• Title/Summary/Keyword: Machine Scheduling

Search Result 383, Processing Time 0.027 seconds

Object-Oriented Simulation-Based Expert System Using a Smalltalk Paradigm (Smalltalk 패러다임을 이용한 객체지향 시뮬레이션기반 전문가시스템)

  • 김선욱;양문희
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.24 no.66
    • /
    • pp.1-10
    • /
    • 2001
  • Simulation-Based Expert System(SIMBES) is a very effective tool to solve complex antral hard problems. The SIMBES model includes a simulator, a feature extractor, a machine learning system, a performance evaluator, and a Knowledge-Based Expert System(KBES). Since SIMBES depends on Problem domains, a schedule-based material requirements planning problem, which is NP-hard, was selected to exemplify the SIMBES model. To implement the SIMBES application in Smalltalk paradigm, a system class hierarchy was constructed. The hierarchy consists of five large classes such as Job Generator, Job Scheduler, Job Evaluator, Inference Engine, and Executive System. Several classes inside these classes were identified. Additionally, instance protocols about all classes have been described in terms of messages and pseudo methods. These protocols can be implemented easily by any other object-oriented languages. Furthermore, these results may be used as a skeletal system to develop a new SIMBES efficiently, especially when the application is related to other scheduling problems.

  • PDF

Performance Evaluation of ARX Thread Library in Java Virtual Machine (자바 가상 머신을 통한 ARX 쓰레드 라이브러리의 성능 측정)

  • 서양민;박정근;김기정;홍기정
    • Proceedings of the Korean Information Science Society Conference
    • /
    • 1998.10a
    • /
    • pp.157-159
    • /
    • 1998
  • 쓰레드는 프로그램의 동시성을 표현하는데 적합하고, 프로세서 모델에 비하여 동기화나 문맥교환의 비용을 줄일 수 있어 기존의 멀티 프로세스 프로그래밍을 대체하고 있다. 운영체계에서 멀티쓰레팅 환경의 제공은 이제 필수적이며, 좋은 성능을 위해서는 운영체계의 지원이 필요하다. ARX 실시간 운영체계는 유저 레벨 멀티쓰레팅을 지원하고 있으며 쓰레드의 성능을 높이고 유저 레벨에서 실시간 스케쥴링이 가능하도록 하기 위하여 동적 가상 쓰레드 바인딩(dynamic virtual stack binding)과 스케쥴링 이벤트 업콜(scheduling event upcall)등의 기법을 지원한다. 본 논문에서는 자바 가상 머신을 통하여 ARX 운영체계의 쓰레드 라이브러리의 성능을 측정하고 다른 운영체계의 멀티쓰레드 라이브러리와 성능 비교를 하였다. 실험결과 ARX 가 제공하는 쓰레드 라이브러리가 다른 운영체계에 비해 우수한 성능을 보여줌을 확인하였다.

  • PDF

Knowledge-based System for Power Generator Annual Maintenance Scheduling (발전기 연간 정기보수계획을 위한 지식 베이스 시스템)

  • Ahn, Byong-Hun;Kim, Chul;Shin, Jae-Yeong;Lee, Kyung-Jae;Kwon, Tae-Won;Lee, Byung-Ha;Ham, Wan-Kyun
    • Proceedings of the KIEE Conference
    • /
    • 1991.11a
    • /
    • pp.47-50
    • /
    • 1991
  • This paper discusses a knowledge-based system being developed by KAIST and KEPCO to assist planning the annual maintenance schedule of power units. To meet users' requirements, we have designed the system with several features: man-machine interaction, catalog system, user-friendliness, the hybrid-system of math-model and knowledge-base. In this paper, we introduce the outline of our system.

  • PDF

A Study on Work Measurement System Development Applying MODAPTS Technique (MODAPTS 기법을 이용한 작업시간 관리시스템에 관한 연구)

  • 신현표;송한상
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.16 no.27
    • /
    • pp.43-49
    • /
    • 1993
  • The purpose of this study is to develope a computer-generated work measurement system for creating and maintaining standard data as well as labor standards applying MODAPTS(Modular Arrangement of Predetermined Time Standards) technique. The system consists of three major parts. The first part is a work measurement program applying MODAPTS technique for work standards. The second part is a work scheduling program which calculate each operator's machine and job allocations, operation and load schedules, wage and wage incentives and direct labor costs etc. The last part is the case study application program for R-Instrument Manufacturing Industry. The whole system is programmed by dbase-Ⅲ and by pop-up mu for IBM PC compatibles.

  • PDF

A Study on Multi-agent based Task Assignment Systems for Virtual Enterprise (가상기업을 위한 멀티에이전트 기반 태스크할당시스템에 관한 연구)

  • 허준규;최경현;이석희
    • Transactions of the Korean Society of Machine Tool Engineers
    • /
    • v.12 no.3
    • /
    • pp.31-37
    • /
    • 2003
  • With the paradigm shifting from the principal of manufacturing efficiency to business globalism and rapid adaptation to its environments, more and more enterprises are being virtually organized as manufacturing network of different units in web. The formation of these enterprise called as Virtual Enterprise(VE) is becoming a growing trend as enterprises concentrating on core competence and economic benefit. 13us paper proposes multi-agent based task assignment system for VE, which attempts to address the selection of individually managed partners and the task assignment to them A case example is presented to illustrate how the proposed system can assign the task to partners.

A Bicriterion Scheduling Problem with Time/Cost Trade -offs (시간/비용의 트레이드-오프를 고려한 2목적 스케쥴링 문제)

  • 정용식
    • Proceedings of the Korea Society for Industrial Systems Conference
    • /
    • 1998.10a
    • /
    • pp.731-740
    • /
    • 1998
  • This paper discusses a brcriterion approachto sequencing with time/cost trade-offs. The first problem is to minimize the total flow time and the maximum tardiness. And second is to the maximum tardiness and resource allocation costs. This approach , which produces an efficient frontier of possible schedules, has the advantage that it does not require the sequencing criteria to be measurable in the same units as the resource allocation cost. The basic single machine model is used to treat a class of problems in which the sequencing objective is to minimize the maximum completion penalty. It is further assumed that resource allocation costs can be represented by linear time/cost function.

Distribution Planning for Capacitated Supply Chains Using Tabu Search Approach (타부 탐색을 이용한 생산능력 제한하의 공급망 분배계획)

  • Kwon, Ick-Hyun;Baek, Jong-Kwan;Kim, Sung-Shick
    • IE interfaces
    • /
    • v.18 no.1
    • /
    • pp.63-72
    • /
    • 2005
  • In this paper, we present a distribution planning method for a supply chain. Like a typical distribution network of manufacturing firms, we have the form of arborescence. To consider more realistic situation, we investigated that an outside supplier has limited capacity. The customer demands are given in deterministic form in finite number of discrete time periods. In this environment, we attempt to minimize the total costs, which is the sum of inventory holding and backorder costs over the distribution network during the planning horizon. To make the best of the restricted capacity, we propose the look-ahead feature. For looking ahead, we convert this problem into a single machine scheduling problem and utilize tabu search approach to solve it. Numerous simulation tests have shown that the proposed algorithm performs quite well.

Communication Software Development for a Workstation Controller in a CIM System (자동화 공정내의 워크스테이션 제어기 통신 소프트웨어 개발)

  • Do, Sung-Hee;Park, Gyung-Jin
    • Journal of the Korean Society for Precision Engineering
    • /
    • v.9 no.1
    • /
    • pp.34-43
    • /
    • 1992
  • Computer Intergrated Manufacturing (CIM) is an emerging technology which aims at the total automation of a manufacturing system. Despite the extensive research on CIM in this decade, total automation seems to be far from reality for many reasons. In this study, the problems of implementing a CIM system are analyzed and a solution method is suggested. A set of software has been developed and tested for a workstation cotroller which controls closely integrated equipment in the low level of a flexible manufacturing system. The functions of the programs are communications between machines and computers and control of workstation scheduling. The software group is developed on IBM OS/2 operating system with 'c' language to enhance the portability. The usage of the software is presented to users through the Presentation Manager which is menu handler of OS/2 system. Although the software is developed for limited machine equipment, the scheme can be adopted to various machines due to the generality.

  • PDF

최대 지연시간을 고려한 Earliness/Tardiness 모델에서의 스케쥴링

  • 서종화;이동훈;김채복
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 1996.10a
    • /
    • pp.295-298
    • /
    • 1996
  • We consider a nonpreemptive single-machine scheduling problem to minimize the mean squared deviation(MSD) of job completion times about a common due date d with a maximum tardiness constraint, i.e., maximum tardiness is less than or equal to the given allowable amount, .DELTA.(MSD/T$_{max}$ problem). We classify the .DELTA.-unconstrained cases in the MSD/T$_{max}$ problem. We provide bounds to discern each case for the problem. It is also shown that the .DELTA.-unconstrained MSD/T$_{max}$ problem is equivalent to the unconstrained MSD problem and the tightly .DELTA.-constrained MSD/T$_{max}$ problem with n jobs and a maximum allowable tardiness .DELTA. can be converted into the constrained MSD problem with a common due date .DELTA. and n-1 jobs. Finally, the solution procedure for MSD/T$_{max}$ problem is provided. provided.

  • PDF

A Part Release Method Considering Tool Scheduling in FMS (FMS에서 공구 일정계획을 고려한 부품투입 방법)

  • 이충수;최정상
    • Journal of the Korean Operations Research and Management Science Society
    • /
    • v.28 no.1
    • /
    • pp.1-10
    • /
    • 2003
  • A recent trend In flexible manufacturing systems (FMS) Is to utilize the Identical versatile machines with fast tool delivery devices. Unlike a conventional FMS where parts are fed to the machines with the required tools, tools are acquired from other machines using a tool delivery system and parts can be finished on the same machine In these FMS. Therefore it Is more important problem 4o plan tool flow using tool delivery system In these FMS rather than part flow In conventional FMS. According to the existing study, In FMS 20∼30 percent of the total management cost Is the cost related with tools and It Is possible to reduce the tool Inventory by 40 percent using efficient tool allocation. In this study, In FMS under dynamic tool allocation strategy, a new method of part release considering tool flow at the stage of part release Is proposed. In order to prove the efficiency of the proposed part release It is compared with other part release through simulation experiments. Performance measures in these experiments are the throughput and the number of tardy parts.