• Title/Summary/Keyword: Long-term damage

Search Result 650, Processing Time 0.028 seconds

The Optimal Method to Determine Damage Threshold of Rock using Hwangdeung Granite (황등화강암을 이용한 암석의 손상기준 결정방법 연구)

  • Jang, Bo-An;Ji, Hoon;Jang, Hyun-Shic
    • The Journal of Engineering Geology
    • /
    • v.20 no.1
    • /
    • pp.89-100
    • /
    • 2010
  • Although various methods for determination of damage threshold in rock have been suggested, clear damage thresholds were determined by some methods, but different thresholds were measured by other methods. We determined the damage thresholds in Hangdeung granite using all the methods suggested, and investigated the best methods, applicability and errors of each method. The crack initiation threshold and the crack damage threshold which are important in investigation of characteristics of crack development and failure were verified by field strength ratio method and long-term constant load test. The crack closure stress and the crack initiation stress were 57.5 MPa and 77.6 MPa, and the most exact values were yielded by crack volumetric strain. The secondary crack initiation stress was 90.6 MPa and AE event count and AE event count rate were the effective methods. The volumetric stiffness, AE event count and AE event count rate were the most effective methods for determination of crack coalescence threshold and crack coalescence stress was 110.3 MPa. The crack damage stress was 127.5 MPa and was measured correctly by volumetric stiffness and AE event count rate. The ratio between crack initiation stress and uniaxial compressive strength was 0.47 which was very similar with the FSR value of 0.46. The ratio between crack damage stress and uniaxial compressive strength was almost the same as the ratio between long-term strength and uniaxial compressive strength, indicating that the crack initiation stress and the crack damage stress measured were correct.

A Study on the Temporal Correlation of Long-term Exposure Test and Accelerated Corrosion Test of Rebar (장기폭로 시험과 철근 부식 촉진시험의 시간적 상관성에 관한 연구)

  • Lee, Min-Woo;Park, Sang-Soon
    • Journal of the Korean Recycled Construction Resources Institute
    • /
    • v.2 no.4
    • /
    • pp.307-313
    • /
    • 2014
  • Recent interest in the increased structural performance and durability evaluation of this concrete structure in a salt damage environment is increasing. The most secure and reliable method of accelerated corrosion test is a method to carry out the rebar corrosion monitoring can be exposed directly to the marine test site exposure. However, long-term exposure testinghas the disadvantage that a long period is necessary. So, a lot of research on RC of salt damage environment have beenpromoted as alternatives to replace this. However, accelerated corrosion test, in the short term only is appropriate and is but an accelerated test method to evaluate the critical chlorine concentration, there is a difficult problem that you still get the answer. It is one of the correlation problems accelerated test correspond to a certain period of exposure environment. Therefore, in this study, to clarify the differences rebar corrosion beginning, through the actual corrosion accelerated test in corrosion time and laboratory test chamber of the structure of the marine environment results in both environments, it is an object of correlation coefficient derived.

Assessment of Combined Effect of Installation Damage and Creep Deformation of Geogrids (지오그리드의 시공 시 손상 및 크리프 변형의 복합효과 평가)

  • Cho Sam-Deok;Lee Kwng-Wu;Oh Se-Yong;Lee Do-Hee
    • Journal of the Korean Geotechnical Society
    • /
    • v.21 no.5
    • /
    • pp.153-161
    • /
    • 2005
  • A series of installation damage tests and creep tests are performed to assess the combined effect of installation damage and creep deformation far the long-term design strength of geogrid reinforcement. Three types of geogrids are used to investigate the influence of the geogrid types. From the experimental results, it is shown that installation damage and creep deformation of geogrids significantly depends on the polymer types of the geogrids and the larger the installation damage, the more the combined effect of installation damage and creep deformation. In addition, The results of this study show that the tensile strength reduction factor, RF, considering the combined effect between installation damage and creep deformation is less than that calculated by the current design practice which calculates the long-term design strength of geogrids damaged during installation by multiplying two partial safety factors, $RF_{ID}$ and $RF_{CR}$.

Long-term condition monitoring of cables for in-service cable-stayed bridges using matched vehicle-induced cable tension ratios

  • Peng, Zhen;Li, Jun;Hao, Hong
    • Smart Structures and Systems
    • /
    • v.29 no.1
    • /
    • pp.167-179
    • /
    • 2022
  • This article develops a long-term condition assessment method for stay cables in cable stayed bridges using the monitored cable tension forces under operational condition. Based on the concept of influence surface, the matched cable tension ratio of two cables located at the same side (either in the upstream side or downstream side) is theoretically proven to be related to the condition of stay cables and independent of the positions of vehicles on the bridge. A sensor grouping scheme is designed to ensure that reliable damage detection result can be obtained even when sensor fault occurs in the neighbor of the damaged cable. Cable forces measured from an in-service cable-stayed bridge in China are used to demonstrate the accuracy and effectiveness of the proposed method. Damage detection results show that the proposed approach is sensitive to the rupture of wire damage in a specific cable and is robust to environmental effects, measurement noise, sensor fault and different traffic patterns. Using the damage sensitive feature in the proposed approach, the metrics such as accuracy, precision, recall and F1 score, which are used to evaluate the performance of damage detection, are 97.97%, 95.08%, 100% and 97.48%, respectively. These results indicate that the proposed approach can reliably detect the damage in stay cables. In addition, the proposed approach is efficient and promising with applications to the field monitoring of cables in cable-stayed bridges.

Effect of Hypertension on Childhood-onset Systemic Lupus Erythematous in a Tertiary Medical Center in Korea

  • Kim, Jeong Yeon;Cho, Heeyeon
    • Childhood Kidney Diseases
    • /
    • v.24 no.2
    • /
    • pp.107-114
    • /
    • 2020
  • Purpose: The purpose of this study was to evaluate the prevalence, clinical characteristics, and long-term clinical effects of hypertension in Korean childhood-onset systemic lupus erythematous (SLE) patients. Methods: The medical records of SLE patients, diagnosed by 2019 SLE European League Against Rheumatism/American College of Rheumatology (EULAR/ACR) classification criteria, who visited Samsung Medical Center from January 2009 to May 2019 were reviewed. Disease activity and long-term damage were evaluated using the Modified Systemic Lupus Erythematosus Disease Activity Index 2000 (SLEDAI-2K) and the Pediatric Systemic Lupus International Collaborating Clinics/ACR Damage Index (Ped-SDI), respectively. The sex-, age- and height-blood pressure standards recommended by the American Academy of Pediatrics 2017 guideline was used to define hypertension. Results: A total of 32 patients were enrolled in this study. The median follow-up duration was 7.3 years and females were predominant. The median ages at SLE and hypertension diagnoses were 14.2 and 14.3 years, respectively. The biopsy-proven lupus nephritis was detected in 90.6% and 37.5% were class IV. During the follow-up, 12 patients (37.5%) had hypertension. Among them, 2 patients had 3 episodes of posterior reversible encephalopathy syndrome and 5 patients had left ventricular hypertrophy (LVH). Univariate analysis showed baseline hypertension was significantly correlated with a lower estimated glomerular filtration rate, higher body mass index and SLEDAI at baseline. The development of hypertension during the follow-up was significantly correlated with obesity, LVH, and higher Ped-SDI. Conclusion: Our study revealed that hypertension in pediatric SLE is associated with obesity and renal function at SLE diagnosis and could affect long-term damage.

Tunnel-Lining Back Analysis for Characterizing Seepage and Rock Motion (투수 및 암반거동 파악을 위한 터널 라이닝의 역해석)

  • Choi Joon-Woo;Lee In-Mo;Kong Jung-Sik
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 2006.04a
    • /
    • pp.248-255
    • /
    • 2006
  • Among a variety of influencing components, time-variant seepage and long-term underground motion are important to understand the abnormal behavior of tunnels. Excessiveness of these two components could be the direct cause of severe damage on tunnels. however, it is not easy to quantify the effect of these on the behavior of tunnels. These parameters can be estimated by using inverse methods once the appropriate relationship between inputs and results are clarified. Various inverse methods or parameter estimation techniques such as artificial neural network and least square method can be used depending on the characteristics of given problems. Numerical analyses, experiments, or monitoring results are frequently used to prepare a set of inputs and results to establish the back analysis models. In this study, a back analysis method has been developed to estimate geotechnically hard-to-known parameters such as permeability of tunnel filter, underground water table, long-term rock mass load, size of damaged zone associated with seepage and long-term underground motion. The artificial neural network technique is adopted and the numerical models developed in the firstpart are used to prepare a set of data for learning process. Tunnel behavior especially the displacements of the lining has been exclusively investigated for the back analysis.

  • PDF

Experimental investigation of long-term characteristics of greenschist

  • Zhang, Qing-Zhao;Shen, Ming-Rong;Ding, Wen-Qi;Jang, Hyun-Sic;Jang, Bo-An
    • Geomechanics and Engineering
    • /
    • v.11 no.4
    • /
    • pp.531-552
    • /
    • 2016
  • The greenschist in the Jinping II Hydropower Station in southwest China exhibits continuous creep behaviour because of the geological conditions in the region. This phenomenon illustrates the time-dependent deformation and progressive damage that occurs after excavation. In this study, the responses of greenschist to stress over time were determined in a series of laboratory tests on samples collected from the access tunnel walls at the construction site. The results showed that the greenschist presented time-dependent behaviour under long-term loading. The samples generally experienced two stages: transient creep and steady creep, but no accelerating creep. The periods of transient creep and steady creep increased with increasing stress levels. The long-term strength of the greenschist was identified based on the variation of creep strain and creep rate. The ratio of long-term strength to conventional strength was around 80% and did not vary much with confining pressures. A quantitative method for predicting the failure period of greenschist, based on analysis of the stress-strain curve, is presented and implemented. At a confining pressure of 40 MPa, greenschist was predicted to fail in 5000 days under a stress of 290 MPa and to fail in 85 days under the stress of 320 MPa, indicating that the long-term strength identified by the creep rate and creep strain is a reliable estimate.

Acute Pulmonary Thromboembolism: 14 Years of Surgical Experience

  • Park, Jiye;Lim, Sang-Hyun;Hong, You Sun;Park, Soojin;Lee, Cheol Joo;Lee, Seung Ook
    • Journal of Chest Surgery
    • /
    • v.52 no.2
    • /
    • pp.78-84
    • /
    • 2019
  • Background: Pulmonary thromboembolism (PTE) is a life-threatening disease with high mortality. This study aimed to assess the outcomes of surgical embolectomy and to clarify the sustained long-term effects of surgery by comparing preoperative, postoperative, and long-term follow-up echocardiography outcomes. Of 22 survivors, 21 were followed up for a mean (median) period of $6.8{\pm}5.4years$ (4.2 years). Methods: We retrospectively reviewed 27 surgical embolectomy cases for massive or submassive acute PTE from 2003 to 2016. Immediate and long-term follow-up outcomes of surgical embolectomy were assessed on the basis of 30-day mortality, long-term mortality, postoperative complications, right ventricular systolic pressure, and tricuspid regurgitation grade. Results: The 30-day and long-term mortality rates were 14.8% (4 of 27) and 4.3% (1 of 23), respectively. Three patients had major postoperative complications, including hypoxic brain damage, acute kidney injury, and endobronchial b leeding, respectively (3.7% each). Right ventricular systolic pressure (median [range], mm Hg) decreased from 62.0 (45.5-78.5) to 31.0 (25.7-37.0, p<0.001). The tricuspid valve regurgitation grade (median [range]) decreased from 1.5 (0.63-2.00) to 0.50 (0.50-1.00, p<0.05). The improvement lasted until the last echocardiographic follow-up. Conclusion: Surgical embolectomy revealed favorable mortality and morbidity rates in patients with acute massive or submassive PTE, with sustained long-term improvements in cardiac function.

Long-Term Wildfire Reconstruction: In Need of Focused and Dedicated Pre-Planning Efforts

  • Harris, William S.;Choi, Jin Ouk;Lim, Jaewon;Lee, Yong-Cheol
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.923-928
    • /
    • 2022
  • Wildfire disasters in the United States impact lives and livelihoods by destroying private homes, businesses, community facilities, and infrastructure. Disaster victims suffer from damaged houses, inadequate shelters, inoperable civil infrastructure, and homelessness coupled with long-term recovery and reconstruction processes. Cities and their neighboring communities require an enormous commitment for a full recovery for as long as disaster recovery processes last. State, county, and municipal governments inherently have the responsibility to establish and provide governance and public services for the benefit and well being of community members. Municipal governments' comprehensive and emergency response plans are the artifacts of planning efforts that guide accomplishing those duties. Typically these plans include preparation and response to natural disasters, including wildfires. The standard wildfire planning includes and outlines (1) a wildfire hazard assessment, (2) response approaches to prevent human injury and minimize damage to physical property, and (3) near- and long-term recovery and reconstruction efforts. There is often a high level of detail in the assessment section, but the level of detail and specificity significantly lessons to general approaches in the long-term recovery subsection. This paper aims to document the extent of wildfire preparedness at the county level in general, focusing on the long-term recovery subsections of municipal plans. Based on the identified challenges, the researchers provide recommendations for better longer-term recovery and reconstruction opportunities: 1) building permit requirements, 2) exploration of the use of modular construction, 3) address through relief from legislative requirements, and 4) early, simple, funding, and the aid application process.

  • PDF