• Title/Summary/Keyword: MTO

Search Result 53, Processing Time 0.023 seconds

A Preliminary Study on a Method for the Weight Estimation and Calculation of Offshore EPC Projects (해양 공사 EPC 견적용 중량 추산 방법에 관한 기초 연구)

  • Lee, Soo-Ho;Ahn, Hyun-Sik;Heo, Yoon;Bae, Jae-Ryu;Kim, Ki-Su;Ham, Seung-Ho;Lee, Sung-Min;Roh, Myung-Il
    • Journal of the Society of Naval Architects of Korea
    • /
    • v.53 no.2
    • /
    • pp.154-161
    • /
    • 2016
  • There are several existing studies for the weight estimation of offshore plants. However, most of them were applicable at the pre-FEED (Front End Engineering Design) stage. In this paper, a preliminary study on a method for the weight estimation and calculation of offshore EPC (Engineering Procurement Construction) projects is made for the use at the estimation stage after FEED. Based on literature surveys including ISO (International Organization for Standardization) 19901-5 about weight estimation, we proposes new weight factors and a weight curve. Weight factors defined in this study include MTO (Material Take-Off), estimated weight, FEED maturity factor, allowance factor, and contingency factor. The proposed method utilizes bottom-up approach for weight estimation and it can be used for the weight estimation and calculation of offshore EPC projects at the estimation stage.

Simulation Analysis for Job Sequences in a Packaging Film Manufacturing Plant (포장용 필름 제조공장의 작업 우선순위 결정을 위한 시뮬레이션 분석)

  • LIU, JIONGKAI;Seo, Dong-Won
    • Journal of the Korea Society for Simulation
    • /
    • v.31 no.2
    • /
    • pp.1-10
    • /
    • 2022
  • The packaging plastic manufacturing(blown film) industry has long developed in China, but most of them are small/medium-sized enterprises, and it is very rare to have appropriate operation plans suitable for their own business. The packaging plastic manufacturing industry(blown film) follows a typical Make-To-Order method, and the sequence of processing orders is very important. Waste of materials incurred by frequent conversions of production cannot be avoided, and generally, related costs incurred during conversion production are also different. Therefore, this study developed a job sequence determination model for improving operating profits using @RISK simulation software, compared and analyzed 3 actionable clustering treatment methods proposed by technical managers and field experts under the actual situation of the factory.

A Study of Measuring Yield Rate and Error Rate in Steel Pipe Production using Decision Tree Technique (의사결정트리 기법을 이용한 스틸 파이프 생산 수율 및 불량률 측정에 관한 연구)

  • Kim, Woong-Kyung;Kim, Jong-Wan;Kim, Su-Yeon;Nam, In-Gil
    • Journal of Korea Society of Industrial Information Systems
    • /
    • v.14 no.4
    • /
    • pp.116-127
    • /
    • 2009
  • This research aims to improve the efficiency of production by selecting production configuration with high yield rate and lower error rate based on production history of steel pipe. To achieve this, we identify the properties of various types of MTO(make-to-order) steel pipe products and determine properties affecting yield rate and error rate using decision tree technique. From experimental results, we find out that specification is critical to determine yield rate and error rate of ERW steel pipes with mostly small and medium caliber, and an external diameter range in case of roll benders or spiral steel pipes with mostly large caliber. This research classified and embodied the patterns of yield rate and error rate mathematically by product properties.