• 제목/요약/키워드: Main Contractor

검색결과 60건 처리시간 0.027초

건설공사 발주자의 계획, 설계, 공사단계 안전보건관리 역할 분석 (Analysis on Construction Clients' Role for Safety and Health Management in Plan, Design, and Construction Stage)

  • 임세종;정성춘;나예지;원정훈
    • 한국안전학회지
    • /
    • 제35권3호
    • /
    • pp.24-31
    • /
    • 2020
  • The duty of construction clients in WSH (Workplace Safety and Health) system was included in the amendment of Occupational Safety and Health Act (enforced on 16 January 2020), which was estimated the shift of paradigm in the prevention of construction accidents. The purpose of this paper is to introduce the analysis results of construction clients' role in the construction project, which were performed by authors over the recent years in order to impose the duty on construction clients, and to suggest their role according the plan, design, and construction stage. Utilizing the systematic literature review process based on Meta analysis, the related papers were selected. For the selected papers, related domestic and foreign regulations, and other prominent report, the construction clients' role was analyzed by reflecting the experts' advice. Results show that the construction clients should control the designer and contractor for implementing the WHS system during the whole process of the construction project. They should supply sufficient source and time to ensure the workers' safety. In the plan stage, the key role of construction clients is to identify intensively controlled hazard and risk reduction plan and to transfer the results. In the design stage, their key role is to select the designer with the capacity in WSH and to assist the designer for the safety design. The main key role of construction clients in the costruction stage is to select the contractor with specialty in WSH including a contract reflecting the WSH requirement and to check implementation of WSH plan, WSH cost, WSH education, and accident report. In addition, it is thought that the construction clients' participations in the site WSH activity and adjustment of safety and health problem among contractors can be effect in the prevention of construction accidents.

작업일보 현황 분석에 따른 개선방향 제시 (The Analysis of Current Daily-Report System and The Proposal of Improvement Framework)

  • 김봉년;김창덕;이현수;김선국;서상욱
    • 한국건설관리학회논문집
    • /
    • 제4권2호
    • /
    • pp.66-73
    • /
    • 2003
  • 최근 수행되는 건설프로젝트가 대형화$\cdot$복잡화되면서 많은 공종에서 다양한 협력업체가 투입되게 되며, 기존의 관리 방식으로는 급격히 늘어나는 자원 및 작업의 정보를 관리하는데 한계점이 드러나고 있다. 이러한 현장공사의 효율적인 관리를 위해서 다양한 공사정보 관리 시스템들이 제시되고 있으나, 시공업체 중심의 시스템 관리와 협력 업체의 참여도 및 이해도 부족과 협력업체의 재무, 기술, 관리 측면에서의 영세성으로 인해서 효율적인 적용이 어려운 것으로 나타나고 있다. 또한 현장공사관리에 기초 자료로 제공되는 작업일보의 정보들을 수집/분석/관리하는데 상당한 시간과 인력이 소모되고, 정보의 사용주체와 사업수행단계가 바뀜에 따라 정보가 손실되며, 정보매체 및 입력방법과 입력주체가 바뀜에 따라 정보가 왜곡되고 누락되는 등 다양한 문제점이 나타나고 있다. 따라서 본 연구에서는 현장에서 작성되는 작업일보에서 인력/작업 정보 수집의 현황을 파악하여 작업일보의 기능 및 문제점을 분석하고, 작업일보의 업무 및 정보흐름을 분석하여 개선방향을 제시하는 것을 목적으로 하고 있다. 더 나아가, 작업일보의 작성프로세스를 개선하고, 협력업체 중심의 정보입력 및 관리를 통한 공사의 생산성을 향상시킬 수 있는 작업일보의 개선방향을 제시하고자 한다.

위탁급식전문업체, 고객사, 고객 측면에서 위탁급식업의 지적자본 지표간 인과관계 분석을 통한 다자간 활용도 탐색 (Directional Analysis on Intellectual Capital Indicators of Contract Foodservice Management Company in the Viewpoint of Contractor, Client, and Customer)

  • 박문경;양일선
    • Journal of Nutrition and Health
    • /
    • 제38권9호
    • /
    • pp.765-776
    • /
    • 2005
  • The purposes of this study were to a) examine IC (intellectual capital) circumstance of CFMC (contract foodservice management company), b) identify the correlation between IC of CFMC, c) analyze the cause and effect of IC in the viewpoint of contractor, client, and customer. The questionnaires of IC measurement were handed out to 108 CfHCs, there composing of main office employees, foodservice managers, customers, and clients of 207 school, 38 hospital, and 86 business/industry foodservices. The statistical data analysis was completed using SPSS Win (ver 12.0) for descriptive analysis, correlation analysis, simple linear regression analysis. First, CFMCs had operational experience for an average of 8 years and 8 months, and served an average of 38,540 meals a day. Most of the respondent companies operated 'food supply/distribution($50\%$)', 'catering ($46.7\%$)', and restaurant business ($43.3\%$)' except for institutional foodservice and managed an average of 66 clients for the contract period of 2 years and 3 months. Second, there was positive correlation between $\ulcorner$sales of foodservice$\lrcorner$ and 'market ability', $\ulcorner$client satisfaction$\lrcorner$ and necessary intellectual capital for managing branch/chain foodservice office, and $\ulcorner$customer satisfaction$\lrcorner$ and $\ulcorner$renewal and development$\lrcorner$, 'market ability', 'infrastructure support for foodservice operation', 'employee satisfaction', respectively. Finally, the result of the cause and effect analysis on CFMCs, clients, and customers was positively influenced by 'client satisfaction' with 'customer satisfaction', 'infrastructure support for foodservice operation' and 'customer satisfaction' with 'employee satisfaction', and 'infrastructure support for foodservice operation'. In conclusion, if CFMCs were to perform a routine checkups by utilizing CFMC's IC measuring tool, improvements in CFMC operational capacities as well as foodservice quality can be noted. Additionally, CFMCS can satisfy their client-customer relationship by employing internal marketing thechniques for employee, a more efficient infrastructure support system, and construc tive infrastructure utilization. Therefore, CFMCs can show significant improvement in their sales and foodservice quali-ty though continuous maintenance of the client and customer satisfaction.

CONSTRUCTION SCHEDULE DELAY RISK ASSESSMENT BY USING COMBINED AHP-RII METHODOLOGY FOR AN INTERNATIONAL NPP PROJECT

  • HOSSEN, MUHAMMED MUFAZZAL;KANG, SUNKOO;KIM, JONGHYUN
    • Nuclear Engineering and Technology
    • /
    • 제47권3호
    • /
    • pp.362-379
    • /
    • 2015
  • In this study, Nuclear Power Plant (NPP) construction schedule delay risk assessment methodology is developed and the construction delay risk is assessed for turnkey international NPP projects. Three levels of delay factors were selected through literature review and discussions with nuclear industry experts. A questionnaire survey was conducted on the basis of an analytic hierarchy process (AHP) and Relative Importance Index (RII) methods and the schedule delay risk is assessed qualitatively and quantitatively by severity and frequency of occurrence of delay factors. This study assigns four main delay factors to the first level: main contractor, utility, regulatory authority, and financial and country factor. The second and the third levels are designed with 12 sub-factors and 32 sub-sub-factors, respectively. This study finds the top five most important sub-sub-factors, which are as follows: policy changes, political instability and public intervention; uncompromising regulatory criteria and licensing documents conflicting with existing regulations; robust design document review procedures; redesign due to errors in design and design changes; and worldwide shortage of qualified and experienced nuclear specific equipment manufacturers. The proposed combined AHP-RII methodology is capable of assessing delay risk effectively and efficiently. Decision makers can apply risk informed decision making to avoid unexpected construction delays of NPPs.

MOVEMENT CONTROL OF HIGH-RISE BUILDINGS DURING CONSTRUCTION

  • Taehun Ha;Sungho Lee;Bohwan Oh
    • 국제학술발표논문집
    • /
    • The 4th International Conference on Construction Engineering and Project Management Organized by the University of New South Wales
    • /
    • pp.46-51
    • /
    • 2011
  • High-rise buildings are widely being constructed in the Middle-East, South-East, and East Asia. These buildings are usually willing to stand for the landmark of the region and, therefore, exhibit some extraordinary features such as super-tall height, elevation set-backs, overhangs, or free-form exterior surface, all of which makes the construction difficult, complex, and even unsafe at some construction stages. In addition to the elaborately planned construction sequence, prediction and monitoring of building's movement during construction and after completion are required for precise and safe construction. This is often called the Building Movement Control during construction. This study describes Building Movement Control of the KLCC Tower, a 58-story office building currently being built right next to the famous PETRONAS Twin Towers. The main items of the Building Movement Control for the KLCC Tower are axial shortening and verticality. Preliminary prediction of these items are already carried out by the structural design team but more accurate prediction based on construction stage analysis and combined with time-dependent material testing, field monitoring, and site survey is done by the main contractor. As of September 2010, the Tower is under construction at level 30, where the plan abruptly changes from rectangle to triangle. Findings and troubleshooting until the current construction stage are explained in detail and implementations are suggested for future applications.

  • PDF

해양 설비 시장에 관하여

  • 조갑래
    • 한국해양공학회:학술대회논문집
    • /
    • 한국해양공학회 2003년도 추계학술대회 논문집
    • /
    • pp.5-11
    • /
    • 2003
  • This paper present a review of trends in world energy demand and a close outlook over the offshore market, especially in deepwater developments. The market requirements, characteristics and risks involved in the contract type of offshore projects are explained, followed by the strategic approaches of Korean main yards along with, the HHI's development and introduction of innovative construction methodologies to be a competitive contractor.

  • PDF

Construction Delay Risk and its Prevention Measures

  • Acharya, Nirmal Kumar;Lee, Young-Dai;Im, Hae-Man
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2006년도 정기학술발표대회 논문집
    • /
    • pp.268-270
    • /
    • 2006
  • The purpose of this paper was to explore delay avoiding measures and strategies. The paper was based on previous work of authors on finding delay causes. Firstly, the paper has discussed about delay avoidance measures prescribed by the previous work. As the previous study identified five main causes of construction delays, various measures and strategies to overcome those delay problems have been discussed in sequence in the last sections. Major delay prevention strategies are: involving stakeholders in the project decisions, outreach program, realistic time and resource estimation, try to adjust the triple constraints of time, cost and scope, ensure fair and complete disclosure of information at an early stage of the construction project, contractor, itself should inquire about patent design errors prior to submitting its bid, owner should include in its contract with the consultant an indemnity (protection) clause etc.

  • PDF

프리컨스트럭션 서비스 도입을 위한 BIM 기반 설계 최적화 및 시공성 검토 (BIM based Design Optimization and Constructability Improvement for Adoption of Pre-construction Service.)

  • 이창희;이정호
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2017년도 추계 학술논문 발표대회
    • /
    • pp.187-188
    • /
    • 2017
  • Korean government is trying to adopt 'CM at Risk(CMR)' method to solve some problems of traditional project delivery method such as cost increase, delay, low quality. Pre-construction service(PCS) is a project management methodology of CMR and BIM is the best tool for efficient PCS execution. PCS is consisted of several main items such as Target costing, Cost trending, GMP, Design optimization, Constructability review and Productivity. The purpose of this research is to analyse contractor's PCS application case result and to find improvement items.

  • PDF

건설업 위험성 평가 실효성을 위한 최적화 연구 (A Study on the Optimization Effectiveness of Risk Assessment in Construction Industry)

  • 백충현;조을룡
    • 대한안전경영과학회지
    • /
    • 제17권3호
    • /
    • pp.15-22
    • /
    • 2015
  • The risk assessment carried out on the construction site at the beginning of the implementation depends on the subjective judgment of risk of general contractor and subcontractors, whose opinion about frequency and intensity of risk is different. In this paper, research the awareness of general contractors and subcontractors about process of risk assessment at the construction site and its effectiveness. Researching of the main factors "frequency", "intensity" which determines the degree of risk gives the opportunity to find an option for improving the effective implementation of risk assessment.

System Dynamics Approach to Progress Payment Regulations

  • JeongHoon Lee;Moonseo Park;Hyun-Soo Lee;Sungjoo Hwang
    • 국제학술발표논문집
    • /
    • The 5th International Conference on Construction Engineering and Project Management
    • /
    • pp.181-187
    • /
    • 2013
  • The construction market condition is getting worse because of global constructions slow down, low profit, market contraction and so on. For these reason, most construction companies depend on public construction projects which possible to protect construction fee, known as progress payment, by laws. Despite this law, problems of progress payment are constantly occurring and it has been main factors that hinder the construction cost's cash-flow in construction project. To solve this problem, many researchers suggested various solutions but most of solutions were focused on specific target as owner, general contractor, and subcontractor. So, most of solutions were insufficient consider about interaction between contractors. Because of these reasons, it was hard to reflected policy. This research aimed to use system dynamics to develop the model for the application and payment based on the regulations and papers. Also, performed a developed model's verification based on progress payment regulation's basic objectives.

  • PDF