    • Journal of Korean Society of Transportation
    • /
    • v.27 no.4
    • /
    • pp.115-126
    • /
    • 2009
  • The lane-change behavior usually consists of discretionary lane-change and mandatory lane-change types. For the first type, drivers change lanes selectively to maintain their own driving condition and the second type is the case that the drivers must change the current lane, which can occur in recurrent congestion sections like merging and weaving sections. The mandatory lane-change behavior have a great effect on the operation condition of freeway. In this paper, we first generate data such as traffic volumes, speeds, densities, and the number of lane-change within the merging and weaving sections using the data of individual vehicle collected from time-lapse aerial photography. And then, the data is divided into the stable and congested flow by analyzing the speed variation pattern of individual vehicles. In addition, the number of lane-changing from ramp to mainline within every 30-meter interval is investigated before and after traffic congestion at study sites and the distribution of lane-changing at each 30-meter point is analyzed to identify the variation of lane-changing ratio depending on the stable and congested flows. To recognize the effect of mainline flow influenced by ramp flow, this study also analyzes the characteristics of the lane-changing distributions within the lanes of mainline. The purpose of this paper is to present the basic theory to be used in developing a lane-changing model at the merging and weaving sections on freeways.

Introduction of PCC Pavement Sections and Associated Research in KHC Test Road

  • Kim, Ji-Won;Kwon, Soon-Min;Lee, Jae-Hoon;Kim, Do-Wan
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2003.05a
    • /
    • pp.197-203
    • /
    • 2003
  • Korea Highway Corporation(KHC) began the ambitious KHC Test Road construction project from 1997. It is 7.7km long two-lane highway next to the mainline of Jungbu Inland Expressway. The KHC Test Road construction was completed at the December 2002. It is composed of twenty-five PCC test pavement sections. Section design parameters are (1) concrete slab thickness, (2) base type, (3) base thickness (12, 15, and 18cm), and (4) pavement type. Twenty-five PCC test pavement sections contain 1241 sensors to evaluate the behavior of pavement system under traffic load and environmental change. The behavior of pavement systems will be identified by the observation of sensor measurement and pavement distress survey from test pavement sections. The Test Road research outcome will validate the Korean Pavement Design Guide which is develop by on-going funded research from the Ministry of Construction and Transportation.

  • PDF

A study on Protective Coordination of MCA for Performing of the Pad Mounted Transformer's inside Protective Device (지상변압기의 내부 보호장비 작동을 위한 MCA 보호협조에 대한 연구)

  • Hyun, Seung-Yoon;Kim, Chang-Hwan
    • KEPCO Journal on Electric Power and Energy
    • /
    • v.8 no.1
    • /
    • pp.5-7
    • /
    • 2022
  • KEPCO's plan is undergoing a trial operation to replace the open-loop section with ring main units configuration where underground distribution lines are installed, by linking the multi-way circuit breakers auto (MCA) on the power side of each pad-mounted transformer. However, ring main units application mentioned above may cause the ripple effects, when implementing the configuration without a study of protection coordination. Because ring main units with classical pre-set protection devices contribution in fault condition didn't consider yet. For the reliable ring main units operation, it is necessary to resolve several protection issues such as the protection coordination with substation side, prevention of the transformer inrush current. These issues can radically deteriorate the distribution system reliability Hence, it is essential to design proper protection coordination to reduce these types of problems. This paper presents a scheme of ring main units' configuration and MCA's settings of time-current curves to preserve the performance of protection coordination among the switchgears considering constraints, e.g. prevention of the ripple effects (on the branch section when a transformer failure occurs and the mainline when a branch line failure occurs). It was confirmed that the propagation of the failure for each interrupter segment could be minimized by applying the proposed TCC and the interrupter settings for the MCAs (branch, transformer). Further, it was verified that the undetected area of the distribution automation system (DAS) could be supplemented by having the MCA configurated ring main units operate first, instead of the internal protection equipment in the transformer such as the fuse, STP when a transformer failure occurs.

A Study on the Length of Deceleration Lane at Freeway Diverging Areas (고속도로 분기부에서의 감속차로 길이에 관한 연구)

  • Kim, Dong Nyong
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.29 no.2D
    • /
    • pp.227-234
    • /
    • 2009
  • At present, the length of deceleration lane at freeway diverging areas are designed based on the design speed of main lines and ramps. This is possible on assumption that diverging vehicles decelerate at deceleration section after moving to shoulder lane in advance. But with high diverging volume, several vehicles will try to change to exit lane at the same time. This will cause the distribution of main lane flows or some vehicles may encounter short deceleration length because they miss the proper time to change the lane. The purpose of this study is to establish a design guideline of the length of deceleration section considering the volume of diverging traffic. Also, the results of analysis by the FRESIM simulation model shows that some improvements in respect of delays, speeds and speed deviations of mainline and deceleration lane.

Derivation of Assessment Scenario Elements for Automated Vehicles in the Expressway Mainline Section (자율주행차 평가 시나리오 구성요소 도출: 고속도로 본선구간을 중심으로)

  • Ko, Woori;Yun, Ilsoo;Park, Sangmin;Jeong, Harim;Park, Sungho
    • The Journal of The Korea Institute of Intelligent Transport Systems
    • /
    • v.21 no.1
    • /
    • pp.221-239
    • /
    • 2022
  • Various elements such as geometry, traffic safety facilities, congestion level, weather, etc., need to be appropriately reflected in the assessment scenario evaluating the driving safety of automated vehicles. Therefore, this study first established a scenario structure and defined the layer of elements, to derive the elements to be reflected in the automated driving safety evaluation. After that, all elemental candidates that can be reflected in each layer were derived by reviewing the relevant literature. Finally, as a result of an expert survey, 77 items were selected to be reflected in the automated driving safety evaluation. The selected elements are expected to be actively utilized in developing scenarios for the driving safety evaluation of automated vehicles in simulation, proving ground, and real road assessments.